Summary
Overview
Work History
Education
Skills
Timeline
Generic
Azaad Yadav

Azaad Yadav

Project management
DEORIA

Summary

Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance.

Overview

4
4
years of professional experience
1
1
Language

Work History

Project Manager

Aditya Epc Infratech Pvt. Ltd
05.2024 - 07.2025
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Identified plans and resources required to meet project goals and objectives.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Coordinated cross-functional teams and resolved conflicts, maintaining a positive work environment throughout the project lifecycle.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Met project deadlines without sacrificing build quality or workplace safety.

Cnc Setter

Force Motors Limited-Akurdi
05.2023 - 04.2024
  • Adhered to strict deadlines while maintaining high levels of precision in part production.
  • Ensured product quality with thorough inspections of finished parts using various measuring tools.
  • Minimized waste generation through careful planning of raw material cutting patterns during programming phase.
  • Reviewed technical drawings to ensure correct interpretation of specifications for accurate machining processes.
  • Developed custom fixtures to increase setup efficiency and reduce part rejection rates.
  • Enhanced production efficiency by setting up and operating CNC machines for precise manufacturing.

CNC Machine Operator

Trinity Engineers
04.2021 - 03.2022
  • Properly loaded and unloaded materials in and out of machines.
  • Maintained tight tolerances with design specifications.
  • Kept accurate operating records by documenting machine usage, production numbers and any issues that arose.
  • Input instructions to program CNC machines to control machine movement and produce parts to specification.

Education

NAC - Technology Education

Eastern Railway
Munger, India
04.2001 -

CITS - Instructor

NSTI
Kolkata, India
04.2001 -

ITI - Technical

Govt Iti
Deoria
04.2001 -

Intermediate -

Harsh Chandra Intermediate College
Deoria, India
04.2001 -

High School -

Assumption Public School
04.2001 -

Skills

Project management

Timeline

Project Manager

Aditya Epc Infratech Pvt. Ltd
05.2024 - 07.2025

Cnc Setter

Force Motors Limited-Akurdi
05.2023 - 04.2024

CNC Machine Operator

Trinity Engineers
04.2021 - 03.2022

NAC - Technology Education

Eastern Railway
04.2001 -

CITS - Instructor

NSTI
04.2001 -

ITI - Technical

Govt Iti
04.2001 -

Intermediate -

Harsh Chandra Intermediate College
04.2001 -

High School -

Assumption Public School
04.2001 -
Azaad YadavProject management