

Dedicated hard-working individual with proven organizational, time management and interpersonal skills. Works well in teams or individually to achieve goals and objectives. Well versed in working with Databases like PDB, VDB, VDBc PDBc , and SDB. Managing all Engineering’s and vendor documents as per project requirements.
IM Projects: Shell Sky shell
Working on Project Data and Information Handover Specifications which include
· Document to Tag Register with respect to
· Equipment
· Instrument and Automation
· Telecom
· Piping
· Electrical Cables
· Civil and Structural
· Pipeline
· Tag Relationship
Developed Tool RPA for Extraction Tags
IM Projects: NRL Numaligarh Refinery Limited
Working on Project Data and Information Handover Specifications which include
· Document to Tag Register with respect to
· Equipment
· Instrument and Automation
· Telecom
· Piping
· Electrical Cables
· Civil and Structural
· Pipeline
· Tag Relationship
Developed Tool RPA for Extraction Tags
IM Projects: Prelude FLNG - EMOC
· Transfer of documents from Perth server to our local Project server
· Allocation of each document with regard to SPI/Non-Tool/Drawings
· RLMU to BLMU Incorporated by Signing Checking posting the documents.
· Maintaining monthly hours and document tracking register for invoice raising
IM Projects: Prelude FLNG
· Maintaining Master Asset Register (MAR).
· Updating Furanes by
· 3D Model Reports
· Cable List
· Electrical Equipment List
· Heat Tracing,
· Instrument Index
· Coordinating with counterpart in Rome and Issuing MAR without errors.
IM Projects: NFS Qatar – P&ID Documents
· NFE documents were replicated to issue NFS Documents.
· Updated the Title blocks, Document Number using Bluebeam.
· Done Simple Markups that are editable in Bluebeam
IM Projects: Prelude FLNG
· Tag Register
· Equipment Register, Master Tag Number Register
· Doc-to-Tag
· Extract document from Lotus Notes Database
· Extract document with Tag from Sombrero
· Merging with Summa tools
· Index File Create
· Separate File based on Database
· Check tag number each document
· Doc to Tag will be issued on a Monthly basis.
· Each month, COMPANY will provide a feed back on Doc to Tag.
· A formal review will be organized on a bi-monthly basis to agrée on Schedule to solve raised issues/comments.
Client : ENI
Project Type : Onshore –offshore
ENGINEERING DATA BASE (PDB) / PDBc
· Managed the project email Inbox to ensure that internal requests are handled in a timely manner.
· Quality checking, registering, classifying, managing, tracking, and transmitting electronic engineering and vendor/contractor deliverables and other project-controlled documents as required by the project.
· Ensuring all the documents issued in MR are transferred to EPC tool.
· Preparation of Transmittal Notes
· Ensuring all the documents are uploaded in the Client Portal EDAM according to the specific transmittal Number.
· Preparation of weekly Reports to the Project Team.
· Record of Client Comments.
· Answering to the query that are elevated by the project engineering team in regard to the documentations
· Providing Access creation and Deletion for all Databases and maintaining records.
PDB PARTNERS – JGC and SHI
· Downloading the Partners documents from FTP Server.
· Checking and importing the documents in PDB Partners.
Preparation of Transmittal Notes
VENDOR DATA BASE (VDB/SDB)
· Quality Checking and Recording of documents from VDB Mailbox to VDB and SDB Mailbox to SDB
· Preparation of Transmittal Notes and Notifications (For review, Code 1, 2 and 3)
· Preparation of Reports to Vendors Individually on weekly basis
Projects: - JSC YAMAL LNG Project
Client : JSC Yamal
Project Type : Onshore –offshore
Role : Document Controller from Dec ‘15 to Aug ’ 17
· Document Control Activities:
· Quality Checking, recording of PDB Documents before sent for Translation (Russian)
· Classifying the drawing documents and the other documents transmitting them to SPOC and TRADEST accordingly.
· After Translation, checking, Validating and transmitting the same in PDB Directorate.
· Ensuring the documents are uploaded in FTP Server for the Client for final recording of the documents.
· Final Documentation Process – Technical Passport.
· Checking of MDRB