Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic
AYAN KUMAR PANDA

AYAN KUMAR PANDA

NEW DELHI

Summary

With over 8 years of experience in Telecom, Instrumentation,Optical Fiber Communication,and Project Management,I am an accomplished Engineer professional. I am deep at utilizing my interpersonal skills, excellent time management, and problem-solving abilities to tackle professional challenges.Known for my exceptional organizational skills, I possess the capability to manage diverse priorities with a positive attitude. I am dedicated to taking on additional responsibilities in order to contribute to team goals.

Currently seeking a full-time position where I can continue to apply my expertise and continue to grow professionally.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Deputy Engineer

MECON LIMITED
New Delhi
01.2025 - Current
  • Project designing,Implementation,Monitoring of Telecom Projects in OIL & GAS Area. SCADA Implementation and Up gradation in different OIL & GAS Projects.SAP Material Management.SAT and FAT of different sub-parts involved in completion of Projects.Project management with different stake holders.Working in SDH,MPLS system with OSI Model. Designing of Instrumentation parts,PID Drawing for collecting real time data in the field.
  • Generated engineering documentation and oversaw design projects.
  • Ensured quality control procedures were followed during each phase of a project's execution.

Project Engineer

BHARAT ELECTRONICS LIMITED
Kharagpur,West Bengal
05.2023 - 12.2024
  • Project designing,Implementation,Coordination,Monitoring and HOTO in Indian Air Force Project Under Ministry of Defence. Handling different complex sub-parts of Projects like Telecom System. OFC, Network Communication,Field Instruments,Integrated Building management System,CCTV,ACS,Electro Magnetic Pulse Protection System,IP EPBAX, FDASS,Different Electrical MV,LV Panels,HT & LT Transmission,SAP Material Management.Project Management with different stake holders,vendors,Sub Vendors.
  • Researched feasibility, design or performance of components or systems.
  • Reviewed blueprints, drawings and specifications for accuracy and completeness prior to construction commencement.
  • Identified cost saving measures that could be implemented without compromising safety or quality standards during the project life cycle.

Field Engineer

STERLITE TECHNOLOGIES LIMITED
Nabarangpur,Odisha
10.2022 - 04.2023
  • Project Designing,Implementation,Monitoring & HOTO of National Long Distance,Last Mile Connectivity project under Reliance JIO as a part of Extension of BHARATNET Project.GPS based project monitoring in real time.SAP billing,material management. SDH & MPLS implementation.Optical Fiber Communication,OTDR,Power Meter measurement.Project Management including Vendors,Sub Vendors,Local Public.
  • Analyzed and resolved technical issues encountered in the field promptly.
  • Performed on-site installation, maintenance, and repair of company equipment.
  • Managed teams effectively to cut project costs and comply with time and budget restraints.

Assistant Engineer Telecom

MECON LIMITED
Chaibasa,Jharkhand
03.2019 - 10.2021
  • 1. OFC connectivity to GPs from BHQ under Bharatnet project under Govt .of Jharkhand on behalf of BBNL. 2. Carry out survey with GPS based mapping and draw a digital route for fiber laying by consideringning of media. 4. Project report and progress report preparation in MS Excel. 5. SAP billing preparation for project executing agency. 6. Measurement Book and AT (Acceptance Testing) Documents Preparation. 7. Fiber acceptance report preparation by testing with OTDR( Optical time domain Reflectometer) & Power meter. 8. FTTH testing at customer end after service creation by coordinating with BSNL NOC. 9. Monitoring and coordination with all team members for proper roll out of fiber works. 10. Ensure material reconciliation by coordinating with respective stakeholders.

Assistant Engineer

RAILTEL CORPORATION OF INDIA LIMITED
Seppa,Arunachal Pradesh
12.2016 - 03.2019
  • 1. Installation and commissioning of Nodes (SDH & Equipments) under USOF (Universal Service Obligation Fund) project. 2. Installation and commissioning of GPON (Gigabit Passive optical Network) equipment of GPs under NOFN (National Optical Fiber Network) /BBNL project. 3. GPS based Project Monitoring. 4. Synchronization between SDH equipment and OLT(Optical Line Terminal) for smooth running of media by coordination with NOC (Node Operation Center). 5. Project report and progress report preparation in MS Excel. 6. SAP billing preparation for project executing agency. 7. Measurement Book and AT (Acceptance Testing) Documents Preparation. 8. Fiber acceptance report preparation by testing with OTDR (Optical time domain Reflectometer ) & Power meter. 9. BB Test at ONT (Optical Network Terminal) end after UPLINK between OLT &ONT. 10. FTTH testing at customer end after service creation by coordinating with BSNL & BBNL NOC.

Project Engineer

OATS PRIVATE LIMITED
Bhubaneswar,Odisha
08.2014 - 05.2016
  • 2G 3G CONFIGURATION ,BTS SWAPPING AND AT
  • Researched feasibility, design or performance of components or systems.
  • Interacted with clients to interpret needs and requirements.
  • Created accurate project specifications, documenting in technical manuals.
  • Coordinated activities with suppliers, contractors or other departments.
  • Coordinated meetings with stakeholders including clients, architects, engineers, subcontractors and other parties involved in the project.

Education

B.TECH - ELECTRONICS AND INSTRUMENTATION

C V RAMAN COLLEGE OF ENGINEERING
BHUBANESWAR,ODISHA
07-2014

Skills

  • Project planning
  • Project evaluation
  • Equipment installation
  • Site surveying
  • Engineering design support
  • Fiber optic installation
  • OTDR testing
  • Fiber optic testing
  • Instrumentation inspection
  • Field instrumentation
  • Design optimization
  • Industrial networking
  • Utilization management

Certification

  • GATE 2015 QUALIFIED IN INSTRUMENTATION
  • INDUSTRIAL AUTOMATION AT CTTC,BHUBANESWAR,DURATION-1 MONTH
  • SUMMER INTERNSHIP AT DRDO,CHANDIPUR FOR DEFENCE PROJECT-DURATION-1 MONTH
  • BRITISH ENGLISH CERTIFICATION-MEDIUM LEVEL-UNIVERSITY OF CAMBRIDGE

Languages

Odia
First Language
English
Proficient (C2)
C2
Hindi
Proficient (C2)
C2

Timeline

Deputy Engineer

MECON LIMITED
01.2025 - Current

Project Engineer

BHARAT ELECTRONICS LIMITED
05.2023 - 12.2024

Field Engineer

STERLITE TECHNOLOGIES LIMITED
10.2022 - 04.2023

Assistant Engineer Telecom

MECON LIMITED
03.2019 - 10.2021

Assistant Engineer

RAILTEL CORPORATION OF INDIA LIMITED
12.2016 - 03.2019

Project Engineer

OATS PRIVATE LIMITED
08.2014 - 05.2016
  • GATE 2015 QUALIFIED IN INSTRUMENTATION
  • INDUSTRIAL AUTOMATION AT CTTC,BHUBANESWAR,DURATION-1 MONTH
  • SUMMER INTERNSHIP AT DRDO,CHANDIPUR FOR DEFENCE PROJECT-DURATION-1 MONTH
  • BRITISH ENGLISH CERTIFICATION-MEDIUM LEVEL-UNIVERSITY OF CAMBRIDGE

B.TECH - ELECTRONICS AND INSTRUMENTATION

C V RAMAN COLLEGE OF ENGINEERING
AYAN KUMAR PANDA