Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic
ARUN PANDIYAN VIGNESWARAN

ARUN PANDIYAN VIGNESWARAN

Chennai,TN

Summary

Accomplished E&I professional with a proven track record in delivering complex projects with precision and safety compliance. Expert in problem-solving and decision-making under pressure, consistently leading teams to achieve 100% adherence to standards. Skilled at fostering collaboration, optimizing workflows, and driving continuous improvement to meet project objectives efficiently.

Overview

18
18
years of professional experience
4
4
Certification

Work History

E&I Quality and Hazardous Area Compliance Lead

Larsen & Toubro Hydrocarbon Engineering
07.2024 - Current

Project: CERES Urea Plant Development Modularization project with Saipem Clough Joint Venture (AS/NZS standards)


  • Led a team of 15 inspectors, managing daily job identification, prioritization, and task allocation to ensure streamlined workflows and strict compliance with project standards. Improved task turnaround time by 20% through efficient scheduling and resource optimization. Maintained effective communication channels, monitored progress, and proactively resolved operational challenges, contributing to a 15% reduction in rework and ensuring 100% adherence to safety and quality requirements.
  • Supervised electrical, instrumentation, and telecom activities in the Main Module, verifying compliance with design specifications and safety requirements.
  • Managed fabrication and installation quality , coordinated subcontractor manpower, and aligned tasks with project schedules.
  • Oversaw site inspections, certification, and compliance audits , including pre-design planning, specification checks, start-up, and commissioning.
  • Prepared and enforced method statements for E&I installation work , ensuring strict adherence to approved procedures and hazardous area integrity.
  • Maintained EEHA dossiers and inspection records , ensuring traceability and regulatory conformity.
  • Achieved 100% compliance with IECEx/ASNZS standards across 1,250 Ex devices inspected and certified.
  • Reduced non-conformities by 15% through proactive quality checks and vendor coordination.
  • Managed 15 subcontractors and 320+ personnel across multiple modules with zero safety incidents.
  • Verified and signed off 100% of ITRs for electrical and mechanical completion within planned timelines.

Lead EX Inspector

QATAR ENERGY Offshore
01.2023 - 05.2024

Location: PS-1 offshore Platform & Halul Island (Running Assets)

  • Successfully led a team of eight inspectors, overseeing daily job identification, prioritization, and task distribution to ensure efficient workflow and compliance with project standards. Maintained clear communication, monitored progress, and resolved operational challenges to achieve timely and quality outcomes.
  • Conducted periodic and detailed inspections of Ex-rated electrical equipment in Zone 1 and Zone 2 areas to ensure compliance with IECEx/ATEX and company standards.
  • Verified integrity of explosion-protection features (flame paths, gaskets, cable glands, IP ratings) during routine.
  • Performed visual, close, and detailed inspections as per EEHA inspection schedules and risk-based maintenance plans.
  • Identified and reported non-conformities , recommended corrective actions, and supervised rectification work.
  • Coordinated with operations and maintenance teams to plan inspections without impacting production.

Lead E&I Engineer / Lead EX Inspector

Bumi Armada Berhad
11.2019 - 12.2022

Project: FPSO Armada Sterling V (VLCC to FPSO Conversion),

  • Led fabrication, installation, integration, inspection, mechanical completion, pre-commissioning, commissioning, and handover of marine and topside modules.
  • Coordinated closely with safety, engineering, procurement, and multidisciplinary teams to ensure compliance and timely execution.
  • Monitored and controlled construction activities for all topside modules , including inspection, cable termination, and mechanical completion per ATEX standards .
  • Verified and signed off Electrical & Mechanical completion of ITRs , ensuring readiness for commissioning.
  • Made on-site decisions for design adjustments and changes based on site conditions and project requirements.
  • Planned and coordinated resources and equipment for safe, timely, and cost-effective execution.
  • Supervised Completions and Unit staff during energization and commissioning , managing PC-ITRs through start-up and transition to maintenance phase.

