ARVIND RAJENDRA YADAV

ARVIND RAJENDRA YADAV

Siwan

Summary

Mechanical Engineer with 6+ years of hands-on experience in boiler erection, fabrication, and piping & structural installation projects. Proven expertise in AFBC boiler systems, welding inspection, and site execution. Skilled in managing end-to-end erection activities, ensuring quality standards, safety compliance, and timely project completion. Experienced in working with leading companies like Uttam Energy, Alfa Boiler, Hitechno control system, and The excellent consultancy heat divison . Strong knowledge of fabrication drawings, site coordination, and troubleshooting during installation.

Overview

7
7
years of professional experience
6045
6045
years of post-secondary education

Work History

Site Engineer

Uttam energy Pvt Ltd pune
Pune
12.2024 - 01.2026
  • Executed AFBC boiler erection and fabrication activities, including structural assembly and installation of boiler components
  • Supervised boiler fabrication work, ensuring proper fit-up, alignment, and assembly as per drawings
  • Managed piping and pipeline fabrication & erection, including cutting, fit-up, routing, and support installation
  • Monitored structural erection and fabrication, ensuring dimensional accuracy and proper installation
  • Coordinated and monitored welding activities, ensuring joints were prepared and executed as per standard practices
  • Performed fit-up checks and visual inspection of weld joints to maintain required quality standards
  • Assisted in boiler and pipeline inspection & testing activities at site
  • Handled manpower and contractor coordination for smooth execution of fabrication and erection work
  • Ensured compliance with site safety standards and procedures
  • Maintained daily progress reports and site documentation

FACILITY MANAGER

THE EXCELLENT CONSULTANY OF HEAT DIVISION
12.2022 - 10.2024
  • 20 TPH ATOMUSPHERIC FLUIDIZED BED COMBUSTION (MAKE : THERMAX LIMITED) RESPONSIBLE FOR THE SAFE AND EFFICIENT OPERATION OF CIRCULATING FLUIDIZED BED COMBUSTION BOILER INCLUDING MONITORING PERFORMANCE ROUTINE MAINTENANCE TASK TROUBLESHOOTING MALFUNCTION AND ENSURING COMPLIANCE WITH SAFETY REGULATION ALL WHILE OPTIMIZING FUEL EFFICIENCY AND MINIMIZING EMISSION.
  • DUTY OF RESPONSIBILITIES:
  • MONITORING PARAMETER LIKE BOILER PRESSURE TEMPERATURE, FUEL FEED RATE, AIR FLOW AND FLUE GAS EMISSION.
  • ADJUSTING OPERATIONAL CONTROL OF MAINTENANCE OPTIMAL BOILER PERFORMANCE.
  • MANAGING START -UP AND SHUTDOWN PROCEDURE FOR THE BOILER.
  • PERFORMING ROUTINE INSPECTION INCLUDING FLUIDIZED BED BURNER HEAT EXCHANGER AND AUXILIARY EQUIPMENT MONITORING AND ADJUSTING BOILER WATER CHEMICAL TO PREVENT CORROSION AND FOULING.
  • RECORDING OPERATIONAL DATA INCLUDING FUEL CONSUMPTION STEAM PRODUCTION AND EMISSION LEVELS.

SITE ENGINEER

HITECHNO CONTROL SYSTEM PVT. LTD
MAHARASHTRA
09.2021 - 10.2022
  • 15 TPH SLOP FIRED BOILER (MAKE - FC KCP) BOILER FEBRICTION & ERECTION OF PRESSURE PART.
  • STEAM PIPING NON, PRESSURE PART PRE, COMMISSIONING ACTIVITIES OF FAN PUMPS FUEL FEEDING SYSTEM
  • HYDRO TEST OF BOILER REFRACTORY TRYOUT ALKALI BOIL OUT AND STEAM BLOWING ACCORDING TO OUR PROCEDURE.

SITE ENGINEER

ALFA BOILER PVT.LTD
PUNE
01.2019 - 08.2021
  • ERECTION & COMMISIONING WORK OF:
  • STEAM TURBINE GENERATOR
  • COAL HANDLING PLANT
  • AIR COOLED CONDENSER
  • WATER TREATMENT PLANT & ETP
  • AFBC BOILER

Education

B.TECH - MECHANICAL ENGINEERING

ARAVALI INSTITUTE OFTECHNICALSTUDIES OFUDAYPUR

12th -

S.B.S.I.C RATASIYA KOTHICOLLEGE

10th -

M.S.V.DHOLGARWADI CHANGAD

Skills

  • Proficiency in MS Office (Word, Excel)
  • Boiler erection (AFBC/CFBC/WHRB /FBC)
  • Fabrication & welding inspection
  • Piping erection & isometric reading
  • Structural erection & alignment
  • NDT & hydro testing
  • Site supervision & team handling

Disclaimer

I hereby declare that the information furnished above is true to my knowledge.

Roles And Responsibilities

  • Erection and commissioning work of power plant mechanical system, devices & machinery.
  • Measuring the performance of mechanical work.
  • Prepared Project progress report & review with H.O team.
  • Project planning.
  • Prepared a variety of different written communication, reports and documents to ensure smooth operations.
  • Planned EPC Projects from beginning to end, focusing on timelines, budgets and mechanical feasibility.
  • Performed Pre-construction quality and safety management as well as review, start up and commissioning.
  • Assessing project requirements.
  • Prepare estimating and costing for mechanical work & coordinating with project team for timely completion of project.

Languages

English
Beginner
A1
Hindi
Beginner
A1
Marathi
Beginner
A1
Bhojpuri
Beginner
A1

Timeline

Site Engineer

Uttam energy Pvt Ltd pune
12.2024 - 01.2026

FACILITY MANAGER

THE EXCELLENT CONSULTANY OF HEAT DIVISION
12.2022 - 10.2024

SITE ENGINEER

HITECHNO CONTROL SYSTEM PVT. LTD
09.2021 - 10.2022

SITE ENGINEER

ALFA BOILER PVT.LTD
01.2019 - 08.2021

B.TECH - MECHANICAL ENGINEERING

ARAVALI INSTITUTE OFTECHNICALSTUDIES OFUDAYPUR

12th -

S.B.S.I.C RATASIYA KOTHICOLLEGE

10th -

M.S.V.DHOLGARWADI CHANGAD
ARVIND RAJENDRA YADAV