ASHOK KUMAR

Faridabad

Summary

A Mechanical Engineer with 8.5 years of experience in project management, expediting, project coordination, monitoring, production planning, PPC, fabrication, and erection of piping, as well as structures in oil and gas onshore and offshore construction projects.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Asst. Manager - Production

DEE Piping Systems
Assam
01.2025 - Current
  • Knowledge about the process of Fabrication as per drawing
  • Follow up with Projects and Design & Engineering for any Queries or Bottlenecks related to Drawing and Material
  • Experience in Fabrication of Steel Materials like Carbon Steel (Grade B and C), Alloy Steel (Grade P11, P22) and Stainless Steel (Grade 304,316)
  • Study of Inspection Test Plan & Quality Assurance Plan and then plan for Production
  • Maintain overall record of all Fabrication activities like Production Planning, Drawing Register and Material Updating etc
  • Responsible for daily planning activities like Cutting plan of pipes, Weld Fit-up Plan, Welding Plan, Internal Inspection Plan, Shifting to Blasting Plan etc
  • Study of Isometric drawings as well as Detail drawings of Supports and Couplings
  • Before Welding, Inspection of Weld Fit-up Joints as per Drawing
  • Preparation of Weld Planning as per availability of Resources like Machine Joint or Manual Joint to save Extra Time & Extra Cost of the Company
  • Basic Knowledge of Welding Process like GTAW, FCAW, GMAW, SAW & SMAW
  • Prepare NDE and PWHT plan as per ASME Codes (B31.1 & B31.3) & Standards, QAP/ITP or Customer Spec
  • & NDE Matrix
  • Offered Pipe Spools for Final Dimension after completing all NDE activities
  • Responsible for Shifting all Cleared Spools up to Packing with all Respects Okay
  • Control more than 100 Skilled & Semi-Skilled Manpower including Contractor, Supervisor, Fitter, Tack-Welder, Grinder Men, Punch Men, Welder and Helpers
  • In Daily Morning, Attend Tool Box Meeting at Shop Floor with all Manpower and aware them about importance of Safety and special Requirements related to any Project
  • Implementation of 6S at shop Floor and Ensuring all manpower having required PPE's
  • Responsible for Prepare Well Cleaned Shop Floor for Audits and Visits
  • Controlling Rework and Wastage of Material
  • Provide DPR, MIS and Status to top management on Daily Basis
  • Attend TRM or Weekly Meetings to discuss Production Targets
  • Make every single effort to achieve Month's Billing

Production Supervisor

L&T Modular Fabrication Yard LLC
Sohar
03.2024 - 12.2024
  • Leading projects of Prefabricated Piping spools, for timely execution & within the approved budget, through coordinating activities between Design, Procurement, Production, Quality, Painting and Dispatch & Logistics Team
  • Collaborating with key persons to ensure clarity of the specifications and expectations of the company
  • Technical documents review of the concerned projects and communicate the important points with all concerned
  • Raising the bill to client for any additional work/ scope added in the project
  • Organise or attend Meetings with client for expediting of engineering related issues, to brief the project status, Following up with client to ensure timely release of payments etc
  • Prepared & monitored monthly Production Plan for the project on the basis of RM availability, drawing availability, client priority & shop capacity by discussing with respective shop heads
  • Preparation Project status to Management as and when required, and Monthly Progress Report in the Customer's format
  • Co-ordination with the site for materials management at site and resolving the issues raised by site in a limited time
  • Carryout Shop Expediting activities and follow- up action as per requirement
  • Dealing with customers on all quality related issue
  • Analysis, review and approval of detailed erection drawings
  • Identifying scope of work
  • Material coordination with Client and sub vendors works
  • Verifying the availability of the material and drawing
  • Coordinating site mobilization activities
  • Ensure to provide complete material as per Plan and Drawings
  • Responsible for Planning of Fabrication & Erection of Piping and Structure
  • Aware of piping Codes and Standards
  • Project - ZULUF AH SOUTH & NORTH WATER INJECTION FACILITIES, Client - Saudi Aramco, Module - TPW-1 Jacket (6 Legs)

Senior Engineer - Production

DEE Piping Systems
Palwal
08.2016 - 01.2024
  • Project - ENCANA Cutbank Ridge (Client - FLUOR CANADA LTD.)
  • Project - TPA polypropylene plant, Lekki Free trade zone, Nigeria (Client - Dangote Refinery)
  • Project - KURE JAWA 2 PROJECT & CENTRAL JAVA PROJECT INDONESIA (Client - MHPS)
  • Project - TAKETOYO POWER STATION (Client - MHPS)
  • Project - LNG Canada (Client - JGC FLUOR Joint Venture)
  • Project - BPCL LOBS REVAMP (Client - Bharat Petroleum Corporation Limited)
  • Project - OBRA & JAWAHARPUR SUPER THERMAL POWER STATION (2x660 MW) (Client - DOOSAN POWER SYSTEMS INDIA PVT
  • LTD.)
  • Project - IOCL, BARAUNI, DHDT (Client - McDermott)

Education

B.Tech - Mechanical Engineering

Satya College of Engg. & Tech.
Palwal, Haryana
05-2019

Diploma - Mechanical Engineering

B.K.N Govt. Polytechnic
Narnaul, Haryana
05-2015

High School -

B.V.N Sr. Sec. School
Khambi, Palwal, Haryana
03-2012

Skills

  • Project Management
  • Project Execution
  • Production Planning
  • Expediting
  • Team Leadership
  • Manpower Management
  • Microsoft Outlook
  • Microsoft Excel
  • Microsoft Word
  • Microsoft Dynamics NAV
  • Dynamics 365 Business Central
  • Ealps

Certification

Project Management Professional (PMP)®

Certification Number: 3910400

Expiration Date: August 23, 2027

Languages

  • Hindi
  • English

Personal Information

  • Passport Number: P7616988
  • Passport Place Of Issue: Delhi, India
  • Father's Name: Mr. Chet Ram
  • Date of Birth: 12/11/96
  • Nationality: Indian
  • Marital Status: Un-Married

Disclaimer

I hereby declare that provided information are correct up to my expectation and, if any thing found wrong my candidature should be cancelled.

                                                                                                                         (ASHOK KUMAR)

Timeline

Asst. Manager - Production

DEE Piping Systems
01.2025 - Current

Production Supervisor

L&T Modular Fabrication Yard LLC
03.2024 - 12.2024

Senior Engineer - Production

DEE Piping Systems
08.2016 - 01.2024

B.Tech - Mechanical Engineering

Satya College of Engg. & Tech.

Diploma - Mechanical Engineering

B.K.N Govt. Polytechnic

High School -

B.V.N Sr. Sec. School
ASHOK KUMAR