Results-driven quality assurance professional with extensive experience at ISGEC Heavy Engineering Limited. Proven expertise in quality control, welding standards, and equipment commissioning. Strong communicator skilled in MS Office and AutoCAD, adept at implementing TQM practices to enhance operational efficiency. Committed to upholding Indian, American, and European standards in all projects.

Overview

14
14
years of professional experience

Work History

ASST. MANAGER , QUALITY DEPARTMENT

ISGEC HEAVY ENGINEERING LIMITED
01.2013 - Current
  • Quality Assurance and Control of the Fabricated steel materials, Machined parts, Valves, Steel forging, Shafts etc.
  • Rotary Equipment installation and alignment and commissioning on field
  • Pumps installation and alignment and commissioning on field
  • Machine assembly and commissioning on field (ship Unloader, Stacker and Reclaimer, Wagon Tippler)
  • Conveyor system installation, Alignment and commissioning.
  • Steel silo storage bins of capacity up-to 800M3 fabrication, installation.
  • Pneumatic Dense phase ash handling system installation and commissioning.
  • ESP installation and commissioning
  • Quality assurance and control of Welding for carbon steel, alloy steel, Stainless Steel by SMAW, GTAW, GMAW, SAW includes WPS, PQR, WQT, NDT.

GET

PRICOL LTD
Coimbatore
01.2012 - 12.2012
  • Trained on basic industrial working culture, various manufacturing methods, Heat treatment and material testing, Quality tools and TQM. special training on Sintered components manufacturing.

Quality Engineer

Sri Renganather Valves
Coimbatore
06.2011 - 12.2011
  • Quality assurance and control in steel foundry shop and machine shop. Steel valve castings inspection and machining, painting inspection.

Education

Diploma in welding - NDT

Nille Solutions
Chennai
03.2015

B. E -

Einstein College of Engineering
Tirunelveli
04.2011

Skills

  • Communication
  • MS OFFICE
  • Auto cad
  • Learning
  • Quality related
  • Indian, American and European standards

Projects

  • 07/01/22 To Present, VEDANTA LTD, LANJIGARH, 5MTPA bauxite handling system EPC Project includes EPC of one twin tandem wagon tippler and one single tandem wagon tippler which unload bauxite from wagon @ 13 rakes per day capacity and discharge it to conveyor. One Reversible stacker cum reclaimer and one slewing stacker and one bucket wheel reclimer which stack bauxite from conveyor @3000TPH and discharge the same to reclaiming route at 2500TPH. Vibratory screen and crusher to crush the bauxite and discharge it to silo.
  • 11/01/19 To 06/30/22, KICTPPL, PARADIP, Development of coal terminal at Paradip port. System includes 2 Grab Ship Unloaders of 2750TPH capacity which unloads coal from ship up to 175000 MT cape vessel and discharge it to conveyor. 3 Stacker cum Reclaimer with 5500TPH stacking capacity and 4500TPH reclaiming capacity which stack coal from SUL in stack yard and reclaim coal from stack yard and supply it to the conveyor. 2 No. Rapid Loading system with capacity 12 rakes per day.

 

  • 12/01/18 To 10/31/19, PT. DUS, INDONESIA, 1X75TPH AFBC BOILER FOR 6MW CO GEN. POWERPLANT. Supply and erection of Bottom supported underbed feeding bi drum AFBC boiler with coal bunker, ESP, coal feeding from bunker to boiler, ash silo, ash handling from ESP to silo, steel stack chimney.
  • 11/01/17 To 11/30/18, SHAKAMBHARI ISPAT(P) LTD, ASANSOL, 1X100TPH CFBC BOILER FOR 25MW CAPTIVE POWERPLANT. Top supported overbed feeding single drum CFBC boiler, Feed water piping from pump to boiler, steam piping from boiler to turbine, coal bunker, fuel feeding from bunker to boiler, FD and ID fan.
  • 04/01/16 To 10/31/17, HMEL, BATHINDA, 2X300TPH CFBC BOILER. Supply and Erection of 300TPH top supported overbed feeding CFBC boiler, ESP.
  • 02/01/15 To 03/31/16, WELSPUN LTD, VAPI, GUJARAT, 2 X 100TPH CFBC BOILER. Installation and commissioning of Boiler, rotary equipments and pumps. Feed water piping, steam piping. Air and flue gas ducting. Fuel feeding system. Initial firing system.
  • 02/01/13 To 01/31/15, BHUBANESWAR POWER PVT LTD, BHUBANESWAR, ODISHA, 2 X 275TPH CFBC BOILER INSTALLATION AND COMMISSIONING. Installation and commissioning of Boiler, rotary equipments and pumps. Feed water piping, steam piping. Air and flue gas ducting. Fuel feeding system. Initial firing system. Refractory work. Insulation work.

Personal Information

  • Date of Birth: 11/05/88
  • Nationality: Indian
  • Marital Status: Married
  • Religion: Hindu

Timeline

ASST. MANAGER , QUALITY DEPARTMENT

ISGEC HEAVY ENGINEERING LIMITED
01.2013 - Current

GET

PRICOL LTD
01.2012 - 12.2012

Quality Engineer

Sri Renganather Valves
06.2011 - 12.2011

Diploma in welding - NDT

Nille Solutions

B. E -

Einstein College of Engineering
Azhagusakthi R