Electrical engineer having 14+ years' experience in Power System, Industrial Automation, Electrical Maintenance, Planning, Project Management, SAP PM, TQM & Digitalization. Currently working as Senior Manager, at JSW steel ltd , India's largest steel producer.
Active Participant of JSW Steel's Deming Award Journey.
Presently Working as a area incharge and looking after the maintenance and spare planning of Power System, PLC and DCS of Raw Material Handling Systems like Conveyor, Crusher, Screen, Stacker Reclaimer, Twin Boom Stacker, Barrel Reclaimer, Wagon Tippler.
Handled Electrical & Automation Projects of RMHS Dept for 7 MT & 10 MT & 18MT Expansion of JSW Steel Ltd.
Industrial Automation
1. Yard Moving Machine wireless communication establishment and avg troubleshooting time reduction by approx 20%.
2. Wagon Tippler Tippling time reduction from 4min 30 sec to 3 min 20 Sec per wagon.
3. One Wagon Tippler existing 110 V AC PLC replaced with 24V DC PLC and recommissioned within 6 days.
4. Barrel Reclaimer Manless operation ( under progress )
5. Barrel Reclaimer PLC upgraded in 48 Hours.
6. Hydraulic system controlled Spider card replaced with existing PLC signals , saving 10 - 20 lakhs per equipment.
7. Conveyor Hydraulic power pack commissioned in 24 Hours.
8. MSExcel report generation from Rockwell Automation software RSLinx.
1. Yard Moving Machine wireless communication establishment and avg troubleshooting time reduction by approx 20%.
2. Wagon Tippler Tippling time reduction from 4min 30 sec to 3 min 20 Sec per wagon.
3. One Wagon Tippler existing 110 V AC PLC replaced with 24V DC PLC and recommissioned within 6 days.
4. Barrel Reclaimer Manless operation ( under progress )
5. Barrel Reclaimer PLC upgraded in 48 Hours.
6. Hydraulic system controlled Spider card replaced with existing PLC signals , saving 10 - 20 lakhs per equipment.
7. Conveyor Hydraulic power pack commissioned in 24 Hours.
8. MSExcel report generation from Rockwell Automation software RSLinx.