Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic
Bhamidipati B Sitaramam

Bhamidipati B Sitaramam

Hyderabad

Summary

Accomplished Sr. Manager in Engineering & Projects at AMNEAL Oncology Pvt. Ltd, adept in documentation control and fostering team motivation. Spearheaded critical USFDA audits and major engineering projects, showcasing expertise in HVAC and environmental awareness. Proven track record in enhancing operational efficiency and project execution at Hyderabad International Convention Centre & Novotel.

Overview

27
27
years of professional experience

Work History

Sr. Manager in Engineering & Projects

AMNEAL Oncology Pvt. Ltd
05.2015 - Current
  • First line member of USFDA in 2016, 2018, 2019 and 2023
  • First line team member in approved CANADA Audit in 2016
  • First line team member in DUTCH (MHRA) audit completed
  • Executed projects: Introduction of Paclitaxel product
  • Facility modification for introduction of new equipments for manufacturing of paclitaxel product in liquid line and PFS line manufacturing area
  • Paclitaxel product manufacturing process equipments and required utility equipments technical finalization, installation and commissioning
  • Installation and qualification completed for two brain chillers, one hot water system, five manufacturing vessels, CIP & SIP skid, Tangent flow filtration, inline homogenizer and high-pressure homogenizer etc
  • Replacement of existing powder line: Fabtech Vail washing machine, tunnel with NKP powder filling machine with isolator powder filling line is replaced with Romaco robotic powder filling machine with Klenzaids Tunnel and washer
  • All documents provided and supported for validations all utilities, HVAC, area modifications as per the requirement is provided with necessary validations
  • Commercial batches are successfully produced
  • Powder filling line: Fabtech Vail washing machine, tunnel with NKP powder filling machine with isolator powder filling line with manufacturing, filtration vessels, external drying machine integrated line project executed
  • All documents provided and supported for validations all utilities, HVAC, area modifications as per the requirement is provided with necessary validations
  • Commercial batches are successfully produced
  • Trucking liquid filling line: The existing liquid filling line replaced with trucking vial washing machine, Tunnel, 12 head liquid filling machine with two auto loading, unloading systems for two Lyophilizes each 10 cum, vial ceiling machine, External drying machine with isolators
  • All utilities, HVAC, area modifications as per the requirement is provided with necessary validations
  • This line is suitable to execute the vials from 2 Ml to 100 Ml
  • Necessary support give for validations and completed the projects
  • Commercial batchers are executed after successful media fill results
  • Enhancement of Water system: Successfully completed Water system PW and WFI storage and distribution loops with SCADA system are executed with 6 Kl and 3 Kl storage capacity tanks respectively with required qualifications
  • 1000 kg / hr pure steam generator and 1000kg/ hr
  • WFI generation plant installation and qualifications are completed and released for regular usage
  • Chemical subitizable reverse osmosis 12 cum / hr capacity installed and validated in raw water area
  • Paclitaxel Project: Prefilled syringes line converted in to paclitaxel manufacturing line by introducing of major equipments High-pressure homogenizer, in line homogenizer, 500 to 5 liters vessel brine chillers and hot water system project executed with filtration vessel, HVAC, utilities and Facility modification and qualifications completed
  • Enhancement of power control center: 1600 KVA transformer with 33 KV VCBs and PCC distribution panel installation completed and released for regular usage
  • Enhancement of utilities: 350 TR Trane chiller installation and commissioning in utilities, 2.8 TPH boiler installation with chimneys, 495 CFM Atlas Copco Air compressor with drier
  • Operational excellences: Cost saving projects are Implemented and achieved the targets as per below: Steam condensate recovery system from water system and HVAC to boiler feed water tank, Power factor correction and maintain up to 0.99, Water system chemical consumption Decreasing, Fuel ionizer consumption Boiler by installing fuel catalyst, VFDs installation in Cooling tower FANs, Complete condensate recovery
  • Planning of new facilities, electrical, utilities and supporting in equipment finalization
  • Administer expenditure controls and estimating construction costs
  • Appropriate installations of utilities with supporting documents
  • Documentation of all the area and equipment in utilities, HVAC and clean utilities with documentation
  • Preparation of budgets for opex and capex as per the approved
  • Preparation, monitoring the preventive maintenance policy of the planned equipment and utility
  • Responsible for process of raw utilities, HVAC and clean utilities
  • Knowledge in QMS documents like Change controls, Deviations, Validation etc
  • Planning and supporting in new projects introduction of PFS line facility and powder process line Routine maintenance activities also monitoring
  • Daily operation monitoring in utility, HVAC and water system area with help of executives
  • Completion of maintenance and project activities within the time line
  • Completion of projects with support of vendors and consultants

Engineering Supervisor

Hyderabad International Convention Centre & Novotel
03.2006 - 05.2015
  • Supervision of maintenance of all Equipment
  • Planning of manpower as per requirement
  • Monitoring of daily consumption
  • Preparation of log sheets, schedules for preventive maintenance
  • Forecasting of spare parts, Venders follow-ups

VENENBURG IT PARK (J.E Enterprises)
Hyderabad
08.2004 - 03.2006
  • Programming and software provide by Johnson Control & Siemens India Ltd
  • Operation and maintenance of Screw Chiller with B.M.S
  • Maintaining water cooled chillers of 360 TR-3Nos
  • Air Cooled Screw Chillers of 270 TR-3 Nos
  • Air Cooled Screw Chiller of 180 TR-4 Nos
  • Air Handling Units-150 No

RAMOJI GROUP
Hyderabad
08.1997 - 08.2004
  • Supervising of Erecting of

Education

DIPLAMO - ELECTRICAL&ELECTRONICS ENGINEERING

J.N.T.U
Masab tank

INTERMIDIATE - M.P.C

C.G.T.M JR COLLEGE

Electrical 33 KV Supervisor license -

T,S.S.E.B

Skills

  • Documentation control
  • Team motivation
  • Blueprints and technical manuals
  • HVAC
  • Architecture
  • Environmental awareness

Personal Information

  • Date of Birth: 08/09/74
  • Nationality: Indian
  • Marital Status: Unmarried
  • Religion: Hindu

Timeline

Sr. Manager in Engineering & Projects

AMNEAL Oncology Pvt. Ltd
05.2015 - Current

Engineering Supervisor

Hyderabad International Convention Centre & Novotel
03.2006 - 05.2015

VENENBURG IT PARK (J.E Enterprises)
08.2004 - 03.2006

RAMOJI GROUP
08.1997 - 08.2004

DIPLAMO - ELECTRICAL&ELECTRONICS ENGINEERING

J.N.T.U

INTERMIDIATE - M.P.C

C.G.T.M JR COLLEGE

Electrical 33 KV Supervisor license -

T,S.S.E.B
Bhamidipati B Sitaramam