Keep systems running smoothly and efficiently to support business needs. Detail-oriented and methodical professional well-versed in root cause analysis and performance improvements.
Overview
5
5
years of professional experience
Work History
Mechanical Fitter
Viraj Profiles Ltd
Boisar, Maharashtra
07.2021 - Current
Conducted preventive maintenance of ABP (30 MT) and ET (100 kg and 25 MT capacity) furnaces to ensure optimal operation and avoid unexpected breakdowns.
Performed timely breakdown elimination and repair work to minimize production downtime.
Managed operation and routine maintenance of DM water plants to support manufacturing processes.
Maintained water pumps and pneumatic tools to ensure reliability in daily operations.
Serviced and repaired Vibrofeeder and transfer trolleys used in material handling.
Worked in various shifts, and collaborated with different teams to streamline maintenance activities.
Performed alignment and installation of HT and LT motors and gearboxes to ensure efficient conveyor system operation.
Maintained and repaired pipeline systems including drinking water systems in industrial plant settings.
Hydraulic Powerpack maintenance
Conducted maintenance and repair of hydraulic powerpacks like Furnace tilting unit and utility equipment
Collaborated with engineers to improve assembly processes and reduce downtime.
Junior Manager - PRODUCTION AND PROCESS CONTROL at VIRAJ PROFILES LIMITED(SRM)Junior Manager - PRODUCTION AND PROCESS CONTROL at VIRAJ PROFILES LIMITED(SRM)