To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Experienced Piping Engineer with over 24 years of experience in Chemical, Petrochemical, Refinery, Polyster, Carbon Black, metals and Minning. Excellent reputation for resolving problems and improving customer satisfaction.
Projects handled in Petrofac Engineering Services:
I was worked as Lead Engineer Piping Stress on Vedanta Limited (CAIRN OIL & GAS) – (Development of Integrated Gas Surface Facilities for Raageshwari Deep Gas Field), Barmer, Rajasthan, India. (Green Field & Brownfield)
Project : Thai Oil Refinery: CFP (Clean Fuel Project)
Client : THAI OIL Private Company (Thailand).
Units: SWS, SRU, HCR & Interconnecting Pipe Rack.
I was worked as a Lead Engineer Piping Stress for Al Taweelah Alilumina Refinery (Abu-Dhabi) with Bechtel Petrofac Joint Venture (BPJV).
I have handled 25 members stress team.
Project Name: Al Taweelah Alumina
Capacity : 2 MTPA – Smelter grade Alumina
(Refinery Construction in 3 phases-Each 2 MTPA; total of 6 MTPA)
Project Scope: Refinery Phase-1: 2 MTPA Greenfield Alumina Refinery
BPJV- Bechtel /Petrofac Emirates LLC Joint Venture
Feasibility Study, Execution Design, Procurement & Construction
(EPCM services reimbursable)
Adaptation of Yarwun2 Alumina Refinery, Gladstone, Queensland
Client /Owner: Emirates Global Aluminium (EGA) (First Venture into Alumina Refinery)
Locations : Jobsite: Al Taweelah, Khalifa Industrial Zone, Abu Dhabi, UAE (KIZAD)
(Adjacent to EMAL Aluminium Smelter)
Feasibility Study locations: Brisbane and Al Taweelah
Pre-Feasibility Study: Pre-Feasibility Study: SNC Lavalin & Hatch JV
Raw Material Source: Bauxite: Compagnie des Bauxites de Guinea (CBG), Africa
Technology Partners:
HOT (Hatch Outotec JV) Technology License & Engineering for Tube Digestion
(Scope includes Digestion, Condensate Storage and Acid Preparation)
RTA (Rio Tinto Alcan International Ltd.) Technology, Process design & Operations Input
(Validation of Scope, PFDs for process area, Process Guarantees, Operational readiness)
Project : KNPC CFP-2020 MAB1 (Clean Fuel Project)
Client : Kuwait National Petrochemical Company.
Responsibilities:
Project : Jamnagar Gasification Complex
Client : Reliance Industries Limited
Location : Reliance Jamnagar Refinery, Gujarat, India.
Responsibilities:
Project : YANBU EXPORT REFINERY PROJECT
Client : SAUDI ARAMCO
Responsibility :
I have hands-on experience in analyzing critical piping systems of FEED project and detailed Engineering like pumps, turbines, compressor, Air Cooler and other high pressure / temperature piping arrangement including jacketed piping systems.
· Conduct 3D model review with client & process licensor using PDMS design review & PDS Smart Plant Review.
· Checking of stress documentation & pipe supports.
· Prepare, Monitor & Control project schedule for piping discipline.
· Responsible for carrying out all detail engineering activities related to piping engineering in Petrochemical and Refinery projects.
Project Description : Guangdong 20 MMTPA Heavy Crude Oil Refinery Project
Front End Engineering Design (FEED) 3.7 MMTPA Hydrocracking units.
Client : Petro China – PDVSA
Project : BEWW Twin Platform Topsides Modification Project. (Offshore)
Client : Chevron Offshore Thailand Ltd. (COTL)
Responsibility :
Project : Gorgon LNG Plant, Barrow Island, Australia
SALIENT FEATURES OF THE PLANT
- This is a turnkey project involving detailed engineering, procurement. & Construction of a
- Plant done on 3-D PDMS system and stress analysis done on Caesar-II ,Ver. 5.1
Responsibility:
Responsibility : Lead Engineer Piping Stress
Project : Mumbai High North (MHN) Project (Offshore)
Client : Oil and Natural Gas Corporation Limited, Mumbai
SALIENT FEATURES OF THE PLANT
Project : Platong Gas II Development Project (Offshore) Central Processing Platform.
Client : Chevron Thailand Exploration and Production
SALIENT FEATURES OF THE PLANT
Project : Saudi Kayan Petrochemical Complex – SK Olefins Plant
Description : Ethylene, Propylene and Benzene unit.
Client : Saudi Kayan, Al-Jubail Saudi Arabia
SALIENT FEATURES OF THE PLANT
Project: Qatar Gas LNG Projects.
Job Description and Responsibilities:
Organization Profile : Chemtex is an independently managed subsidiary of Gruppo M&G, Italy. A full service-engineering partner, Chemtex has engineering procurement & construction management expertise in manmade fibers, Polymer, Carbon black, Refining operations & Petrochemicals. The company engages in designing of polyester Plants with Dupont Technologies.
Job Description and Responsibilities:
Description: Working as Lead Engineer Piping Stress for the Detail Engineering of the project.
Job Responsibilities:
Projects Details:
1. Client: M&G POLYMEROS BRASIL S.A., (BRASIL)
Project Brief: 1500 TPD PET PLANT ESTRILA (Largest pet plant in the world)
Technology: Dupont
2. Client: GARDEN SILK MILLS LIMITED, SURAT
Project Brief: 480 TPD POLYESTER MELT/CHIP PRODUCTION PLANT Technology: BARMAG (Germany)
3. Client: HANGZHOU BAY ACRYLIC FIBER CO., LTD
Project Brief: 60,000 TPA Acrylic Fiber plant
Technology: Faserwerke Lingen (Germany)
4 Client: Chengold NG-3. CHINA
Project Brief: EPC (750 TPD Bottle Grade Polyester Plant)
Technology: Dupont (NG)
5. Client: Hangzhou Xiangsheng Textile Co. Ltd., CHINA
Project Brief: 900 TPD Textile Grade Polyester Plant
Technology: Dupont
Project: Amir Kabir LLDPE olefin project.
Responsible for all Stress and Support related activities.
Job Responsibilities :
Project Details:
1) Client: Lyondell Chemicals Netherlands, Rotterdam
Project Brief: 118000 TPA (Butanediol Plant)
Technology: Lyondell Chemicals
2) Client: ATOFINA, Antwerp
Project Brief: 200,000 TPA (Polyethylene Plant)
Technology: ATOFINA
Project : M/s. Indian Oil Corporation Ltd. (DHDS Plant - Mathura Refinery)
Checking of Piping Layout drawings and AFC Isometric drawings, Civil & mechanical information drawings, Preparation of Piping Specifications, Generation of MTO reports and lists for pipes, fittings, valves and other on-line items, Review of Vendor Drawings & Documents and Vendor Co-ordination, Pipe Stress Analysis using Caesar-II version 4.1, Caepipe 3.72.
Project - M/s. Hindustan Petroleum Corporation limited.
Preparation & finalization of routing of pipelines through existing unit by taking actual measurements & design pipe supports. Preparation of MTO and checking of Piping Isometric drawings.
Stress Analysis
Worked on CAEPIPE Version 3.72/3.74 to carry out stress analysis of critical lines.
Engineering plans