To work in a dynamic environment with organization that would help me to utilize my potential to the fullest and to add consistent value towards the growth of my organization through my knowledge and skills.
Overview
14
14
years of professional experience
1
1
Certification
Work History
Section Head (Mines)
Musandam Rock LLC
12.2022 - Current
Responsible for All Mining Operation.
Achieved Target production with required Quality.
Minimize Operation cost.
Minimize Blasting cost .
Improve productivity of Equipments.
Improved mine safety by implementing advanced monitoring systems and conducting regular risk assessments.
Increased ore extraction efficiency with the development of innovative mining techniques and equipment optimization.
Reduced operational costs for the mining company through waste minimization and resource allocation strategies.
Enhanced mine productivity, optimizing drill patterns and blasting methods for maximum ore recovery.
Collaborated with geologists to accurately map mineral deposits, ensuring optimal exploration efforts.
Conducted training programs for staff members on safety protocols and proper use of equipment, fostering a culture of workplace safety at all times.
Maximized resource utilization by planning effective transport routes for extracted materials from the mine site to processing plants or other destinations.
Contributed to the development of long-term strategic plans for the mining company, including project proposals aimed at increasing profitability and sustainability.
Organized safe, cost-effective completion methods of projects to exceed stakeholder and company expectations.
Mining Engineer
SCPL
02.2022 - 12.2022
Responsible for fullfill the required Quantity with desired quality Rock in Rock Revert Ment (Shore protection) project APM Terminal Port Pipavav.
Plan & Exquisite the Blasting for armour.
Minimize the Blasting cost.
Complete the project timely with proper planning.
Arrange to improve skill &work safety awareness program.
Quarry Engineer
RINA India Pvt. ltd.
02.2019 - 01.2022
Skilled at working independently and collaboratively in a team environment.
Self-motivated, with a strong sense of personal responsibility.
Proven ability to learn quickly and adapt to new situations.
Worked well in a team setting, providing support and guidance.
Asst. Manager Mines
Ultratech Cement Limited
12.2015 - 04.2018
Achive target production with required quality.
Manage manpower.
Planned & Execute Drilling ,Blasting, Development of Mines, Hauling, Haul road & Overburden Dump management.
Implemented staff training programs, enhancing product knowledge and improving customer service skills.
Boosted employee morale by recognizing outstanding performance and celebrating team accomplishments.
Increased fragmentation to achive maximum productivity of equipments.
Mining Engineer
Jitendra Pandey Dolomite Mine
09.2013 - 12.2015
Reduced operational costs for the mining company through waste minimization and resource allocation strategies.
Conducted training programs for staff members on safety protocols and proper use of equipment, fostering a culture of workplace safety at all times.
Manage, Drilling, Blasting, Transportation, Development of mines ,Haul road ,waste Dump