Summary
Overview
Work History
Education
Skills
Software
Work Availability
Timeline
Generic
Arun Kumar Vaish

Arun Kumar Vaish

Instrumentation Engineer
Greater Noida,UP

Summary

I am an Instrumentation Engineer with more than 16+ years of thorough experience within the Power and Energy sector as well as Maritime and water sector (PMC) including Oil and Gas sector in India and on international Projects. I am a B. Tech. Electronics and Instrumentation graduate.

Successfully demonstrated the Erection testing and Commissioning activities at various projects. Have thorough knowledge of SCADA, DMS, OMS and all the Electrical (LV & HV side) and DCS, ESD, FSGDS, Telecom & Instrumentation systems as required for complete Automation of the Plants.

I am keen to share experience and expertise to manage the complete Instrumentation and Electrical systems at Site for the industry and personal growth.

Overview

16
16
years of professional experience
4
4
years of post-secondary education
2
2
Language

Work History

Instrumentation Lead

Royal HaskoningDHV
Noida
10.2021 - Current
  • Check and review EPC Contractor's Documents such as design drawings, manuals, schedule and associated documents for Start-up, Pre-commissioning and Commissioning.
  • Technical review for the dispatch clearance of various supplies, Material Receiving Inspections, review of manufacturer's Test certificates.
  • Erection and installation quality checking by suitable Walkdowns and generation of Punch points. Attending and resolving the technical matters / issues related to erection and inspections. Approval of the Erected systems.
  • Attending Weekly Progress Review meetings, preparing the MOM's, drafting of the Emails, and assisting the Contracts manager to issue the Contractual letters, in close coordination.
  • Analyzing and checking the RA Bills submitted by the EPC for correctness of the claim with respect to the BBU and the actual work done at site etc. and support the Billing Engineer.
  • Project progress vis-à-vis the EPC Schedule, monitor and give feedback to management regarding the recovery/catchup plan in case of delays. Monitor the Contract Milestones and give inputs to management.
  • Routine works such as field inspections, system start-ups and foresee the operational issues and suggest remedies for successful commissioning of the project and smooth operation of the Project during O&M Phase
  • Led projects and analyzed data to identify opportunities for improvement.
  • Conducted research, gathered information from multiple sources and presented results.
  • Identified issues, analyzed information and provided solutions to problems.
  • Participated in team-building activities to enhance working relationships.

Project Manager SCADA

Deux Project Limited
LAGOS
01.2016 - 07.2020
  • Managed team of employees, overseeing hiring, training and professional growth of employees.
  • Worked with customers to understand needs and provide excellent service.
  • Devoted special emphasis to punctuality and worked to maintain outstanding attendance record.
  • Created plans and communicated deadlines to complete projects on time.
  • Developed and implemented performance improvement strategies and plans to promote continuous improvement.
  • Planning & Execution: Route survey supervision, BOQ preparation, tendering, cost comparison, technical evaluation, Order Awarding & construction of SCADA-DMS Control Centre, Measurement, material inspection, Testing & Energizing & Certification of contractor bills.
  • Review of vendor document like Control room layout diagram, Electrical drawing &Control wiring diagram, system architecture, FDS documents, FAT and SAT documents.
  • Supervise modeling of 132/33/11kV EKEDP network single line diagram in ETAP Model.
  • Supervise SCADA Screen development. Preparation of survey reports and project progress reports. Project Coordination meeting with vendor as well as Client.
  • Finalization of System FAT, IT Hardware FAT, RTU and FRTU FAT. Involve in installation and commission of RTU & FRTU units in substation.

Instrument Engineer – Pre-Comm. & Commissioning

Hyundai Engineering & Construction
Al-Ahmadi
12.2013 - 10.2015
  • Developed and implemented performance improvement strategies and plans to promote continuous improvement.
  • Increased customer satisfaction by resolving issues.
  • Conducted research, gathered information from multiple sources and presented results.
  • Performed the integrity check and first power up of control panel and carried out loop check and function test of field instrument from DCS/ESD/FGS workstations.
  • Review of vendor document like marshalling & system cabinet drawing & wiring diagram, system architecture, Interconnection Diagram of DCS with other packages. Interface of package equipment with plant DCS and ESD system.
  • Review and raised the comments as per Customer's requirement.
  • Involved in Site Acceptance Tests (SAT) of Distributed Control System- Foxboro-Invensys and metering skid- FMC Technologies-Metering system, Gas Analyzers, compressor Skid, for Control Systems and Local Control Panels Vendor Equipment's.

