To leverage extensive expertise in power transmission project execution, management, and technical oversight to deliver complex EPC projects with excellence. Seeking a challenging position where proven capabilities in infrastructure development, team leadership, and stakeholder management can contribute to organizational growth and project success.
Project Execution and Management in all aspects including:
Fiber Optic Installation: End-to-end deployment and management of 48 Fiber OPGW (Optical Ground Wire) including design verification, material procurement, site preparation, and installation across 220 kV transmission corridor.
OTDR Testing: Optical Time-Domain Reflectometer (OTDR) testing and validation of fiber optic cables to ensure quality and performance specifications
FODP (Fiber Optic Distribution Panel): Installation, configuration, and commissioning of fiber optic distribution panels for network connectivity and monitoring
Transmission Line Execution: Management of complete 220 kV EPC transmission line project including tower design verification, foundation planning, tower erection, conductor stringing, laying of OPGW and testing.
Quality Assurance & Compliance: Rigorous inspection protocols, type testing of materials, vendor coordination, and adherence to technical specifications and safety standards.
Stakeholder Coordination: Liaison with client (HZL), regulatory authorities, contractors, and suppliers for seamless project execution.
Progress Monitoring: Regular site inspections, status updates, schedule optimization, and issue resolution.
Team Leadership: Supervision and coordination of field teams, contractors, and technical personnel.
PMT & GETCO D/C 220 kV CSTL Project
Sterlite Power Transmission Ltd.
01.2023 - 08.2025
Project Execution and Management in all aspects including:
Project Coordination: Vendor Management, SCM, Compliance monitoring, Planning of site execution.
Transmission Line Execution: Management of complete 220 kV EPC transmission line project including tower design verification, foundation planning, tower erection, conductor stringing, laying of OPGW and testing.
Quality Assurance & Compliance: Rigorous inspection protocols, testing of materials, vendor coordination, and adherence to technical specifications and safety standards.
Stakeholder Coordination: Liaison with client (GETCO), regulatory authorities, contractors, and suppliers for seamless project execution.
Progress Monitoring: Regular site inspections, status updates, schedule optimization, and issue resolution.
Team Leadership: Supervision and coordination of field teams, contractors, and technical personnel.
Project Manager – JKPTCL Project
Sterlite Power Transmission Ltd.
08.2021 - 01.2023
132 kV D/C Reconductoring: Re-conductoring of 132 kV double-circuit Hiranagar to Kathua transmission line with conductor upgrade from ACSR Zebra to ACCC Casablanca conductor.
Hiranagar Substation Upgradation: Complete substation up-gradation including conductor replacement and associated infrastructure upgrades
Project Manager – DTL Project
Sterlite Power Transmission Ltd.
01.2021 - 08.2021
220 kV Bus-bar Strengthening & Upgradation: Comprehensive bus-bar strengthening and 220 kV upgradation at Wazirabad Substation and Shalimar Bagh Substation
Conductor Replacement: Replacement of ACSR Zebra conductor with high-performance ACCC Drake conductor
Equipment Installation: Installation and commissioning of modern equipment including Current Transformers (CT), Circuit Breakers (CB), Isolators, and associated protection systems
Project Manager (Project) – HPSEBL Project
Sterlite Power Transmission Ltd.
04.2019 - 12.2020
Conductor restringing of 66 kV transmission lines with ACSS Conductor
Construction and commissioning of new 22 kV distribution lines
Site supervision, quality control, and coordination with regulatory authorities
Project Manager (Site/Planning)
Apar Industries Limited
08.2018 - 04.2019
Upgradation Projects for MSETCL – Apar Industries Limited, Mumbai, Maharashtra.
Sonkhar – Trombay 220 kV Transmission Line – 16 km (ACSR Zebra to ACCC Drake reconductoring)
Nerul – Trombay 220 kV Transmission Line – 20 km (ACSR Zebra to ACCC Drake reconductoring)
Upgradation Projects for TS TRANSCO – Apar Industries Limited, Telangana, Hyderabad.
400 kV Quad Moose D/C Transmission Line: Construction and execution of 400 kV double-circuit transmission line spanning 200 km from Sikkim to Bihar with Quad Moose conductor configuration
Site Management: In-charge of 97 sites across Darjeeling region
Quality Oversight: Inspected live sites for supply, planning, and execution across Bihar, Kolkata, Sikkim, and Odisha
Technical Excellence: Successfully managed mega transmission line project throughout Sikkim and Bihar with advanced conductor systems
Area Coordination: Full responsibility for supply and planning across entire hill section (P1 & P2 Darjeeling)
Tower Package Responsibilities:
Technical Activities:
Conducted walk-over survey, detailed survey, and check survey
Verified leg-chimney combinations and benching proposals using terrain contour analysis
Supervised foundation and tower erection per approved drawings and FQP specifications
Managed stringing operations in both hilly and plain terrain using manual and tensioner-pulley methods
Reviewed and approved structural drawings, BOMs, and tower sketches
Evaluated technical proposals and approved service bills
Quality Assurance & Supply Monitoring:
Inspection of tower materials and type testing protocols
Issued MICC (Material Inspection Certificate) and dispatch instructions
Pit-mark checking for foundation preparation
Conducted periodic site visits and quality audits
Non-Commercial Activities:
Site coordination and monitoring
Managed supply scheduling and delivery coordination
Generated monthly status updates and progress reports
Liaison for Right-of-Way (ROW) clearance and NOC procurement from government departments
Site Engineer
TATA PROJECTS Ltd.
01.2011 - 10.2012
400 kV D/C Kishenpur – New Wanpoh Transmission Line
Resolved critical tower erection issues and implementation challenges
Managed comprehensive tower execution from excavation through stringing
Supervised foundation design, erection, and line commissioning
Coordinated LAN networking and IT infrastructure on site
Education
Bachelor of Engineering - Information Technology
Amravati University
Maharashtra
05.2009
Skills
Project Management: Planning, execution, monitoring, and completion of EPC projects
Certification
CTC Global ACCC Master Installer Training – Vadodara (2018) – Ranked among top performers
Interests
Photography, Social Media Content Creation, Sports, Traveling, Music, Reading, Cooking
Accomplishments
Darjeeling Operations: Site in-charge for 97 sites across the Darjeeling region with multi-dimensional responsibility
Pan-India Execution: Inspected and coordinated live sites for supply, planning, and execution across Bihar, Kolkata, Sikkim, Maharashtra, Rajasthan & Odisha.
Mega Project Delivery: Successfully executed 400 kV transmission line projects throughout Sikkim and Bihar using advanced Quad Moose conductor systems.
Quality Excellence: Among top performers in CTC Global ACCC Master Installer Training (Vadodara, 2018).
Complex Terrain Management: Managed stringing and erection operations across challenging hilly terrain and plain areas.
Supply Chain Leadership: Coordinated material inspection, quality assurance, and dispatch across multiple project sites.
HONORS & AWARDS
Among the Top Performers in CTC Global – ACCC Master Installer Training (Vadodara, 2018), Volunteer with NGO – Door Step School under "Teach India Program" of The Times of India (2008), Literary Secretary, College (2006-2007), Second Prize Winner – Amravati University Youth Festival in Quiz Event (2005-2006), Representative for Debate Competitions at Zonal and National Levels (three consecutive years), Organized Quiz Competitions, Science Exhibitions during College Festivals