Bhuwal Chandra Patel

Bhuwal Chandra Patel

Mechanical Engineer
Bhandup west

Summary

This is Bhuwachandra Patel, a mechanical Engineer having 23 years of experience in the field of Cost Estimation, Engineering, Procurement, Project Execution & Project Management in various industrial fields like metallurgical plant (Alumina refinery) petroleum refinery (DCU- heater package & strategic crude oil storage plant), chemical plants (sulfuric acid, surfactants-sulfonation & toluene di-isocyanate-TDI), and petrochemical plant (HDPE) and environment payback projects with combustion technology. I would like to work in an organization where I can utilize my knowledge and experience in the development of the organization, as well as I have better exposure to new challenges and opportunities to prove my skill and talent which can help in better prospects of my career.

Overview

23
23
years of professional experience
2
2
Languages

Work History

Country Head & Director

5. M/s. Eurochem India Pvt Ltd.
01.2017 - Current
  • Overall responsibility to lead the team department related as (Business Development, Estimation, Engineering, Project Management, Procurement, Construction, Commissioning & O&M) for delivery of Combustion Technology like No-Nox Systems Burners & Flares Incinerator packages, Thermo Oxidation systems, Product Recovery, Flue Gas Treatment System, Waste to Energy for industrial waste, liquids & sludges and medical waste.
  • Cross functional team leadership for delivery of Technology package deliverable like Burner Static & Rotary Equipment, Technological Structure & Platforms Packages, Piping & Ducting Packages, Instrumentation, Electrical equipment like Motors and Variable Frequency Drives Automation like PLCs etc.
  • Lead a team of engineers from Process, Mechanical, Piping, Civil, Electrical, Instrumentation & Automation engineers for completion of engineering deliverable for the technology packages.
  • Take active lead in Basic and Detailed Engineering, Cost Estimation & Budgeting & Control, Project Scheduling & Monitoring, Procurement Support & Expediting, Fabrication, Construction, Pre-Commissioning and Commissioning.
  • Client as well as the vendor management to ensure that the projects completed as per the schedule quality and technical standards with good profit of the company.
  • Maintaining cash flows, budgeting manpower allocation and forecasting in cloud of each of the project in smooth year.
  • Take active role in resolution meetings with Client & Consultants, HAZOP Study & its Implementation, Safety Integrity Level Study & its implementation with the technology package.
  • Management assessment and implementation of archangorde in contract.
  • Coordination with Third Party Inspection Agencies appointed by the Client for Stage wise & final quality inspection of all the deliverables as per the Inspection Test Plans.
  • Apart from the above regular role as participant in the destination process and site survey team for pre-bid activities.
  • - Detail Electrical & CO Incinerator & Flue Gas Treatment plant at Esfahan Refinery, Iran
  • - Detail Electrical & Instrumentation Engineering for Air Heaters at Esfahan Refinery, Iran
  • - Detail Engineering for Mobru Rotary Kiln Incinerator at Energy from Waste plant in Poland
  • 5.6 : Heavy Hydro Carbon Liquid Thermal Oxidizer (Incinerator) at NKNKh Nizhnekamsk (Sibu Group) Russian Federation
  • Client: NKNKh Nizhnekamsk (Elprommasl LLC Russia).
  • PMC: NIPIGAS Russia.
  • Site Location at NKNKh Nizhnekamsk (Sibu Group) Russian Federation
  • Job Details Burners, Incinerator Chambers, Cafans, Air cooler, candle filter, ash conveyer, lime dosing ID Fan, stack, CEMS, PCC, MCC VFD & PLC Panel, Interconnecting piping, ducting, structure and platform, cable trays, cables, Refractory lining & Painting
  • 5.5: Cleancd Centralized Medical waste treatment Facility capacity upgrade, Al Ain Abu Dhabi
  • Client: Cleancd Waste Treatment LLC
  • PMC: Tadweer Center of Waste Management, Abu Dhabi.
  • Site Location: Al Ain, Abu Dhabi
  • Job Details: Supply of Burners, Modification and replacement Project for Centralized medical waste treatment plant that has Ram Feeding system, Bin Lifter, Rotary Kiln Incinerator, De-Ashing Chamber, Waste submerged conveyer, evaporative coolers, Heat Exchanger, Reactor, Activated Carbon Dosing system, lime dosing system, Candle Filter, CA & ID Fans, stack, CEMS, connected ducting, piping, MCC, VFD, PLC Panels, Field Instruments, cabling and tubing etc. Refractory lining, painting & Insulation.
  • 5.4: Cleancd Centralized Medical and Industrial waste treatment Facility, Al Dhafra Abu Dhabi
  • Client: Cleancd Waste Treatment LLC
  • PMC: Tadweer Center of Waste Management, Abu Dhabi.
  • Location: HO Navi Mumbai (but also gone at site due to Covid HO was closed site to guide the team for construction, pre-commissioning & commissioning & operation of 3 months.
  • Site Location: Al Dhafra, Abu Dhabi
  • Job Details: LSTK Project for Centralized medical and industrial waste (non hazardous sludge form) treatment that has Ram Feeding system, Bin Lifter, sludge feeding system, Rotary Kiln Incinerator, De-Ashing Chamber, Waste submerged conveyer, quench tower system, Reactor, Urea Dosing skid, Activated Carbon Dosing system, lime dosing system, Candle Filter, CA & ID Fans, stack, CEMS, connected ducting, piping, MCC, VFD, PLC Panels, Field Instruments, cabling and tubing etc. Refractory lining, Painting & Insulation.
  • 5.3: Enhance Reactive Thermal Oxidizer (ERTO) at ONGC Uran
  • Client: ONGC Uran Plant
  • PMC: TUV SUD India
  • Location: HO Navi Mumbai
  • Site Location: ONGC Plant Uran, Navi Mumbai
  • Job Details: LSTK Project for Enhance Reactive Thermal Oxidizer (ERTO) including Technology includes complete civil work, Burner with BMS, thermal oxidizer HRU (Heat Recovery unit), Quench tower system, Scrubber, Caustic storage tanks, ID Fan, Stack, CEMS, VFD & PLC Panel, Field Instruments, Interconnecting piping and ducting, cable trays and cabling for instruments and electrical, refractory lining, painting and insulation that has 3 years O&M Services as well.
  • 5.2: Tail Gas Incinerator SRU Plant
  • Client: Numaligarh Refinery Plant at Numaligarh
  • EPMC: Engineers India Ltd Delhi
  • Location: HO Navi Mumbai
  • Site Location: DHDT Plant and Numaligarh Refinery
  • Job Details: Designing procurement supply Pertaining Mechanical / Piping / Electrical / Instrumentation & painting work, all the activities include pre-commissioning & commissioning.
  • Job Details: Burner, Incinerator chamber, waste heat boiler, CA Fan & ID Fan, stack and CEMS. Interconnecting piping, ducting, refractory painting and insulation field instruments, cable trays and cabling, site supervision pre-commissioning and commissioning assistance.
  • 5.1: Incinerator Plant at Reliance Sibu Project at Reliance Jamnagar 3
  • Client: Reliance Sibu Project Jamnagar 3
  • EPMC: Tecnimont CB
  • Location: HO Navi Mumbai
  • Site Location: Butyl Rubber Plant at Reliance Jamnagar 3.
  • Job Details: Designing procurement supply Pertaining Mechanical / Piping / Electrical / Instrumentation & painting work, all the activities include pre-commissioning & commissioning.
  • Job Responsibility: Burners, Incinerator chamber (Primary horizontal & Secondary vertical) emergency stack, Wet Ash Conveyer, Quench Tower system, wet scrubber CA Fan & ID Fan, stack and CEMS. Interconnecting piping (Metal lining and FRP), Refractory lining, painting & insulation, ducting field instruments, cable trays and cabling, site supervision pre-commissioning and decommissioning assistance.

