Summary
Overview
Work History
Education
Skills
Accomplishments
Reading and trekking
Timeline
Generic
Basavaraj Sankaratti

Basavaraj Sankaratti

Production Manager-Machine Shop.
Pune

Summary

Dynamic Production Manager with a proven track record at ADVIK Hi-Tech Private Limited, enhancing production efficiency through strategic resource planning and problem-solving analysis. Successfully reduced waste and costs while fostering team collaboration, driving continuous improvement initiatives that significantly boosted productivity and aligned operations with market demands.

Overview

22
22
years of professional experience
4
4
Languages

Work History

Production Manager

ADVIK Hi-Tech Private Limited
11.2018 - Current
  • Resolved issues quickly to maintain productivity goals.
  • Managed internal operational standards and productivity targets.
  • Increased overall productivity by identifying bottlenecks in the production process and proposing effective solutions.
  • Managed continuous improvement initiatives to drive gains in quality, flow, and output.
  • Conducted root cause analysis on production issues, devising corrective actions to prevent recurrence.
  • Reduced waste and material costs by optimizing resource allocation and inventory management.
  • Monitored team budgets to keep projects on task and avoid waste.
  • Coordinated with sales and marketing departments to align production schedules with demand forecasts, maximizing both efficiency and customer satisfaction.
  • Enhanced production efficiency by streamlining processes and implementing lean manufacturing techniques.
  • Reduced material waste, leading to cost savings, by optimizing production planning and inventory management.
  • Streamlined production processes, significantly reducing downtime and increasing efficiency.
  • Improved team productivity with introduction of flexible shift patterns that matched production demands.
  • Managed budgeting and cost control measures for production department, staying within financial targets.

Assistant Manager

VARROC ENGINEERING PVT.LTD.
02.2011 - 09.2018
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Improved customer satisfaction by addressing and resolving complaints promptly.
  • Developed strong working relationships with staff, fostering a positive work environment.
  • Promoted teamwork within the workplace by encouraging collaboration among staff members on various project tasks.
  • Collaborated with the management team to develop strategic plans for business growth and improvement.
  • Mentored junior staff members in their professional development by offering guidance/support in their assigned roles.

Production Engineer

SPACO TECHNOLOGIES (I) PVT.LTD.
02.2008 - 02.2011
  • Managed production schedules, ensuring timely delivery of products while maintaining high quality standards.
  • Performed root cause analysis and implemented corrective actions.
  • Provided technical support to troubleshoot equipment issues, minimizing downtime and maintaining production targets.
  • Communicated with other team members to enhance process and performance.
  • Supervised entire production process and prepared proper documentation for dispatch.

Production Engineer

AURANGABAD ELECTRICALS LTD.
10.2005 - 02.2008
  • Completed and submitted monthly and yearly reports to support executive decision making.
  • Inspected all machines and equipment and provided necessary repairs.
  • Streamlined workflows to reduce bottlenecks and improve overall productivity rates.
  • Performed regular production studies and machine analysis to identify any quality and process problems.
  • Decreased defect rate by applying process capability analysis and creating weekly defect reports.

Associate Engineer

CONCENTRIC PUMPS(I) PVT.LTD
03.2004 - 10.2005
  • Collaborated with cross-functional teams to develop and implement engineering projects on time and within budget.
  • Enhanced product reliability through thorough testing, quality control measures, and regular maintenance.
  • Supported project management initiatives through detailed documentation, scheduling, and progress tracking.
  • Developed action plans to aid in meeting defined objectives and streamlining existing processes.
  • Developed comprehensive training materials for new hires, improving onboarding effectiveness and reducing time spent in training sessions.

Education

Diploma in Mechanical Engineering - Mechanical Engineering

CVC Rural Polytechnic.
Hungund , Karnataka
04.2001 -

Skills

Production scheduling

Accomplishments

  • Proficiently supervised 07 production lines, oversaw materials inspection, scheduled production and conducted weekly physical inventories.

Reading and trekking

READING

I loved to read about our nation rich and enormous history

Eg-[About kingdoms, Rise and downfall of Empires, Cultural diversity etc]


TREKKING

I loved to trek the green mountains in Sahyadri and also loves to visit Forts

Eg-[Visapur fort, Lohgad fort, Sinhagad fort, Janjira fort, Karla caves etc]

 

Timeline

Production Manager

ADVIK Hi-Tech Private Limited
11.2018 - Current

Assistant Manager

VARROC ENGINEERING PVT.LTD.
02.2011 - 09.2018

Production Engineer

SPACO TECHNOLOGIES (I) PVT.LTD.
02.2008 - 02.2011

Production Engineer

AURANGABAD ELECTRICALS LTD.
10.2005 - 02.2008

Associate Engineer

CONCENTRIC PUMPS(I) PVT.LTD
03.2004 - 10.2005

Diploma in Mechanical Engineering - Mechanical Engineering

CVC Rural Polytechnic.
04.2001 -
Basavaraj SankarattiProduction Manager-Machine Shop.