Summary
Overview
Work History
Education
Skills
DECLARATION
PERSONAL PROFILE
Timeline
ProjectManager

Ashwini Kumar Singh

Dombivali East

Summary

Dynamic and results-driven professional with a strong commitment to advancing a career in the civil industry while embracing new challenges and trends. Dedicated to leveraging innovative solutions and best practices to contribute effectively to projects. Passionate about continuous learning and adapting to evolving industry standards, ensuring a proactive approach to problem-solving and project execution. Prepared to make a significant impact through collaboration and strategic thinking in diverse civil engineering environments.

Overview

31
31
years of professional experience
1
1
Language

Work History

Project Manager

Nilam Enterprises.( Client BELCHEM INDUSTRIES)
07.2025 - Current
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Communicated daily with vendors to keep project fully operational.

SR. SITE ENGINEER

GOSHAR ALLIANCE LLP.
01.2023 - 07.2025
  • Optimized site operations by implementing effective scheduling and resource allocation strategies.
  • Reduced construction costs through diligent evaluation of materials and suppliers, ensuring best value without compromising quality.
  • Mentored junior engineers to help them grow professionally while enhancing their skills in site engineering practices.
  • Delivered high-quality results by enforcing strict adherence to design specifications, building codes, and industry standards.There are two tower 55 Storey RCC with Ramp and 2 no.Basement Completed.
  • Established strong working relationships with clients, suppliers, and subcontractors to create a reliable network of resources for future projects.
  • Monitored project progress closely, identifying potential issues early on and taking corrective action as needed to keep projects on track.
  • Delivered high-quality results by enforcing strict adherence to design specifications, building codes, and industry standards.
  • Resolved conflicts among team members diplomatically, promoting a harmonious work environment conducive to productivity.
  • it was very challenging team work job.

Site in charge

Shri raj laxmi Buildcon construction(contractor)
01.2021 - 08.2021
  • Runwal Garden Manpada dombivli east. G+32 storey tower, worked from ground layout till 1 st floor. Conventional shuttering G +1 slab completed ,tower 1st floor built up area approximately 16600 sq.ft

Senior engineer

Shamir infra
02.2019 - 12.2019
  • Lodha palava phase 2 sector 10 khoney dombivli east,residential 2 towers G +12th floor started from excavation G +2 floor completed ,Afterwards tower layout design fluctuated lodha hold all activity

Site incharge

Royal construction(contractor)
05.2018 - 12.2018
  • Hiranandani estate TCS Tower no. 2. 18th storey commercial constructed RCC and civil work. Manpada G. B. Road thane west maharashtra

Sr. Site Supervisor

RUNWAL BUILDER & DEVELOPER
03.2013 - 02.2018
  • Runwal Pearl behind R Mall G.B. Road Thane W. Maharashtra. Infra Work external Development S.W.D. Basement Ramp Club house RCC & Finishing work. 3 month billing work on site

Sr. Site Supervisor

L&T ECC Group.
08.2012 - 03.2013
  • Worked in seawood project R. C. C. work I.T. Park and Hotel. Railways station with infra.

Sr. Supervisor

KALPATARU LTD.
01.2011 - 07.2012
  • Large Podium Basement +2 floor Parking Swimming Pool U.G. Tank. S.tp. Flushing Tank In Progress Work From Excavation Layout To Slab R.cc Work like centreline steel as per drawing coordinate to main power and shutter sport level dimension slab thickness concrete grade concrete quality transpiration and method of concrete like cleaning before starting slab. Checking bar and vive rater needle Manpower pour quantity sufficient labour and mason And Brick Work And Plaster and cleaning use partial cement
  • Site: Kalpataru Pinnacle (30thFloor Tower) Malad-West Construction of Residential Building, (127.25 Meter) Basement +Ground + Podium + 30thFloor Terrace LMR Opposite Inorbit Mall, road Malad .(WEST). Mumbai.

Sr. Supervisor

RUNWAL GROUP BUILDER & DEVELOPER
11.2007 - 01.2011
  • RCC. Interior, False Ceiling, Finishing, Finishing, STP, External development & Road garden etc.
  • Site-01: 01. Runwal Mall (R. Mall) Lower + Upper Basement & Ground + 3rd Floor. G, B. Road near Lawkim Company Thane (West) Thane.
  • Site-02: 02. R. CITY MALL (Asia Large Shopping Mall) Basement & Ground + 3rdFloor + 8thFloor parking + 9 No’s of Theatre LBS Marg Ghatkopar (West) Mumbai
  • Site-03: 03. R. Garden City Residential Tower Stilt + 21 Story (8 No’s . of Building) LBS Marg Ghatkopar (West) Mumbai

Sr. Supervisor

MARATHON REALTY LTD.
10.2001 - 06.2007
  • Building completed with swimming pool, club house, U.G.Tank, Septic tank, Garden and road, & finishing activity like Brick/Block work & Plaster. Waterproofing Plumbing Tiling Painting & Hardware Fitting C.P. Fitting Sliding window etc. & handover to Client with Satisfactory Response.
  • Site-01: 01. Marathon Cosmos (Marathon Group) Stilt + 12thStory Building (06 Nos of Building) Lbs. Marg, Nr. Sonapur, Mulund. (West), Mumbai, 400080
  • Site-02: 02. Marathon Maxima Basement + Ground + Podium + 13th Story Building Lbs. Marg, Nr. Sonapur, Mulund. (West), Mumbai, 400080
  • Site-03: 03. Marathon. Nextgen Worli Naka. Stilt +5th Floor Podium Parking + 33 Story Building LowerParel(w) nr. Peninsula, Mumbai, 400080

