Summary
Overview
Work History
Education
Skills
Certification
Software
Timeline
Generic

ANUSH MOHAN

Product Engineer
Chennai

Summary

With a bachelor’s degree in mechanical engineering and 11+ year’s field experience in the design of electrical distribution systems (High/Medium Voltage Switchgear/Inverter/UPS) my goal is to find a full- time Engineering role and continue to provide product design and engineering services in industrial environments, where my resourceful experience and academic skills will add value to organizational operations

Overview

12
12
years of professional experience
6
6
years of post-secondary education
3
3
Certifications

Work History

Team Manager III (HV/MV Switch Gear System)

Hubbell Incorporation
01.2024 - Current
  • Leading a team of 7 engineers in the design and Implementation of Electrical system (LV/MV switchgear, Air Insulated Switchgear, Primary Metering) as per Sales Order.
  • Collaborated with cross-functional teams to integrate multi-level product functions onto a single platform
  • Conducted detailed product testing and validation ensuring compliance with international standards, including IEEE/NEMA/UL/IEC
  • Involved in revising technical documentation, maintenance manuals and system operation guidelines.
  • Enhanced team productivity by implementing efficient task delegation and time management strategies.
  • Achieved project deadlines consistently by closely monitoring progress and proactively addressing any potential roadblocks.
  • Established clear performance metrics, enabling transparent evaluation of team progress.
  • Boosted employee satisfaction through regular performance reviews, constructive feedback, and personal development plans.

Engineer - I (HV/MV Switch Gear System)

Hubbell Incorporation
05.2022 - 12.2023
  • Detail study on the existing Legacy product lines & evaluating a concept for the product enhancement
  • Detail design study on the existing EC switch for mechanical semaphore enhancement
  • Conduct a feasibility study for the newly added feature for production compatibility
  • Prototype & evaluate the Mechanical semaphore (enhancement feature) on the product
  • Attend Pre/Post DVP (Design validation plan) to understand feasibility solutions
  • Evaluating the design & performing required updates as per the simulation /external testing
  • Defined functionality and operability requirements of pre-production designs to be used in manufacturing
  • Conducted research to test and analyze system feasibility and performance
  • Conduct feasibility study on the new cost saving process & interpret organizational impact on the product line
  • Design review meetings with client to incorporate new requirements & modifications
  • Maintained project schedule by monitoring project progress, coordinating activities and issue resolving
  • Awarded best innovation award for Utility & Automation business unit (Product Feature enhancement)
  • Proposed $40 dollar saving on the existing product line (Annual Volume - 120 qty)

Project Engineer

CE+T Power Solution
10.2018 - 05.2022
  • Design of new Mechanical enclosure & Front panels for Inverter modules
  • Development of Fixtures to analyze the system in a real-time environment
  • Mechanical gauges are designed to comply with customer shelf requirements
  • Heat Sink design & evaluation for IP55 enclosures
  • Making appropriate design changes as per thermal analysis & Cross-functional team comments
  • Design of Front plastic for new Inverter modules
  • Design review meetings with client to incorporate new requirements & modifications
  • Design & Development of Packaging for New & Legacy products in CE+T Group
  • Design study on Legacy products for Cost reduction recommendations (VAVE)
  • Vendor interaction & Cost report generation as per VAVE modifications
  • Development of Power module system as per customer load requirement
  • Preparing Mechanical plan & BOM in ERP system as per new system design requirement
  • Successfully saved €750 on the single product which has an annual volume of 250 qty (Flexa Sub Rack system (Standalone Inverter)
  • Successfully deployed Nokia 48Kva sub-rack system design - Belgium & ACS Metro grid (UPS System for Verizon Telecommunication System)

Member Technical Staff

HCL Technologies
08.2014 - 09.2018
  • Design & Development of Class II & Class III medical devices and maintaining design history file, product specification, traceability matrices
  • Development of design verification reports and other design control documents
  • Identify gaps in DHF & Risk management file for legacy products with respect to ISO13485 & 21CFR 820.30
  • Develop plans to ensure gap remediation of DHF & conduct reviews with cross-functionality teams
  • Concept development, detail engineering & fixture development for reliability testing of the product
  • Evaluating the existing material BOM for environmental compliance related to CE/UL Marking
  • Developing a material management plan for all Obsolete inventory & new inline products
  • Coordinating lab activities for reliability protocol run & report generations
  • Attend Pre/Post DVP (Design validation plan) to understand feasibility solutions
  • Design review meeting with the clients to understand the requirements of various stakeholders related to product compliance
  • Design support of Nextgen diagnostic Instrument (HT-Dory & HT- Mack)
  • Design study on Legacy products for Cost reduction recommendations (VAVE)
  • Vendor interaction & Cost report generation as per VAVE modifications
  • Making a detailed presentation on diagnostic technologies with team members for better product understanding
  • Successfully compiled 8 Diagnostic devices with EU regulation for CE marking
  • Submitted a reported cost saving of $8K per year on the NextGen diagnostic devices

Graduate Trainee

Bharat Electronics Limited (Govt)
07.2013 - 07.2014
  • Legacy CAD conversion from 2D to 3D Cad models
  • Detail Engineering for new ideas & proposals
  • Developing Assembly protocols to resolve in-house assembling issues
  • Analyze post SOP field issue & identify the root cause of the issue & raise appropriate design correction with standard approval from the project leader
  • Creating ECO/ECR for engineering updates & following up with the respective team for approvals
  • Worked on Designing New RF 514 Cable Housing
  • Worked on AK- 630 Gun Control System & RF Filters control systems (Assembly Protocol design)

Education

B.E - Mechanical

SSIET (Anna University)
06.2009 - 04.2013

Higher Secondary School (XII) - undefined

Tamil Nadu Board Secondary Education
06.2008 - 04.2009

Intermediate School (X) - undefined

Tamil Nadu Board Secondary Education
06.2006 - 04.2007

Skills

    Project Management

    Excellent communication

    Product Design & Development

    Fixture & Module Gauge Development

    Analytical Problem Solving

    Teamwork and collaboration

Certification

Master Lean Six Sigma professional, Simplilearn, 07/01/22, 07/01/23

Software

Solidworks, Autodesk (Inventor/AutoCad)

SAP 60

Lean Six Sigma

Timeline

Team Manager III (HV/MV Switch Gear System)

Hubbell Incorporation
01.2024 - Current

Engineer - I (HV/MV Switch Gear System)

Hubbell Incorporation
05.2022 - 12.2023

Project Engineer

CE+T Power Solution
10.2018 - 05.2022

Member Technical Staff

HCL Technologies
08.2014 - 09.2018

Graduate Trainee

Bharat Electronics Limited (Govt)
07.2013 - 07.2014

B.E - Mechanical

SSIET (Anna University)
06.2009 - 04.2013

Higher Secondary School (XII) - undefined

Tamil Nadu Board Secondary Education
06.2008 - 04.2009

Intermediate School (X) - undefined

Tamil Nadu Board Secondary Education
06.2006 - 04.2007
ANUSH MOHANProduct Engineer