Overview
Work History
Education
Skills
Personal Traits
References
Timeline
Generic

Asok Kumar Vasudevan Achary

AKSHARA, AYIROOR PO VARKALA, TRIVANDRUM

Overview

33
33
years of professional experience
1
1
Language

Work History

Project Manager

Ammar Artistic Touch for Contracting WLL
06.2023 - Current
  • Employed by Ammar Artistic Touch for Contracting WLL as Project Manager responsible for the construction of a single storey building located at Hamad Town.
  • Construction of an elevated swimming pool on the roof top of a three storey building located at Saar and interior fit out works of shops at Nakheel centre at Saar. Extension works of a 3 storey building located at Saar.
  • Construction of a Children’s play house for Royal palace. (H.H Sh. Ali Bin Khalifa), at Riffa.
  • Re-painting of 55 Nos decorative garden lamp posts made out of cast aluminium (up to 3000mm high) with single, double and triple lamps. 175 Nos of (up to 2000 mm high) and 95 Nos of garden bollard lights, Royal palace at Riffa.
  • Maintenance works of 3 Nos fountains which includes the repairing of damaged walk way (floor with “RYOWA” tiles around the fountain, epoxy coating to the fountain’s internal & external walls, repairing and replacing the damaged Jordanian stone cladding of fountain walls, Royal palace at Riffa.
  • Re-painting of 143 Nos. decorative ceiling mounted hanging lights and decorative wall bracket lights, Royal palace at Riffa.

Project Manager

Nest Pride Contracting
02.2022 - 06.2023
  • Employed by Nest Pride Contracting as Project Manager responsible for the interior fit out works of St. Christopher School at Isa Town compound, refurbishment works of Reef mall located at Malkiya.

Project Manager

Alwardi Construction & Engineering Co.WLL
09.2015 - 04.2018
  • Employed by Alwardi Construction & Engineering Co.WLL as Project Manager responsible for the extension works of entrance coffee shop and the stone pitching works of retaining wall along the sea shore side at Ritz Carlton Hotel.
  • Removal existing grout of mosaic tiles and regrouting, replacing the existing pool deck flooring including expansion joints.

Contracts Manager

Cinqo Contracting WLL
01.2013 - 08.2015
  • Employed by Cinqo Contracting WLL as Contracts Manager responsible for the construction of a shopping mall at Awali. Chain link fencing of 1000m along the property line.
  • Glass house and aluminium fins around the girls majlis for H.E Shaikh Rashid at west Riffa.
  • Epoxy flooring including screed for BFG factory at Mina Salman.
  • Maintenance / refurbishment works at BFG factory at Hidd.
  • Interior fit out works of Luijj restaurant at Nakheel shopping center.
  • Interior fit out works of cheeky monkey at Nakheel center.
  • Construction of a prayer room at the roof of Nakheel center including necessary crack repairing and repainting works.
  • Micro topping flooring for a indoor music auditorium at Muharraq.
  • Repairing of structural cracks and repainting the external walls of Nakheel center.
  • Electrical and plumbing works for a Three storey villa in Janaibiya including hard landscaping.
  • Interior fit out works for a gymnasium hall in Hamala.
  • Construction of a private villa in Amwaj island.
  • Floor screeding to the car parking of shopping mall at West Riffa (Wadi Al Sail mall).
  • Roof water proofing of Wael pharmacy located at Hidd.
  • Floor screeding works to the Wael pharmacy located at Hiid.
  • Interior fit out works for a mobile shop at Hamala.
  • Structural repairs and repainting works for a residential building at Zinj.
  • Excavation and earth work for the foundation works of Awali Cardiac hospital (BDF)
  • RCC works for the foundation of Awali Cardiac hospital (BDF).
  • Decorative patterned epoxy flooring to the boutique shop located in Juffair

Project Engineer

Jalal GCC Iacovou Construction Bahrain WLL
03.2010 - 05.2011
  • Employed by Jalal GCC Iacovou Construction Bahrain WLL, as Project Engineer responsible for the construction of Polymer factory with a three storey administration building located in Hidd industrial area for Polaris International.

