Summary
Overview
Work History
Education
Skills
Technicaltrainings
Projectshandled
Jobresponsibilitiesinprojects
Jobresponsibilitiesinmaintenance
Personal Information
Disclaimer
Accomplishments
Languages
Timeline
Generic

A. Sunil Kumar

Hyderabad

Summary

Seeking a challenging and rewarding opportunity with an organisation of repute which recognizes and utilizes my true potential while nurturing my technical skills.

Overview

15
15
years of professional experience

Work History

Assistant Manager

Dr. Reddy's Laboratories
05.2014 - Current

Jr. Executive

Kemwell Biopharma Pvt. Ltd
08.2012 - 05.2014

Jr. Executive

Gland Pharma Ltd
11.2011 - 08.2012

Engineer

Dr. Reddy's Laboratories
02.2010 - 11.2011

Calibration Engineer

IPA Pvt. Ltd
09.2009 - 02.2010

Education

B.Tech - Electronics and Instrumentation Engineering

JNTU, Hyderabad

Skills

  • Worked with Siemens DCS PCS-7 system in SRS Automation
  • Worked with Delta V DCS
  • Knowledge on Modifying the Existing DCS & PLC Logics
  • Established the communication between controllers to other field devices by using different protocols Profibus, Modbus, Ethernet and serial interfaces
  • Having Knowledge about Pharmaceutical Instruments and Control Automation Products
  • Good knowledge of Pressure, Temperature, Flow, and Level Instruments
  • CSV qualification for manufacturing systems
  • Projects & Maintenance
  • Material Planning
  • Spares Management
  • Site coordinator for CSV
  • Mobilization
  • Installation & Execution
  • Testing & Commissioning
  • Cost Control
  • Quality Control
  • Documentation & Reports

Technicaltrainings

3-Months trained at PROLIFIC Training Institute, Hyderabad.

Projectshandled

  • L2 integration (PI connectivity) was done for Siemens & Emerson systems.
  • Process Automation Integration of Bioprocess equipment.
  • Fermenters & Purification Vessel installation & Commissioning.
  • Modification of existing equipments with compliance to 21 CFR Part 11.
  • Coordinated Baush+Strobel Filling Line, Tofflon Lyophilizers system erection.
  • Centralized SCADA systems for Cold rooms, Incubators and Stability Chambers.
  • Centralized SCADA system for Water system.
  • Solvent Recovery System.
  • Solvent Dispensing System.
  • Reactor Utility Automations.
  • UMS & BMS.
  • Data Acquisition system.
  • Synchronous Digital Clock System (Wired) (Master/Slave).
  • TOC installation for Water systems.

Jobresponsibilitiesinprojects

  • URS Preparation.
  • FDS Verification and Approvals to vendors.
  • FAT & SAT Verification.
  • Accomplished qualification documents (IQ, OQ & PQ) along with cross functional departments.
  • CSV Documentation preparation & Execution.
  • Hardware Estimation.
  • As Built P & ID Verification and Submission.
  • Planning on site works (Master Project Plan: Man Power, Materials, Time, and Quality & Safety).
  • Site Supervision and Inspection of cable tray laying, conduit pipe laying, cable laying, JB fixing, pneumatic tubing, etcetera
  • Site Supervision and Inspection of all Instruments & Control equipment's installation Works.
  • Conducting Tool Box Talk and explaining TRA & Safety precautions.
  • Process Automation Integration of Bioprocess equipment project executed.
  • Reactor Utility Automation Executed.
  • Knowledge on digital temperature scanners, and different types of temperature controllers, RTDs and Thermocouples.
  • Temperature mappings done for Warehouse areas & Driers.
  • Preparation of monthly Calibration schedule through SAP.
  • Conducting instruments calibration as per schedule and update the calibration details in raw data sheet.

Jobresponsibilitiesinmaintenance

  • Preventive maintenance and breakdowns attended on Ampoule lines, Vial lines and PFS lines (Washing, Tunnel, Filling and Sealing machines).
  • Preventive maintenance and breakdowns attended on FBD, Blender.
  • Preventive maintenance and breakdowns attended on Autoclaves, Water plant.
  • Exposure on CGMP works.
  • Communicating with vendors for various Spare Parts and delivery.
  • Calibration of Gauges, Transmitter, Sensors, & Switches of all variables (Pressure, Temperature, Flow, Level).
  • Budget planning for Spares and Consumables, Repairs and Maintenance, Hire and Service pertaining to Instrument Dept.
  • Planning and organizing the daily work schedule for Instrumentation team of technicians.
  • Arrangement of Testing & Calibrating Instruments and Other all Materials necessary for daily Instrumentation activities.
  • Man Power Management.
  • Work Distribution.
  • Materials Planning & Indenting.
  • History Records.

Personal Information

  • Father's Name: A. Prathap Reddy
  • Date of Birth: 08/04/1986
  • Marital Status: Married

Disclaimer

I hereby declare that the information furnished here is true and accurate.

Accomplishments

  • Part of team achieving approvals from regulatory auditors like WHO, FDA & EDQM during my work experience.
  • Managed Instrumentation team of technicians in maintaining Calibration, Control systems and maintenance of instruments in Plant.

Languages

English, Telugu and Hindi.

Timeline

Assistant Manager

Dr. Reddy's Laboratories
05.2014 - Current

Jr. Executive

Kemwell Biopharma Pvt. Ltd
08.2012 - 05.2014

Jr. Executive

Gland Pharma Ltd
11.2011 - 08.2012

Engineer

Dr. Reddy's Laboratories
02.2010 - 11.2011

Calibration Engineer

IPA Pvt. Ltd
09.2009 - 02.2010

B.Tech - Electronics and Instrumentation Engineering

JNTU, Hyderabad
A. Sunil Kumar