Senior Foreman

VILLAYATI RAM MITTAL CONSTRUCTION
06.1997 - 04.2001
  • RCC Work and Large Septic -Tank. Retaining Wall R cc. Ucr. +3 No. Balewadi Road Completed Day Night Work with Infra Activity By department Lab our Carpenter Fitter Mason. Internal Finishing Work like Tiling Marble Flooring Painting Carpentry and Plumbing Work Including Cp. Fitting and Handover to Sppl. Etc.
  • Site: SPPL ,G+7 Story Building (39 Nos. of Building ) Santosh Nagar, Film city gate no-01

Junior Supervisor

B.G.SHIRKE CONSTRUCTION & LTD.
06.1995 - 05.1997
  • All Internal Finishing Work.
  • Site: Mhada Project Slum Building G + 7th Story Building (27 Nos of Building)

Junior Supervisor

B.G.SHIRKE CONSTRUCTION & LTD.
11.1994 - 04.1995
  • Responsible for all RCC & Internal Finishing. Completed with road & external development. Garden, STP etc. Material Procurement. Lab our Arrangement (Skilled & unskilled).
  • Site: NRI Housing Project(CIDCO) Stilt + 13 Story Building (11 Nos. of Building)

Education

B. Art. -

Ram Manohar Lohia.K N I
01-1991

I.T.I. Electrical - undefined

Uttar Pradesh Business Certification
01-1994

Diploma in Civil Engineering - undefined

KARNATAKA STATE UNIVERSITY
01-2014

B.TECH IN CIVIL - Civil Engineering

PATEL ENGINEERING.MADHYANCHAL PROFESSIONAL UNIVERCITY
Bhopal, India
04.2001 -

Skills

External Finishing Work like Dry Cladding Granite Fixing Mosaic Tiles Fixing And Texture China Granite AC Ducting At Mall And Chiller-shifted and Installed at Terrace Plumbing Work Toilet Bathroom Kitchen Garden’s For Curing Including C P Fitting

Electrical Fitting in Flat Lobby Garden and Road Substation work H T and LT Cable Lying

Fire Fighting Testing by Fire Officer Stp Septic UG tank Etc

Italian Dholpur Makrana marble & All type Tiles Fixing

External Development Like Road Drain, Paver Block Curb Stone, MSEB Trench& Sub Station Cable trench

Rain Water Harvesting, B M C Water Line Connection

P w d Lift Checking Fire Fighting Area Officer Checking Of Road And Refuse Flat Of Building

Garden Children Park Tennis Court etc

Health Club and Garden Road Pathway in cladding R C C & finishing work

R c c checking Reinforcement shuttering support Damnations level size right angle

Decision-making

Site management

Subcontractor management

Time management

Team collaboration

DECLARATION

I hereby declare that the information furnished above is true to the best of my Knowledge. I am willing to have new challenges in my Career. Assure that given an opportunity I would prove my Credentials & Serve your esteemed organization to the best of my abilities. I would strive to live up to the high expectations & Standards set by the Organization. Always positive attitude and co-operate staff store and follow-up material supplier daily progress review and planning with superior etc. Date: 07th April 2022 Place: Dombivli

PERSONAL PROFILE

  • Name: Mr. Ashwini Kumar Singh.
  • Address: C-109 shakuntala pride bldg lodha heaven dombivali east Thane maharashtra 421204.
  • Date of Birth: February 2nd1968
  • Gender: Male
  • Marital Status: Married
  • Nationality: Indian
  • Religion: Hindu
  • Languages Known: English, Hindi, and Marathi & Bengali.
  • Contact Number: 8097811911/9702963902
  • E-mail Address: singhashwin728@gmail.com

Timeline

Project Manager

Nilam Enterprises.( Client BELCHEM INDUSTRIES)
07.2025 - Current

SR. SITE ENGINEER

GOSHAR ALLIANCE LLP.
01.2023 - 07.2025

Site in charge

Shri raj laxmi Buildcon construction(contractor)
01.2021 - 08.2021

Senior engineer

Shamir infra
02.2019 - 12.2019

Site incharge

Royal construction(contractor)
05.2018 - 12.2018

Sr. Site Supervisor

RUNWAL BUILDER & DEVELOPER
03.2013 - 02.2018

Sr. Site Supervisor

L&T ECC Group.
08.2012 - 03.2013

Sr. Supervisor

KALPATARU LTD.
01.2011 - 07.2012

Sr. Supervisor

RUNWAL GROUP BUILDER & DEVELOPER
11.2007 - 01.2011

Sr. Supervisor

MARATHON REALTY LTD.
10.2001 - 06.2007

B.TECH IN CIVIL - Civil Engineering

PATEL ENGINEERING.MADHYANCHAL PROFESSIONAL UNIVERCITY
04.2001 -

Senior Foreman

VILLAYATI RAM MITTAL CONSTRUCTION
06.1997 - 04.2001

Junior Supervisor

B.G.SHIRKE CONSTRUCTION & LTD.
06.1995 - 05.1997

Junior Supervisor

B.G.SHIRKE CONSTRUCTION & LTD.
11.1994 - 04.1995

I.T.I. Electrical - undefined

Uttar Pradesh Business Certification

Diploma in Civil Engineering - undefined

KARNATAKA STATE UNIVERSITY

B. Art. -

Ram Manohar Lohia.K N I
Ashwini Kumar Singh