Summary
Overview
Work History
Education
Skills
Timeline
Generic

Balakrishnan NA

Maintenance Engineer
Salem

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. With 4+ years of experience performing diverse maintenance and repair duties. Dedicated to maintaining optimal equipment functionality by managing routine and complex equipment and facility matters. Strong knowledge of hand and power tool operation and safety measures. Willingness to take on added responsibilities to meet team goals.

Overview

5
5
years of professional experience
2
2
Languages

Work History

Maintenance Engineer

ESSAE Gears And Transmission Private Ltd.
2022.12 - Current
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Had maintenance experience with 350 KW IBH,Kurimoto 1500T press,630T & 200 Ton press,Pit furnaces, Normalizing furnace&Hydraulic press
  • Also had maintenance experience with 600 KVA DG,compressors & Transformers
  • Knowledge in TPM and involved myself in IATF and customer audits
  • Effective in Technical Documentation (Daily, Monthly Power consumption reports, BD/Loss Analysis, TPM Audit & Energy Audit
  • Diagnosed and resolved machine operation variations and equipment problems.
  • Developed preventive maintenance schedules to minimize downtime and optimize performance.
  • Involved in Material Requisition Planning& Maintaining Critical spares.
  • Trained and supervised staff on equipment maintenance and safety procedures.

Trainee Engineer

MM Forgings Private Ltd.
2020.09 - 2022.08
  • Studied manufacturing processes to improve overall knowledge.
  • Good work experience and knowledge in Induction Billet Heater (Operation, Maintenance & Development Activities)
  • Commissioning of 3500 KW Induction Billet Heater Machine .(Includes erection of ACB’s,5000KVA Transformer,Cooling Tower and DM Water Circuit with Heat Exchanger assembly)
  • Involved in Upgrading 2500 KW IBH to 3500 KW & 3500KW IBH to 4000KW IBH (Includes Addition of Additional Modules & Separate Breaker Assembly)
  • Involved in Commissioning 150KW Induction Hardening machine.
  • Involved in Transformer Maintenance (2500 KVA,3000KVA,3600KVA & 5000KVA)
  • Cooling Tower Maintenance (Includes 40HP,25 HP,15 HP & 7.5 HP Pumps & Starter Box)
  • Good understanding of Electrical Drawings, Planning of Projects, Erection & Maintenance.
  • Also contributed in Technical Documentation (Organizing Checklists, Planning accordingly with PM Calendar, BD Analysis)Effective in KAIZEN.

Site Engineer

Sri Krishnaa Engineering
2019.03 - 2020.05
  • Erection of DP Transformer Structure up to 100KVA/22KV.
  • Erection of RCC & Metal Poles upto 9Mtr
  • Erection of Earth pits and Stay pits.

Education

B.E - Electrical, Electronics Engineering Technologies

RMK Engineering College
Thiruvallur
2001.04 -

Higher Secondary

GV Higher Secondary School
Salem
04.2016

Skills

    Root Cause Analysis

Equipment Maintenance and Repair

Electrical Systems

Electrical Installations

Timeline

Maintenance Engineer

ESSAE Gears And Transmission Private Ltd.
2022.12 - Current

Trainee Engineer

MM Forgings Private Ltd.
2020.09 - 2022.08

Site Engineer

Sri Krishnaa Engineering
2019.03 - 2020.05

B.E - Electrical, Electronics Engineering Technologies

RMK Engineering College
2001.04 -

Higher Secondary

GV Higher Secondary School
Balakrishnan NAMaintenance Engineer