Production Optimization Engineer with 2.3 years of experience at Cairn Oil & Gas (Vedanta Ltd.), experienced in well monitoring, reservoir surveillance, WRFM-based production optimization, network monitoring, rig and rigless operations, data gathering, data management, production data interpretation, production enhancement identification, workover planning, and execution tracking, with proven involvement in 900+ rigless interventions and 240 workovers in upstream oil and gas operations.
Overview
4
4
years of professional experience
1
1
Certification
Work History
Production Optimization Engineer-WRFM
Cairn Oil and Gas, Vedanta Ltd.
Barmer
10.2023 - Current
Production Optimization Engineer with hands-on experience in reservoir surveillance, production planning, WRFM-based production optimization, and network monitoring for RJ North, Barmer Basin upstream oil and gas assets.
Led reservoir surveillance and production optimization initiatives for producers and injectors, focusing on maximizing oil production rates, recovery efficiency, and well life.
Planned, coordinated, and executed 900+ rigless interventions including slickline, e-line, and coil tubing jobs, along with 240+ workover operations.
Performed conformance surveillance using Injection Logging Tool (ILT) and evaluated injection profiles and impact on offset producing wells.
Owned end-to-end preparation, validation, and coordination of 5-year well performance, production trends, and reservoir data submissions for DGH, MoPNG, and internal stakeholders.
Accountable for rig and rigless operations planning, execution tracking, oil realization, and production optimization delivery.
Monitored performance of 400+ producing wells, performing daily rate allocation QA/QC using allocation principles, well testing, BSW sampling, MPFM data verification, and reservoir liquid reconciliation.
Monitored Jet Pump (JP), ESP, SRP, HRP, and PCP wells daily, identifying artificial lift optimization, productivity index (PI) improvement, wellbore cleanout, and production enhancement opportunities.
Developed RJ North production forecasts considering allocation factors, planned processing shutdowns, well revival programs, interference oil losses, unplanned losses, and growth projects to support CAPEX planning.
Executed debottlenecking initiatives and optimized well conversion hook-up activities, resulting in cost savings of INR 16 Crore.
Acted as single point of coordination between WRFM and cross-functional teams including Production Engineers, Reservoir Engineers, Facilities, Geology, Projects, Finance, and Well Operations and Operators on Field.
Managed deployment and scheduling of 4 coil tubing units, 5 slickline units, and 6 workover rigs for JP to ESP conversions, ESP treatments, JPCOs, PCP rod failures, PCP completion change-outs, SRP/HRP pump change-outs, and annulus de-choking.
Performed candidate selection based on incremental oil gain, Well failure analysis, well performance history, and flow assurance constraints; developed revival plans for failed and shut-in wells.
Designed and implemented Power BI dashboards for intervention tracking, candidate prioritization, unit allocation, and production performance monitoring.
Initiated and led shut-in well revival and sidetrack programs, identifying 12 sidetrack opportunities and performing economic evaluations, delivering ~250 BOPD incremental oil production.
Delivered sustained production uplift of ~700 BOPD, enhancing asset profitability by INR 27.7 Crore at $67.5/bbl oil price.
Conducted PROSPER modeling for Jet Pump and ESP wells to support artificial lift design, pump sizing, and change-out optimization based on operational data.
Prepared monthly Production Optimization Reports including planned vs actual incremental oil, operating cost ($/bbl) analysis, rolling production forecasts, and financial year growth tracking.
Conceptualized and planned 63 casing leak detection jobs using temperature logging and ILT, interpreting results using Emeraude (KAPPA) software.
Petroleum Engineering Intern
Cairn Oil and Gas, Vedanta Ltd.
Gurgaon
09.2022 - 11.2022
Conducted comprehensive Nolte-Smith plot analysis for hydraulic fracturing operations in the Aishwarya Barmer Hill (ABH) tight oil reservoir to evaluate fracture initiation pressure, net pressure.
Analyzed Step Rate Test (SRT), Diagnostic Fracture Injection Test (DFIT), and main fracture treatment data to assess fracture behavior.
Recommended frac fluid viscosity optimization for subsequent fracture stages, resulting in improved proppant placement, enhanced fracture effectiveness, and improved stimulation performance.
Petroleum Engineering Intern
Joshi Technologies International Inc. (JTI)
Dholka
08.2022 - 09.2022
Developing knowledge about surface facilities, oil and gas distribution network, GGS and gaining knowledge throughout the internship on SRP, Dynacard, checking counterbalance.
JTI is working as a operating company with having facilities of GGS and 38 Producing wells in 48 Sq km.
Education
Bachelor of Technology - Petroleum Engineering
Dr. Vishwanath Karad MIT World Peace University
Pune
07-2023
12th Board (GSEB) - HSC
Utkarsh High School
Ahmedabad
07-2019
10th Board (GSEB) - SSC
Bachpan High School
Surendranagar
07-2017
Skills
Prosper
Production Optimization
Time Management
Ms-Excel
Ecrin
Emeraude
Strong organizational skills
Interpersonal Communication
Production planning
Reservoir surveillance
Presentation Skills
Leadership Skills
Adaptability
Cooking
Certification
• Scoring the highest marks in drilling engineering-related subjects, June 2022. • Certificate of Recognition by the League of SPE Volunteers, March 2022. • Certificate of Appreciation by SPE for serving as President of the MIT WPU SPE Student Chapter, September 2022.
Languages
Gujarati
Hindi
English
Awards
GEM AWARD (Going Extra Mile), Took initiative in reviving of old shut injectors wells in Mangala by converting them from injectors to producers, these wells are contributing more than 400 bopd oil.
GEM AWARD (Going Extra Mile), Planned and optimized rig and rigless resources to maximize oil gain from various identified opportunities in RJ North which impacted oil realization of 500 bopd.
GEM AWARD (Going Extra Mile), Performed detailed Shut-in well analysis, enabling faster decisions, restoration of 500 bopd, and identification of further opportunities.
Mentored and Trained 2 Team Member.
Trained ~50 individuals under Vedanta CSR initiatives in Barmer on soft skills, workplace etiquette to
enhance career readiness.
Organized and led a tree plantation drive with the active participation of over 300 people.
Lead Petroleum Reservoir / Production Optimization Engineer at Oando Energy Resources Nigeria LtdLead Petroleum Reservoir / Production Optimization Engineer at Oando Energy Resources Nigeria Ltd