Accomplished executive with 25+ years of experience and recipient of the esteemed 'Distinguished Leader' award. Dedicated to leveraging leadership expertise to drive organizational excellence and foster growth
Coordinating & Handling CAPEX projects, some of them are
· AFR solid waste system installation to increase TSR
· Cooler-1 Upgradation to reduce Heat consumption
· Coal mill-1 Modification to reduce power and output optimization
· GCT duct modification to reduce pressure drop
· Coal dozing system replacement from FK Pump to Coriolis feeder to optimization of preheater outlet temperature.
Successfully managed Pre and Post clinkerisation operations amidst the challenging backdrop of the "COVID pandemic", ensuring uninterrupted business operations through strategic utilization of internal resources. Displayed adept leadership in navigating critical phases, safeguarding continuity, and optimizing resource allocation to mitigate disruptions effectively.
Presently handling the responsibility as DH- Mech-1 parallel to DH- Project &Technical service
Pre-clinkerisation (Line-III), cooling system studied and installed energy efficient pump – saving @ 20 KWH
Cement mill 2&3 compressed air system optimized and reduced compressed air power by 0.55 kWh/Mt of cement.
VRM Roller assembly.
Roller press roller assembly.
Kiln and cement mill main gear box overhauling.
Cooler Hydraulic cylinder overhauling.
Roller and table liner Metallurgy change (Sinter cast liner installed)
Rawmill fan replacement.
Mill inlet feeder capacity upgradation.
Separator bottom cone valve modification.
Rawmill feeding circuit upgradation.
Rawmill cyclone swirl type dip tube installation.
Belt bucket elevator upgradation (Silo feed and kiln feed).
Operation and maintenance of VRM – ATOX mill and LSSR (Lime stone stacker and reclaimer)
Executed major jobs for upgradation of plant capacity from 6500 TPD to 8100TPD.
Operation and Maintenance of Pre-clinkerisation area
MS-Office98, XP-2007
Job Title : Head of Department - Mechanical-1
Designation : General Manager
ABG Hire Date : 10/25/1996 (MM/DD/YY)
Department : Mechanical-1
Job Band :
Job Band Effective from :
Recipient of the Prestigious "Distinguished Leader" award at the ABG Chairman Individual Awards, hosted in Atlanta, USA
Temple committee Colony
Improvement committee
S&R Club committee