Senior Executive – Projects

Noida Power Company Limited
Greater Noida
07.2012 - 11.2013
  • Offered friendly and efficient service to customers, handled challenging situations with ease.
  • Successfully maintained clean, valid driver's license and access to reliable transportation.
  • Used coordination and planning skills to achieve results according to schedule.
  • Developed team communications and information for meetings.
  • Received and processed stock into inventory management system.
  • Learned new skills and applied to daily tasks to improve efficiency and productivity.
  • Improved operations through consistent hard work and dedication.
  • Monitored company inventory to keep stock levels and databases updated.
  • Created plans and communicated deadlines to complete projects on time
  • Job Function
  • Planning & Execution 11kV & 33kV of power lines: - Route survey, BOQ, preparation, tendering, cost comparison, technical evaluation, Order Awarding & construction of lines with supervision, Measurement, material inspection, Testing & Energizing & Certification of contractor bills.
  • Installation of 11kV RMU: - Route survey, BOQ preparation, cost comparison, technical evaluation, Order Awarding & Installation of 11kV RMU at urban sector & Industrial. 11kV Feeder Evacuation from new 33/11kV Substation. Handling of 11KV breakdowns with coordination 66/33/11 KV substations team.

Senior Engineer – Projects

Schneider Electric India private limited
Delhi
10.2008 - 07.2012
  • Actively listened to customers, handled concerns quickly and escalated major issues to supervisor.
  • Participated in team-building activities to enhance working relationships.
  • Maintained excellent attendance record, consistently arriving to work on time.
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
  • Exceeded goals through effective task prioritization and great work ethic.
  • Created plans and communicated deadlines to complete projects on time.
  • Prepared variety of different written communications, reports and documents.
  • Drove operational improvements which resulted in savings and improved profit margins.
  • Increased customer satisfaction by resolving issues.
  • Projects Completed with Schneider Electric
  • Distribution Automation projects for 900 Substations for Tata Power (Erstwhile NDPL).
  • 5 MW PV Solar Power Project at Osiyan Rajasthan for Aston field Solar (One of the First MW Solar Plants in India)
  • 3 MW PV Solar Power Project at Mulshi, Pune for Tata Power Projects.
  • RMU Installation project for Tata Power Projects
  • HT Panel Automation for HSEB.
  • Unmanned 33/11 kV Grid substation at Tigipur Delhi for Tata Power.
  • Remote Load shedding at LT level for Tata

Application Engineer

Tycon Automation Pvt. Ltd
06.2007 - 11.2008
  • Tycon Automation is a leading solution provider of the Electrical & Automation domain covering most of the sectors in Electrical Energy, Power, Process Industries, Infrastructure and Building markets
  • Worked on many Process Automation/SCADA projects during my tenure at Tycon Automation
  • A few project completed in this tenor
  • Bharat Sugar, Sidhwalia, Bihar & HATA Sugar Bihar- Sugar Refinery
  • Shakti Sugar-I & Shakti Sugar-II, Sakti Nagar- Sugar Refinery
  • Reverse Air Bag House, Coal Mill Bag Filter & VRM – Dalmia Cement, Andhra Pradesh
  • AMC Service to Sugar Refineries

Education

B-Tech - Electronics And Instrumentation

RGEC, Uttar Pradesh Technical University
Meerut
06.2003 - 07.2007

Skills

Process Logic Development

undefined

Software

Advance Excel

MS project

ETAP

PLC Programming Software

RTU & MTU Software

Protection relay (Sepam)

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Instrumentation Lead

Royal HaskoningDHV
10.2021 - Current

Project Manager SCADA

Deux Project Limited
01.2016 - 07.2020

Instrument Engineer – Pre-Comm. & Commissioning

Hyundai Engineering & Construction
12.2013 - 10.2015

Senior Executive – Projects

Noida Power Company Limited
07.2012 - 11.2013

Senior Engineer – Projects

Schneider Electric India private limited
10.2008 - 07.2012

Application Engineer

Tycon Automation Pvt. Ltd
06.2007 - 11.2008

B-Tech - Electronics And Instrumentation

RGEC, Uttar Pradesh Technical University
06.2003 - 07.2007
Arun Kumar VaishInstrumentation Engineer