Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Intern

Aurangzeb Mallick

Bokaro

Summary

Accomplished Piping Supervisor with extensive experience at TECHIMONT ICB LTD., excelling in project management and welding inspection. Proven track record in delivering projects on time and within budget while ensuring safety compliance and quality standards. Adept at training teams and enhancing performance, contributing to successful piping installations and system integrity. Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Piping Supervisor

KCPC
04.2022 - 11.2024
  • Ensured all piping systems were designed, constructed and installed in accordance with applicable codes and standards.
  • Verified that welders are qualified according to ASME Section IX Welding Qualifications.
  • Reviewed drawings, specifications and test procedures related to piping systems installations or modifications.
  • Developed detailed project plans for each phase of the project including timeframes, manpower needs and material requirements.
  • Supervised the fabrication, assembly and testing of pipe spools prior to installation on-site.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Performed daily inspections of tools, equipment, machinery and other resources used during construction activities.

Piping Supervisor

TECHIMONT ICB LTD.
Rajasthan
08.2018 - 11.2021
  • Monitor the progress of the piping work to ensure it is completed on time and within budget
  • Supervise and train personal
  • Perform hydro testing
  • Troubleshoot and diagnose any piping related issue
  • Manage and maintain documentation related to the piping installation process
  • Manage and coordinate the piping installation process
  • Obtaining work permit based on schedule daily activities
  • Monitoring and controlling the installation activities of pipe spools.
  • Maintaining safety protocols of live equipments and device
  • Monitor and supervised contractor installation, erection and testing of spools and prepare status of work based on the daily output
  • Coordinate activities relating to construction estimates and/or material takeoffs of partial or complete projects
  • Sign work permits on behalf of QP and to ensure that contractors compliance with conditions fixed on consolidated work permits
  • Prepare the punch list for finished work prior to handover to the client by the contractor, paying special attention to all equipment, including quality checks.
  • Liaise and report with the QC Inspector on quality related matters
  • Responsible for the final approval of drawings to ensure conformity with applicable codes and specifications and established discipline standards

Education

Mechanical Engineering

IIMT
New Delhi
08-2016

Skills

  • Welding inspection
  • Hydro testing
  • Project management
  • Piping design
  • Safety compliance
  • Document management

Languages

Hindi
First Language
English
Elementary (A2)
A2
Urdu
Beginner
A1

Certification

  • NDT LEVEL II
  • AUTO CAD IN MECHANICAL ENGINEERING

Timeline

Piping Supervisor

KCPC
04.2022 - 11.2024

Piping Supervisor

TECHIMONT ICB LTD.
08.2018 - 11.2021

Mechanical Engineering

IIMT
Aurangzeb Mallick