Quality analysis and control specialist in construction services, including building, metro, bridge, and tunnel projects. Expertise in problem-solving and implementing comprehensive solutions, with strong communication and coordination skills. Experienced in conducting inspections, enforcing preventive measures, and enhancing overall quality compliance. Proven track record in leading teams, training on best practices, and driving process improvements for increased product reliability.
Overview
11
11
years of professional experience
Work History
QA/QC Engineer
VEN INDIA CONSULTING
MUKTSAR
10.2024 - Current
An FCI (Food Corporation of India) project under Adani Agri Logistics in Punjab.
A food grain silo of different sizes as per the mandi requirements at different locations.
The project involves ground improvement techniques, earthwork as per MORTH, pre-stressed panels and poles for the boundary wall, and different types of civil foundations.
Furthermore, in the end, it involves pre-engineered buildings, prefabricated structures, and material handling systems.
QA/QC Engineer
Dilip Buildcon Pvt Ltd
Bilaspur
12.2022 - 10.2024
Bhanupali Bislapur Beri Package 5 under RVNL, Tunnel & bridge Project in HImachal Pradesh
Pull-Out Test of Rock Bolt SDA and SN Type.
Operation and Calibration of a fully computerized batching plant (Swing Stetter).
Forepoling, pipe proofing installation, testing, and grouting.
Needle penetrometer test for shotcrete thickness testing inside the tunnel.
In-situ cylindrical core cutting and testing.
Shotcrete Rebound Test.
Piling for bridges.
Energy absorption test to ascertain the quality of fiber-reinforced concrete.
Worked with both steel fiber and poly fiber concrete, and its mix design.
All types of testing of aggregate, cement, shotcrete, and concrete in the quality lab.
QC Engineer
Apco Infratec Pvt Ltd.
Ghaziabad
04.2021 - 11.2022
Oversaw semi-high-speed rapidmetro project from Delhi to Meerut under NCRTC contract.
Managed casting yard operations for segment, T-girder, and parapet production.
Executed prestressing of girders utilizing high-tensile strands for enhanced durability.
Conducted UPV and Rebound Hammer tests to ensure structural quality standards.
Performed chemical nipple grouting under pressure at segment and girder edges.
Implemented varied repair strategies based on root causes and types of structural failures.
QC ENGINEER
YFC-JMV JV Projects Pvt
Dwarka
05.2019 - 03.2021
Project: Construction of Twin Box Tunnel by Cut & Cover method and one underground station Dwarka
Dwarka Sector 21 to ECC in Dwarka Sector 25 under Delhi MRTS Project
QA/QC and Site Coordination, Conducted the checking of all quality of concrete and bulk materials
Conducted all lab testing work along with Mix Design and site work (aggregate, cement, concrete, soil, steel, water, and admixture) as per IS standards.
Handled all production work at the batching plant, along with all the documentation work.
Repairing all types of concrete after setting in case of defects.
Calibration of all types of equipment as per the requirements.
MQR report, month-wise submission with all testing reports, with their certificates.
Identified test failure issues, deploying efficient corrective action for swift resolution.
Graduate Engineering Trainee
YFC-CICO JV
Noida Sector 62
04.2017 - 03.2019
Contract No.CC-94 CICO-YFC JV Blue Line's 6.82 km between the Wave Noida City Centre and Noida Electronics City stations.
Client Delhi Metro Rail Corporation (DMRC)
Post Graduate Engineer Trainee (GET)
Testing of Aggregate, Sand, Cement, Concrete & Steel etc.
Records for incoming Materia Inspection
Maintaining records for testing all the construction materials
Monitoring and maintaining of all testing equipment's
Checking Pre Pour and Post Pour of all construction activity on Site
Production of Concrete from Batching Plants by maintaining best Quality of Materials.
Site Engineer
Vrindavan Constructions
Kishangarh, Alwar
10.2016 - 03.2017
Vila Construction
Procuring materials, ensuring quality, and managing inventory to maintain a steady supply throughout the project.
Conducting regular inspections, testing materials for quality assurance, and addressing any defects or issues that arise during construction.
Keeping detailed records of project progress, daily activities, and any deviations from plans. Generating reports for stakeholders as needed.
Study the structural drawings to understand the placement, size, and specifications of the steel reinforcement.
Check that the formwork dimensions match those specified in the drawings. This includes width, height, and depth.
Verify that the formwork is constructed to the correct shape and profile as per the drawings. Ensure that any curves, chamfers, or special features are correctly formed.
Confirm the type and grade of concrete as specified in the structural and architectural drawings
Ensure that the surface finish meets the specified requirements and correct any issues (e.g., trowel marks, irregularities).
Site Engineer
Indsao Infratech Pvt. Ltd.
Noida Extension Sector-1
09.2015 - 08.2016
Residential Building
Directly managing and supervising all construction activities on site. This includes coordinating with subcontractors, workers, and suppliers to ensure that work progresses according to schedule and meets quality standards.
Coordinating the delivery, storage, and usage of construction materials on site. This includes ensuring that materials are of the required quality and quantity, and that wastage is minimized.
Creating and maintaining construction schedules in coordination with the project timeline. This involves planning tasks, setting milestones, and monitoring progress to ensure that deadlines are met.
Check that the steel reinforcement is placed in the correct positions as per the drawings.
Ensure that the formwork is properly aligned. Use levels to check for vertical alignment and a straight edge to confirm horizontal alignment.
Check that the formwork is adequately supported and braced to prevent deformation or collapse during the concrete pouring process. Look for any sagging or misalignment.
Ensure that the formwork is clean and free of debris, oil, or other substances that could affect the finish of the concrete.
Check that concrete is properly compacted using appropriate vibration techniques to eliminate air pockets and ensure proper bonding.
Confirm that the finished surface is level and aligned according to the design.
Verify that curing is maintained for the required period to prevent drying too quickly.
Take samples for laboratory testing, including slump tests, compressive strength tests, and other relevant tests.
Site Engineer
S. R. Ashok & Associates
Greater Noida
08.2014 - 08.2015
Residential Building
Keeping detailed records of construction activities, daily progress reports, and any changes or modifications made during the execution phase. This information is crucial for tracking project milestones and providing documentation for audits or client review.
Ensuring a smooth transition from construction to occupancy by completing necessary inspections, obtaining certifications, and addressing any outstanding issues or deficiencies before final handover to the client.
Implementing quality control measures to ensure that construction work meets specified standards and requirements. This involves conducting regular inspections, testing materials, and addressing any deviations or issues promptly.
Directly managing and supervising all construction activities on site. This includes coordinating with subcontractors, workers, and suppliers to ensure that work progresses according to schedule and meets quality standards.
Confirm that the diameter of the reinforcement bars matches the specified sizes in the drawings.
Study the architectural and structural drawings to understand the dimensions, shapes, and specifications of the formwork.
Monitor the consistency of the concrete to ensure it matches the slump test requirements.
Ensure that curing methods (e.g., water curing, curing compounds) are applied immediately after finishing the surface.
Document the pour details, including mix design, delivery times, crew details, and any issues encountered.