Excel
• Prepare for HDD operation for HDPE pipe pulling following conditions to reduct Gyroscopic Pipeline mapping to gather underground utilities.
• Prepare TCP Plan with Project Engineer with Daily basic Implementation on Site Check out Signage at Work location area.
• Prepare Microsoft project projects schedule for monthly &weekly basis.
• Arrange Technical meetings with Consultant on site technical issue& drawing issue.
• Prepare Job Measurement for claims.
• Site visit and measurement for estimation.
• Attending daily meeting and collect defect record sheet with Power Grid officers
• Apply NCE for excavation work Engage with sub con and arrange work for Milling Patch Team
• Develop curriculum for ongoing safety training on topics such as avoiding workplace accidents, equipment safety, disaster response and first aid
• Update health and safety policies for employee handbooks to adhere to industry standards and best practices
Collaborate with department leaders to receive feedback on common workplace hazards and implement systems to improve the work environment for all team members
• Created checklists to identify dangerous materials, potential hazards and unsafe business practices in the workplace
• Reviewed local workplace safety guidelines, compared them to workplace policies and identified discrepancies
• Analyzed working conditions of workspaces to make suggestions for improvements for enhanced security
Project 1: PWD Puducherry (Karaikal) Under “Water Pipeline “ Period (May2018-April 2021).
Project 2: PWD Puducherry “Swadesh Darshan Scheme “(HUDCO)
Period (April2021-March2022).
• Produce procurement schedules for the jobs and ensure site has adequate resources to complete the tasks.
• Ensure quality control and carrying out testing of materials in accordance with the specification requirements.
• Control and monitor site waste in accordance with
Municipal rules and ensure proper removal of site debris. Responsible for performing tasks within piping codes and standards piping specifications and regulations.
• Analysis pipeline operational data and work with pipeline scheduler and pipeline controllers to make adjustment in pipeline.
• Took part in the constructions of bridges and highway road development foundation plans.
• Acting as Technical Advisor, direct and supervise day-to-day operations and resolve any technical issues that may arise.
• Maintaining proper records of materials and labor and details of work carried out day to day.
Scheduling and Planning
Documentation Control
Health and safety
AutoCAD proficiency
Procurement Management
Surveying Techniques
Construction management
TOPIC : Characteristics of Partial replacement of reinforcement steel by Bamboo.
DESCRIPTION: Replacement of steel with bamboo in concrete to evaluate feasibility of the use of Bamboo as reinforcement in concrete to reduce its cost of construction, light weight concrete beam and to analyze Flexural behavior of 0% to 75% of bamboo
beam
Excel
AutoCAD
Staad-PRO
I hereby declared that all the above information furnished is true and correct to the best of my knowledge and belief. I am willing to relocate anywhere as per the company’s requirement.