Summary
Overview
Work History
Education
Skills
DOB
Timeline
Generic

BHANU PRAKASH

Vasundhara, Ghaziabad,UP

Summary

Accomplished Head of Electrical Maintenance at TATA STEEL Sahibabad, with comprehensive 30 + years of experience in electrical automation, DC/AC motor, HT/LT Switchgears, upgradation of obsolete equipments and installations in the steel plant,implementation of the preventive and predictive maintenance program and execution of the appropriate methods and Maintenance practices at the lowest optimum cost. Safety-conscious and committed to working safely.

Overview

31
31
years of professional experience

Work History

Head Electrical Maintenance

TATA STEEL
2005.04 - 2024.06
  • Rich experience in Electrical and Automation, Installation and commission and Maintenance of Plant equipment.
  • Experience in Planning and execution of projects for Plant setup, Plant Expansion, Modernization and Upgradation of plant equipment.
  • Wide experience and understanding of Process & Electrical and Automation and maintenance of following equipments :

- 6 HI cold rolling mill of Hitachi, Japan

- 6 HI & 4 HI cold rolling Mills of CMI

- 4 Hi skin pass cum Tension Leveling Line of Clecim France

- Electro cleaning Line of Flat Products Ltd

- Pickling Lines

- HR slitter line

- CR slitter lines and CTL lines

- Acid regeneration Plant

- H& T lines (SECO WARWICK)

- 220 KV substation equipment’s

- 2 X 12 MW DG power Plant

- Plant Utilities like Air compressors, RO Plant & Chiller Units.

- EOT Cranes

- HT / LT Switchgear

- Thickness gauges (Thermofisher)

- Temperature controllers, Pressure & Level transmitters.

- RTDs, Thermocouple and Load cells.

  • Wide experience in Problem solving and complete Overhauling process of enormous size AC/DC Motors ranging up to 2 X 2500 K
  • Rich Experience in Finalizing the technical specification, Electrical drawings, schematic and scope of work and upgradation of obsolete equipment’s of Plant.
  • Extensive experience and exposure in trouble shooting, Installation and commissioning of various PLC automation systems like Siemens (S5 & S7), ABB PLC, Rockwell PLC, and Hitachi PLC –R900 series.
  • Wide experience and exposure in trouble shooting, Installation & Commissioning of AC / DC Drive system :

- SIEMENS 6 RA 80 DC Drives & Sinamics S120 & G120 AC Drives

- ABB DCS 880 DC Drives and ACS 880 AC Drives

- ROCKWELL Powerflex 70 DC DRIVE AND Powerflex 755 AC Drives

Recent Task Completed

TATA Steel
  • Upgradation of automation system and managed the activities from the conceptualization stage to the execution involving in finalization of technical specification, scheduling, Progress monitoring, Commissioning and site management and planning for the following equipment’s:

- 4 Hi Skin pass cum Tension Leveling Line upgradation.

- CR slitter -1 &2 upgradation

- Pickling line upgradation

- Electro cleaning line upgradation

- Thickness gauge upgradation.

- Stressometer system upgradation

- Hitachi 6 Hi cold rolling mill PLC Automation Upgradation

- Edge guide system upgradation at 4 Hi skin pass and ECL lines

  • Root cause analysis and problem solving of major failure in Hitachi Mill DC motors.

- Resolved the heavy sparking problem at commutator in 2500 KW DC Mill motor.

- Resolved the Repeated flashover at equalizer of 2 x !250 KW RTR DC Motor

- Successful replacement the 2 x 1250 KW ROTOR of LTR side DC Motor of Hitachi Mill.

  • Successful completion of DC motor overhauling work of Hitachi Mill from conceptualization stage to the execution at site in the month of March 2024 involving in finalization of activities and work schedule and finalization of procedures, methods and testing, site management for oven & equipment’s:

- 600 KW DC motor for pay off Reel.

- 2 X 2500 KW DC Motors for Mill

- 2 X 1250 KW (2 Nos) DC Motors RTR/ LTR

- 2 x 15 KW DC motor for Shape meter

  • Supervision and monitoring the following procedures, methods, and testing:

- Dismantling and marking the motor parts

- Lifting procedures for Motor Parts

- Steam washing method and procedures for Motor parts.

- Drying process and testing of motor parts

- Maintenance of Commutator – Machining, Mica under cut and chamfering

- Repair and banding process of equalizer DC Motor Rotors

Manager

National Steel And Agro Industries Limited, Ruchi Group
2003.06 - 2005.03

Deputy Manager

Bhushan Steel & Strips Ltd
1995.04 - 2003.06

Production Engineer

Victor Cable Industries Ltd
1993.03 - 1995.03

Education

Bachelor of Engineering - Electrical Engineering

Aligarh Muslim University
Aligarh, India
1992

Skills

  • Equipment Purchasing Specifications
  • Maintenance Planning
  • Power Distribution Systems
  • Budget Planning
  • Load Calculations
  • Energy management
  • Technical Drawings and Schematics
  • OSHA Compliance
  • Electrical Systems/Component Integration
  • Industrial Automation
  • Switchgear Maintenance
  • AC/ DC Motor Maintenance
  • Transformer Maintenance
  • Variable Frequency Drives
  • Electrical Troubleshooting
  • Electrical Safety

DOB

01/06/1964

Timeline

Head Electrical Maintenance

TATA STEEL
2005.04 - 2024.06

Manager

National Steel And Agro Industries Limited, Ruchi Group
2003.06 - 2005.03

Deputy Manager

Bhushan Steel & Strips Ltd
1995.04 - 2003.06

Production Engineer

Victor Cable Industries Ltd
1993.03 - 1995.03

Recent Task Completed

TATA Steel

Bachelor of Engineering - Electrical Engineering

Aligarh Muslim University
BHANU PRAKASH