Overview
Work History
Education
Certifications/Recognition
Industrial Standards
Tools
Achievements
Languages
Timeline
Generic

Avinash Kulkarni

Overview

10
10
years of professional experience

Work History

Senior Electrical Engineer

Applied Materials
Bengaluru
03.2026 - Current
  • Responsible for Electrical Schematics Using E3s along with Enhanced AI Integration.
  • Single Point of Contact for Project-Single Point Of Failure
  • Harness Routing Using Creo Cabling

Design Engineer

Caterpillar
Bengaluru
05.2024 - 03.2026
  • Electrical design of data centre gensets ranging from 2000 kVA to 5000 kVA.
  • Implemented the Eplan Propanel tool at Caterpillar.
  • Lead Engineer for all the major projects for Middle Eastern and European sites.
  • Led standardization initiative by implementing 200+ macros in Eplan, reducing design cycle time by 30% and improving team efficiency
  • Handling lead projects to deliver flash files for Schneider, in-house PLCs.
  • Customized Eplan Tool along with Integration of Phoenix Labels, Saving manual efforts

Lead Engineer

Quest Global/Client-Caterpillar
Bengaluru
05.2022 - 04.2024
  • Lead Engineer for Electrical Schematics for Large Power Solutions.
  • Key Person to work/Preform task on Legacy tool- Eplan
  • Created Multiple Part Data Base, Macros, Templets.
  • Played Multiple Roles in Standardizing the E-plan tool.
  • Worked on Multiple Projects From Creating 2D&3D Schematics.
  • Built Multiple ""How To do's"" Presentations for Eplan
  • Experienced on PLM Tools - Team Center for release
  • Worked on Multiple ECN's/ECR's

Electrical Engineer

HCL Techologies/-Client-Applied Materials
Bengaluru, India
03.2018 - 05.2022
  • Applied Materials-HCL Technologies Bengaluru,KA.
  • Expertized in OEM Components selection on SEMI Domain Communicated with clients directly and handled projects and their deadlines.
  • Harness design routing and Desgin responsibilities.
  • PLC & HMI Programming For all Major Brands(Siemens, Allen Bradley Mitsibushi,Omron, Delta)
  • Designing interconnect Schematic for Tool.
  • SIngle Point of Contact for Onsite Recruitment Successfully managed training programs of 20 Employees.
  • Collaborated with engineers and customers to discuss existing and potential engineering projects and products.
  • Initiated meeting of electrician contractors to improve communications and convey project expectations and requirements.
  • Drafted and submitted Engineering Change Orders for review.
  • Performed complex calculations to establish manufacturing and installation specifications.
  • Prepared daily project status updates to inform staff and document project changes.

Executive Engineer

Norican Group-DISA India Limited
Bengaluru, India
07.2016 - 03.2018
  • Responsible for preparation of Electrical Control Schematic drawings.
  • Responsible for preparation of IO list ,Cable Schedule and BOM Responsible for software development using TIA portal and STEP 7.
  • Responsible for Database development.
  • Incharge of simulation of the developed software Panel design using EPLAN software.
  • Completed transformer load checks for consumer load form approval.
  • Helped initiate more organised drawing package to increase manufacturing productivity.
  • Worked on Multiple Industrial Automation Controllers PLC's, Motion Controllers etc

Education

B.E - Electronics & Communication

Mewar University
01-2016

Diploma - Electronics & Commuction

K.H.Kabbur
01-2012

SSLC -

Vignan High School
01-2006

Certifications/Recognition

  • Collaborative Ideas-PLM Tool-Agile/TC -Mapping OEM Parts with Identical Tools
  • On Time Delivery Recognition for AWS KSA
  • Certification of Eplan Propanel & P8
  • Equipment/System Grounding Awarded with Best Know Methods

Industrial Standards

  • SEMI S2,S8
  • IEC,NFPA-79
  • ANSI

Tools

  • Eplan Propanel
  • Zuken E3s
  • Creo Schematics
  • PLC/HMI Programming-(LD,FD)-All Major Brands
  • Gx works(Mitsubishi),Cx Programming(Omron),TIA(Semiens-1400/1500)

         Bosch Indralogic(Codesys),Studio 5000 Logix designer(Allen Bradley)

Achievements

  • Certification on Eplan Pro panel
  • Awarded for on time completion of Project-AWS KSA
  • Idea Selection on Mapping Multiple OEM parts for its reporting Tool/Structure

Languages

  • Kannada
  • Hindi
  • Telugu
  • English

Timeline

Senior Electrical Engineer

Applied Materials
03.2026 - Current

Design Engineer

Caterpillar
05.2024 - 03.2026

Lead Engineer

Quest Global/Client-Caterpillar
05.2022 - 04.2024

Electrical Engineer

HCL Techologies/-Client-Applied Materials
03.2018 - 05.2022

Executive Engineer

Norican Group-DISA India Limited
07.2016 - 03.2018

SSLC -

Vignan High School

Diploma - Electronics & Commuction

K.H.Kabbur

B.E - Electronics & Communication

Mewar University
Avinash Kulkarni