Summary
Overview
Work History
Education
Skills
Accomplishments
Award and Achievements
Timeline
AccountManager
B. HARIHARAN

B. HARIHARAN

Supply Chain - Logistics And Warehouse Management
Chennai

Summary

Disciplined Supply Chain Management Intern with in-depth knowledge of calculating total supply chain costs procurement principles, practices and procedures. Plans timetables, cultivates supplier relationships and manages supplier agreements and stock levels. Excellent strategic planning, inventory management and vendor management abilities. Skilled in negotiation and strategic decision making, perfected by 8 years of experience in leading organizational business units.

I have been worked in manufacturing and quality in stamping &Blanking department for six years in FORD INDIA VEHICLE ASSEMBLY plant in the initial period( 2009-2015).

Overview

14
14
years of professional experience
10
10
years of post-secondary education
2
2
Languages

Work History

SUPPLY CHAIN, Expeditor

FORD PDC, DISTRIBUTON CENTER CHENNAI
MARAIMALAINAGAR
12.2017 - Current

Responsibilities Supply chain Operations:- Expeditor

  • Analyzed statistical data and reports to determine trends is performance.
  • Hands of Experience in inventory managing ,Fill rate, Export & Domestic Back orders ,Process Tools ( PANDA & ORACLE DATA BASE), MS Office.
  • Logistics expertise in Milk run, export container, domestic vehicle proper utilizing & Documents procedures.
  • Technical knowledge in Layout of planning in warehouse& &Inventory management, Min Max planning for critical parts, bill payment , claims process for defective parts , Kaizen activity, 5S follow,
  • Possess strong knowledge of Warehouse movement, Logistic operation, Finance payment clearance & Inventory part Quality.
  • Currently Strong Knowledge in ( Process tools handling – PANDA & ODBC, Excel)
  • Responsible for implementing Supply chain Flow Charts, Standard Work, Procedures, Control Plans and by ISO standards.
  • Ensuring adherence to the quality standards as per ISO 9001:2015
  • Analysis of Key performance indicators like OEE, Rejection, Customer complaints and Market complaints
  • Responsible of my right suppliers and suppliers query.
  • Responsible for new model parts & new level change parts quality and inventory control.
  • Implementing corrective action for Customer complaints, Market complaints & conducting hourly for Quality and supplied to customer.

Supply Chain ware house Associate

FORD PDC, PART DISTRIBUTON CENTER CHENNAI
Maraimalainagar
02.2015 - 01.2017

Responsibilities Warehouse Operation:-

  • Auditing & checking sheet sign for HPV vehicles and dock movement automation there by ensuring zero accident.
  • Checking the inventory and quality of the parts obtained from the plant.
  • Shipping the BIW parts to supplier and checking the shipping document procedure. ( E- coating process)
  • Ensuring the part identify tags and pallets quality checking.
  • Supplier Inventory parts quality checking and Bill document verification.
  • Coordinator for RGP & NRGP Documents in warehouse.
  • Monitoring the 5S system where work can take all warehouse zone.
  • Overtake entire shift warehouse related tasks including Planning, Control and Troubleshooting for E-coat process with a team of 10 Associates.
  • Go to the supplier’s place once a week and check the quality and Inventory status.
  • Daily inspection of Auditing at the place of packaging, shipping, Inventory, Fire evacuation assembly point.

Stamping and Blanking Production Associate

FORD INDIA PRIVATE LTD
Maraimalainagar
05.2009 - 01.2015
  • Worked as Production &quality
  • Overseeing shift production related tasks including planning, control and Troubleshooting with a team of 14 line peoples.
  • Flow the production by QOS ( Quality operating System) Standard.
  • Responsible for the calibration and monitoring of Dies, fixtures, Gauges and measuring instruments required for production.
  • Crane operation Dies loading & Safety control.
  • Troubleshooting manfacturing problems and implements sustainable corrective actions.
  • Process planning with relevant machining process documents -QPS.
  • Coordination with team for NWG ( Natural work Group)
  • Responsible for Kaizen, Near miss coordinator.
  • coodination with maintenance for preventative , periodic and shutdown maintenance for machines
  • Block closer activity support support with maintenance team,
  • Ensuring adherence to the quality standards as per ISO 9001:2015

Education

Electrical & Electronics Engineering

SRM Engineering College
Maraimalainagar
03.2013 - 12.2016

Diploma - Electronics & communication Engineering

St.Xavier’s Polytechnic of Polytechnic Tirunelveli
Tirunrlveli
06.2005 - 05.2008

HSS - Commerce computer science

Schaffter Higher Sec School
Tirunelveli
06.2003 - 05.2005

S.S.L.C -

Schaffter Higher Sec School
Tirunelveli
04.2002 - 04.2003

Skills

MS-office

undefined

Accomplishments

  • Presently Expeditor in PDC- FORD INDIA PVT, LTD – Supply chain Department
  • Expertly support and manage day to day purchasing operations
  • Strategically source new vendors and manage existing vendor relationship for all indirect materials , services, and equipment
  • Strong Knowledge in fundamentals of Supply chain management
  • Handled all client(suppliers) requests for information
  • Strong knowledge skills in Accounting , Auditing ,Billing, Data Analysis, Data Management, Financial, Inventory Management, Invoicing, Po issues, Supply and demand requirements.

Award and Achievements

  • Cost saving - Recycling process the packing materials from plant to FORD PDC( WOOD & Carton Metrials).
  • Aware for achieving lowest Dealers Back orders.
  • Hands of Experience in lowest back order in export & domestic market, 99 % fill rate metrics achieved in 12 month
  • 5-years loyalty & Contribution –Best appreciation award.
  • 10-years loyalty & Contribution –Best appreciation award.
  • I got awarded in Plant wise first price and participant state level KAIZAN competition – 2012.
  • Safety drawing competition – First Price.
  • Kaizen plant wise first price, Quiz competition.
  • Safety Promotional activity -2012
  • Implemented 7days roaster plan successfully in stamping press line.
  • Eliminated ergonomics issues & HPV reduction in Shearing operation.
  • Implemented comment MANSTAND in stamping press line- 1st price – KIZAN.
  • Highest number of near miss & safety suggestion by Individual – First &Second Price ( 2010& 2012).

Timeline

SUPPLY CHAIN, Expeditor

FORD PDC, DISTRIBUTON CENTER CHENNAI
12.2017 - Current

Supply Chain ware house Associate

FORD PDC, PART DISTRIBUTON CENTER CHENNAI
02.2015 - 01.2017

Electrical & Electronics Engineering

SRM Engineering College
03.2013 - 12.2016

Stamping and Blanking Production Associate

FORD INDIA PRIVATE LTD
05.2009 - 01.2015

Diploma - Electronics & communication Engineering

St.Xavier’s Polytechnic of Polytechnic Tirunelveli
06.2005 - 05.2008

HSS - Commerce computer science

Schaffter Higher Sec School
06.2003 - 05.2005

S.S.L.C -

Schaffter Higher Sec School
04.2002 - 04.2003
B. HARIHARANSupply Chain - Logistics And Warehouse Management