Summary
Overview
Work History
Education
Skills
Awards & Achievements
Software
Timeline
AccountManager
ARUN KUMAR LENKA

ARUN KUMAR LENKA

Mechanical Engineer
Cuttack

Summary

Hardworking mechanical engineer bringing 6 years of experience performing diverse maintenance and repair duties. Dedicated to maintaining optimal equipment functionality by managing routine and complex equipment and facility matters. Strong knowledge of hand and power tool operation and safety measures. Proven track record in optimizing maintenance schedules, enhancing equipment reliability, and leading teams to achieve operational excellence. Skilled in machine alignment and effective communication, driving continuous improvement in plant performance

Overview

6
6
years of professional experience

Work History

Sr. Engineer (Mechanical Maintenance)

Shri Bajrang Power And Ispat Ltd.
05.2025 - Current
  • Overseeing the maintenance, troubleshooting, and repair of rotary kilns and coolers, ensuring optimal performance and minimizing downtime.
  • Kiln & Cooler support roller bearing greasing in monthly basis and each shut down work.
  • Managing the maintenance of bag filters and dust conveying systems to ensure efficient dust collection and compliance with environmental standards.
  • Ensuring the proper operation of lobe and screw compressors, performing routine checks, and managing repairs to maintain reliable compressed air supply.
  • Overseeing the operation and maintenance of vibrating screens and magnetic separators to ensure effective material separation and processing.
  • Supervising maintenance of conveyor lines, checking for wear and tear, and ensuring proper alignment, lubrication, and belt tension.
  • Ensuring the performance and reliability of centrifugal pumps, including monitoring flow, pressure, and performing necessary repairs or replacements.
  • Optimized hydraulic systems performance by engineering weekly diagnostic checks and implementing corrective actions.
  • Developing and implementing preventive maintenance schedules, conducting condition monitoring, and using predictive maintenance techniques to reduce unplanned downtime.
  • Material management like material requisition, purchase indent, Inventory and cost control.
  • Identifying the root causes of mechanical failures and implementing corrective actions to prevent recurrence and improve equipment reliability.
  • Leading and mentoring a team of technicians, coordinating maintenance activities, and ensuring that all tasks are performed efficiently, safely, and in compliance with plant standards.
  • Documented and maintained comprehensive repair log of equipment malfunctions and corrective actions.

Engineer (Mechanical Maintenance)

Shri Bajrang Power And Ispat Ltd.
09.2021 - 04.2025
  • Performing scheduled maintenance tasks on critical equipment like rotary kilns, rotary coolers,centrifugal pumps, and vibrating screens to ensure continuous plant operation.
  • Troubleshooting mechanical problems in equipment such as lobe compressors and conveyors, and implementing corrective actions to minimize downtime.
  • Supporting larger repair activities, including dismantling and reassembling machinery like ID fans and screw compressors, to ensure they meet operational standards.
  • Maintenance of pollution device like bag filter, it involves cleaning, replacing, and inspecting the filter bags to ensure the system's efficiency and to extend the lifespan of the filter housings.
  • Documenting all maintenance activities, including inspections, repairs, parts replaced, and performance data, to track equipment health and assist with future planning.


Supervisor (Mechanical Construction)

Power Mech Projects Limited
07.2011 - 10.2013
  • Gaining practical experience in mechanical installation activities for 2×685MW Raipur Thermal Power Project (GMR Chhattisgarh Energy Limited) under Doosan Power System India Limited, ensuring compliance with technical specifications and safety standards.
  • Listing out material required for execution from drawing and schedule of balance work as per release for constructions (RFC) Drawings.
  • Preparing the plan for structural erection, after erection checking the alignment & checking the protocol & complete the process of erection, alignment, bolting, fixing & welding with our client.
  • Monitor daily site operations, resolve technical challenges, and optimize resource utilization for efficient project delivery.
  • Coordinate with project managers, engineers, and subcontractors to ensure smooth execution of the project on time.
  • After completion of monthly progress to check the subcontractor billing for certification & proceed to same.
  • Facilitate the training of personnel and ensure safety measures are implemented to prevent accidents and enhance operational efficiency.

Education

Bachelor of Technology - Mechanical Engineering

Bhubaneswar Institute of Industrial Technology
Bhubaneswar,Odisha
04.2001 -

Diploma - Mechanical Engineering

Orissa Institute of Engineering And Technology
Dhenkanal,Odisha
04.2001 -

Skills

Predictive maintenance

Awards & Achievements

Best Employee Award, Shri Bajrang Power And Ispat LTD (2023-2024)

Software

Microsoft Dynamics 365 Business Central

SAP

AutoCAD

Microsoft Office (Excel, Word, PowerPoint)

Microsoft OneDrive

Google Drive

Timeline

Sr. Engineer (Mechanical Maintenance)

Shri Bajrang Power And Ispat Ltd.
05.2025 - Current

Engineer (Mechanical Maintenance)

Shri Bajrang Power And Ispat Ltd.
09.2021 - 04.2025

Supervisor (Mechanical Construction)

Power Mech Projects Limited
07.2011 - 10.2013

Bachelor of Technology - Mechanical Engineering

Bhubaneswar Institute of Industrial Technology
04.2001 -

Diploma - Mechanical Engineering

Orissa Institute of Engineering And Technology
04.2001 -
ARUN KUMAR LENKAMechanical Engineer