Dynamic professional with 4 years of expertise in NPD, project management, manufacturing engineering, and production planning control
·
·
·
·
·
·
·
·
·
·
·
·
· Execute ERN and perform stock balancing.
· Collaborate with cross-functional teams (PMO, Design, ME, Store, Production, Quality QAD).
· Implement BOM (Bill of Materials) physically and systematically.
· Update BOM in PMS (Product Management System).
· Capture and resolve BOM errors.
· Responsible for all MIS reports on daily, weekly and monthly basis related to implementation and inventory control for BOP, FG, WIP and Scrap Parts.
· Monitoring declaration in system on daily basis after roll out the product.
· Daily meeting with SCM and Store to implement the ECN timely.
· Monitoring & physically check all aggregate on shop floor such as Engine, gearbox, rear Axle for Change any Serial number for new implementation.
· Circulate implementation plan for any project implementation and new product and parts trail
· Tracking the project (FSC, Cost saving and new development) and issue till initiation, execution and implementation on line as well in system.
· Monitoring declaration in system on daily basis after roll out the product.
· Process Documents (PFD, PFMEA, CP, OJT, SOP, Process sheet, Part Matrix, Model matrix, OPL, Model Staging).
· RFQ & manufacturing readiness for New Product Introduce (NPI) as per process.
· CRDI model Facilities readiness for production build.
· Experience in installing new machine or equipment’s on Assembly line.
· Experience in Low Cost Automation.
· Responsible for tool management establishment. Fixture, Gauge develop and Validation.
· Handling process activities working out various requirements w.r.t. planning, layout, facilities, machine/equipment & documentations.
· BOM error Project design confirmation, comparison between BOM and actual part.
· Line Side storage plan and Kitting implementation.
· Facility identification, planning and monitoring.
· Knowledge of Oracle (RMGP & Move Order, Purchase Request (PR) Capex requisition (CER).
· Provided Storage location for more than 1000 parts for new product.
• Repaired and serviced air conditioning engine cooling.
• Installed and replaced accessories including headlight, radios, side and rear-view mirror and windshield wiper.
AUTO CAD
Oracle ERP & Excel, MS word, Outlook, PowerPoint
Team Center
Workflow Tracker (Digitization)
• Ability to accept challenges & delivers theresults.
• Critical situation handling & Creative ideas.
• Effective Technical Skills for Machines & Vehicle.
• Best Initial Negotiator for New Machines Procurement.
I hereby declare that all information given by me is true, correct and best of my knowledge. I will be responsible for any kind of fault.