Operations Manager

Alnada Contracting & Maintenance Company WLL (Bahrain)
09.2007 - 11.2009
  • Employed by Alnada Contracting & Maintenance Company WLL (Bahrain), as Operations Manager. Handled subcontract works for various projects like Bahrain Financial Harbour, Reef Island, Riffa Views Etc.

Site Engineer cum materials engineer

G.P. Zachariades (Overseas) Ltd
06.2005 - 08.2007
  • Appointed as Site Engineer cum materials engineer, responsible for the construction of a commercial building. The building is situated in the Diplomatic Area of Manama and when completed will become the Head Quarters of Trust International Insurance Company. With ground, mezzanine and 21 floors above ground, in addition to two basements to accommodate parking for 90 cars.
  • Built with steel structure, fully enclosed with gold and blue glazed curtain wall cladding, the building stands unique with all its architectural features and the most modern, state of the art facilities including a swimming pool, coffee shop, sauna & steam room, gymnasium, auditorium and conference rooms etc, landscaping and gardens on the 1st, 3rd and 18th floor terraces are the added attractions.

Site Engineer

G.P. Zachariades (Overseas) Ltd
02.2005 - 06.2005
  • Appointed as the Site Engineer responsible to carry out the finishing works for a 7 storey Residential Building located at Seef district for H.H. the Prime Minister.

Site Engineer

G.P. Zachariades (Overseas) Ltd
05.2004 - 12.2004
  • Appointed as Site Engineer responsible to carry out the finishing works for the 17 storey hotel building located at Seef District comprises 2 basement floors, ground floor, mezzanine floor and 13 apartment floors with 2 numbers swimming pool at the roof top for Mr. Mohamed Jassim Zayani.( Grand Mercure Hotel)

Site Engineer

G.P. Zachariades (Overseas) Ltd
07.2003 - 05.2004
  • Appointed as site Engineer responsible for the Construction of Beach Houses at Sitra for H.E. Shaikh Ali, comprises 4 numbers Chalets. Club house, swimming pool and soft and hard landscaping.

Site Engineer

G.P. Zachariades (Overseas) Ltd
03.2003 - 06.2003
  • Appointed as site engineer responsible for structural repairs and repainting to the main villa and ancillary building at Zallaq villa for H.H. the Prime Minister.

Site Engineer

G.P. Zachariades (Overseas) Ltd
09.2002 - 12.2002
  • Appointed as site engineer responsible for carrying out the finishing works for the palace of H.E. Shaikha Mariam at Riffa.

Site Engineer

G.P. Zachariades (Overseas) Ltd
03.2002 - 09.2002
  • Appointed as site engineer responsible for the construction of a children’s majlis, construction of tent and refurbishment of existing palace for H.E. Shaikh Rashid at Riffa.

Site Engineer

G.P. Zachariades (Overseas) Ltd
07.2001 - 03.2002
  • Appointed as site Engineer responsible for the construction of a two storey villa at Riffa, opposite to BDF Hospital for H.E. Shaikh Isa.

Site Engineer

G.P. Zachariades (Overseas) Ltd
12.2001 - 07.2001
  • Appointed as site engineer responsible for the construction of Beach Palace for the H.H. the Amir of Bahrain. The Amir of Bahrain. Project located in Wasmya, comprises: Demolition of existing villa (partly), construct a double storey building with swimming pool at the ground level as part of the main building.

Site Engineer

G.P. Zachariades (Overseas) Ltd
07.2000 - 01.2001
  • Appointed as site engineer responsible for the refurbishment works to the existing beach palace for H.H. The prime Minister of Bahrain. The Project located in Zallaq comprises: structural and Plaster repairs to the existing building, construction of fountains, Jacuzzi, Re-tiling to the exterior areas.

Site Engineer

G.P. Zachariades (Overseas) Ltd
12.1998 - 07.2000
  • Appointed as site engineer responsible for the construction of island development for H.E. the Minister of Amiri Court. The project located in Wasmiya, comprises: island in sea (approx: 100mm) gymnasium hall, horse show ring and stables, girls majlis, changing suit and a warehouse.

