Procurement Professional with 13 years of work experience across EPC, Infrastructure, Renewable, Automotive and Manufacturing Industries. I have led category spend in CAPEX, Indirect Material and Services to the tune of annual purchase value of INR 180 Cr. with substantial cost avoidance of 18% and saving of 3.5%. My experience spans strategic sourcing, supplier development, commercial negotiations, process improvement, and supply risk management
• Eliminated single-source dependency for an electric manipulator upgrade by challenging a high-cost proposal, conducting a site study, and onboarding OEM Indeva (Italy). Led negotiations to secure new manipulators at a premium of only 15% over refurbishment cost while retaining existing assets for future deployments.
• Delivered INR 17.61 lakhs in savings on the purchase of a new acoustic enclosure by swiftly identifying and validating a new supplier (PSA Services), conducting a site assessment, and leading value-driven negotiations. Secured the supply, installation, and commissioning of the acoustic enclosure. (Received the CPO Award 2025 – Agility category for this initiative.)
• Delivered INR 793 lakhs of value in a single-source moulding machine project with Kuenkel Wagner through localization savings of INR 300 lakhs and strategic negotiations yielding INR 493 lakhs, thereby reducing the budget gap while ensuring technical acceptance and project continuity through an ownership-driven approach.
• Resolved a stalled platform upgrade by challenging an inflated vendor claim and validating that only approximately 10% of the work had been completed. Through tough negotiations, secured a 14% cost reduction (INR 5.46 lakhs) and aligned a scope amendment, ensuring commercial control and project continuity.
• Standardized the CAPEX Manual to strengthen governance, improve compliance, accelerate execution efficiency, and support the training needs of new recruits on procurement processes. (Planned launch in Q2 FY2027.)
• Enabled two new temporary hires to become job-ready within three weeks through structured training, hands-on guidance, and mentoring.
Key Achievements:
• Spearheaded the greenfield establishment of an Octagonal Pole and Highmast manufacturing facility at GR Infraprojects Ltd., Ahmedabad, leading consultant selection, technology evaluation, vendor development, commercial negotiations, and machinery procurement for a CAPEX investment of INR 2300 Lakhs.
• Led the end-to-end setup of an L-Ring Drum manufacturing facility at GR Infraprojects Ltd., Guwahati, by sourcing blow moulding technology, identifying raw material suppliers, finalizing technical specifications, and executing procurement activities for a INR 1300 Lakhs CAPEX project, enabling in-house production and reducing dependency on external suppliers.
• Introduced advanced Pile Driver technology from Orteco S.R.L., Italy, for highway crash barrier installation, significantly improving execution speed, productivity, and project delivery efficiency.
• Pioneered the introduction of India's first Thermoplastic Road Line Marking Machine from Borum, Denmark, driving innovation in highway infrastructure projects through enhanced marking quality, productivity, and operational efficiency.
• Products Purchased Backhoe Loader, Excavator, Soil Compactor, Piling Rig, Pick & Carry Crane, Concrete & Asphalt Pavers, Concrete Batching plant, Hot Mix Plant, Industrial Water Chillers, Girder Launchers, Single & Double Girder Gantry/ Portal Cranes, Single Girder/ Double Girder EOT Cranes Light Tower, Solar Light Tower, D.G Sets, Air Compressor, Distribution Transformer, Welding machines, Mechanical hydraulic Power Presses, Iron Worker, Section Bending Machine, Shearing machines, Formworks, MEP items, Fire Fighting systems, Package Sewage Treatment Plants & Workshop Machines.
Managed procurement for capital goods, Spares, consumables and services, ensuring cost-effective and quality-driven purchases.
Vendor & Supplier Management (Contract Negotiation, Performance Evaluation)
Budgeting & Financial Acumen (Cost Optimization, CAPEX Management)
Risk Management & Mitigation
Project & Program Management (End-to-End Execution, Stakeholder Collaboration)