E&I Project Engineer

MODEC International
01.2018 - 10.2019

Project: FPSO Gato do Mato (VLCC to FPSO conversion)

  • Reviewed client specifications and P&IDs , ensuring alignment with purchase order requirements and project standards.
  • Developed and implemented Project Execution Plans , including preparation and monitoring of schedules for engineering, drafting, procurement, and fabrication.
  • Coordinated engineering and construction activities , ensuring deliverables met schedule and budget constraints.
  • Communicated effectively with vendors, suppliers, and interdisciplinary teams , expediting documentation and resolving technical queries.
  • Managed procurement follow-up and vendor progress , ensuring timely delivery of materials and compliance with specifications.

Electrical & Instrumentation Engineer

Hyundai Heavy Industries
07.2013 - 12.2017

Engineering & Vendor Review – Hess & Petronas Bergading CPP

  • Managed technical clarifications and vendor drawing reviews for CPP and WHPs.
  • Supported basic and detailed engineering , including 3D model clash checks.
  • Coordinated procurement and integration of critical systems for offshore processing.

Engineering Support – Total Egina FPSO

  • Participated in design review and vendor documentation for topsides modules.
  • Assisted in procurement and interface management for instrumentation and control systems.
  • Ensured compliance with project specifications and offshore standards.

EEHA Engineer – INPEX Ichthys Projects (CPF & Venturer FPSO)

  • Performed detailed inspections of Ex d, Ex e, Ex i equipment and verified installation integrity.
  • Developed and maintained EEHA dossiers , equipment registers, and inspection reports.
  • Reviewed vendor packages for compliance and supported commissioning activities.

Instrumentation and Control Engineer

PETRO6 ENGINEERING AND CONSTRUCTION LTD
08.2007 - 05.2013

Instrument & Control Engineer
Deputed to Cairn India Limited – Delhi

  • Led design and detailed engineering for greenfield and brownfield projects, ensuring compliance with industry standards and project timelines.
  • Developed design basis documents , prepared instrument index , material take-offs (MTOs) , and conducted technical bid evaluations for vendor selection.
  • Generated comprehensive I/O lists , cable schedules , and junction box wiring diagrams to support accurate installation and commissioning.


Projects Handled

  • Rageshwari Gas Terminal (RGT)

Executed additions and modifications to improve gas processing capacity and reliability.
Delivered instrumentation design updates and integration with existing systems.

  • Mangala Field Development

Supported expansion and optimization of crude oil production facilities.
Provided detailed engineering for instrumentation and control systems during brownfield modifications.

  • Aishwariya Oil Field

Contributed to instrumentation design for new well pads and associated facilities.
Ensured compliance with hazardous area standards and project specifications.

Education

Bachelor of Engineering - INSTRUMENTATION AND CONTROL

ANNA UNIVERSITY
CHENNAI
05-2007

Skills

  • Problem Solving
  • Active Listening
  • Keen to Learn
  • Social Perceptiveness
  • Adaptability
  • Collaboration & Teamwork
  • Continuous Improvement
  • Mentorship & Knowledge Sharing
  • Decision-Making Under Pressure
  • Project Ownership
  • Safety & Compliance Excellence

Certification

IECEX CopC (ALL MODULES)

EEHA (AUSTRALIA/NZ STANDARDS)

COMPEx (EUROPEAN STANDARD)

HAZARDOUS AREA PLANNING AND DESIGN (IEC 60079.14 AND IEC 60079.17)

BOSIET / HUET (OPITO)

HYDROGEN SULPHITE SAFETY (OPITO)

Languages

English
Bilingual or Proficient (C2)
Hindi
Bilingual or Proficient (C2)
Tamil
Bilingual or Proficient (C2)
Telugu
Bilingual or Proficient (C2)

Timeline

E&I Quality and Hazardous Area Compliance Lead

Larsen & Toubro Hydrocarbon Engineering
07.2024 - Current

Lead EX Inspector

QATAR ENERGY Offshore
01.2023 - 05.2024

Lead E&I Engineer / Lead EX Inspector

Bumi Armada Berhad
11.2019 - 12.2022

E&I Project Engineer

MODEC International
01.2018 - 10.2019

Electrical & Instrumentation Engineer

Hyundai Heavy Industries
07.2013 - 12.2017

Instrumentation and Control Engineer

PETRO6 ENGINEERING AND CONSTRUCTION LTD
08.2007 - 05.2013

Bachelor of Engineering - INSTRUMENTATION AND CONTROL

ANNA UNIVERSITY
ARUN PANDIYAN VIGNESWARAN