Site Engineer

G.P. Zachariades (Overseas) Ltd
10.1995 - 12.1998
  • Appointed as site engineer responsible for the construction of a luxury villa for H.E. the Minister for Transportation. The project located at Riffa comprises: a main villa, ancillary buildings and associated landscaping and infrastructure works.
  • Duties and Responsibilities include:-
  • - Contract supervision and administration as site Engineer.
  • - Co-ordination of ID works
  • - Assessing variations and preparing final account.

Assistant Site engineer/Surveyor

G.P. Zachariades (Overseas) Ltd
06.1993 - 10.1995
  • Employed as Assistant Site engineer/Surveyor for the construction of a prestigious palace for H.H. the Prime Minister of Bahrain. The project located at Umm An Naasan Island, comprises: a guest Palace, ancillary buildings and landscaping works.
  • Duties included: -
  • - Contract supervision
  • - Land surveying
  • - Take off materials quantity.

Education

Electrical Engineering Course -

Industrial Training Centre

Secondary School Leaving Certificate - undefined

Kerala Govt. Board of Public Exams

Civil Engineering Course - Engineering

SRV College of Engineering
Quilon

Skills

Project management

Project planning

Project planning and development

Project tracking

Personal Traits

  • Excellent interpersonal skills and right attitude.
  • Strong oral and written communication skills.
  • High level of integrity.
  • Ability to work effectively with individual from diverse backgrounds and at all organizational levels.
  • Exemplary behavior with superiors and subordinates alike, able to deal with difficult characters without loss of temper, with the sole view of fulfilling requested tasks in an honest and faithful manner. Jovial and friendly in most situations but firm and serious when circumstances dictate so.
  • Self-confident, reliable, adaptable and proactive.
  • And of course, loyal with good mental ability and high moral standards.

References

Asok, Kumar V.A, Reference will be furnished upon request.

Timeline

Project Manager

Ammar Artistic Touch for Contracting WLL
06.2023 - Current

Project Manager

Nest Pride Contracting
02.2022 - 06.2023

Project Manager

Alwardi Construction & Engineering Co.WLL
09.2015 - 04.2018

Contracts Manager

Cinqo Contracting WLL
01.2013 - 08.2015

Project Engineer

Jalal GCC Iacovou Construction Bahrain WLL
03.2010 - 05.2011

Operations Manager

Alnada Contracting & Maintenance Company WLL (Bahrain)
09.2007 - 11.2009

Site Engineer cum materials engineer

G.P. Zachariades (Overseas) Ltd
06.2005 - 08.2007

Site Engineer

G.P. Zachariades (Overseas) Ltd
02.2005 - 06.2005

Site Engineer

G.P. Zachariades (Overseas) Ltd
05.2004 - 12.2004

Site Engineer

G.P. Zachariades (Overseas) Ltd
07.2003 - 05.2004

Site Engineer

G.P. Zachariades (Overseas) Ltd
03.2003 - 06.2003

Site Engineer

G.P. Zachariades (Overseas) Ltd
09.2002 - 12.2002

Site Engineer

G.P. Zachariades (Overseas) Ltd
03.2002 - 09.2002

Site Engineer

G.P. Zachariades (Overseas) Ltd
12.2001 - 07.2001

Site Engineer

G.P. Zachariades (Overseas) Ltd
07.2001 - 03.2002

Site Engineer

G.P. Zachariades (Overseas) Ltd
07.2000 - 01.2001

Site Engineer

G.P. Zachariades (Overseas) Ltd
12.1998 - 07.2000

Site Engineer

G.P. Zachariades (Overseas) Ltd
10.1995 - 12.1998

Assistant Site engineer/Surveyor

G.P. Zachariades (Overseas) Ltd
06.1993 - 10.1995

Secondary School Leaving Certificate - undefined

Kerala Govt. Board of Public Exams

Civil Engineering Course - Engineering

SRV College of Engineering

Electrical Engineering Course -

Industrial Training Centre
Asok Kumar Vasudevan Achary