Assistant General Manager - Construction (HOD)

4. M/s. Nuber Engineering Ltd.
06.2016 - 05.2017
  • 4.3: Sulfolane & Sulphuric Acid Plant
  • Client: ADDAR Chemicals
  • PMC: Simon India Ltd.
  • Location: In HO-Noida.
  • Site Location: Al Jubail, Saudi Arabia.
  • Job Detail: LSTK Project pertaining Civil / Mechanical / Piping / Electrical / Instrumentation & painting work, all the activities include pre-commissioning & commissioning.
  • Project Value: 36 Million USD.
  • Job Responsibility: Preparation of overall as well as micro schedule of the project & resource planning, Preparation of Budget for project expenses, Coordination with client, contractors, vendors & suppliers, Monitoring & controlling the project’s progress & cost, Billing forecast and cash flow planning & monitoring.
  • 4.2 Project Flare System EPC
  • Client: ONGC Ltd.
  • Located: Offsite (HO)
  • Site Location: Cauvery Assets, Karaikal, Tamil Nadu.
  • Job Detail: LSTK Project pertaining Civil / Mechanical / Piping / Electrical / Instrumentation & painting work, all the activities include pre-commissioning & commissioning.
  • Job Responsibility: Preparation of overall as well as micro schedule of the project & resource planning, Preparation of Budget for project expenses, Coordination with client, contractors, vendors & suppliers, Monitoring & controlling the project’s progress & cost, Billing forecast and cash flow monitoring.
  • 4.1 Project: Sulphur Bentonite
  • Client: NFL
  • Located: Offsite (HO)
  • Site Location: Panipat, Haryana.
  • PMC: PDIL
  • Job Detail: LSTK Project pertaining Civil / Mechanical / Piping / Electrical / Instrumentation & painting work, all the activities include pre-commissioning & commissioning.
  • Job Responsibility: Preparation of overall as well as micro schedule of the project & resource planning, Preparation of Budget for project expenses, Coordination with client, contractors, vendors & suppliers, Monitoring & controlling the project’s progress & cost, Billing forecast and cash flow monitoring.
  • Note: Apart from construction related activity I am also involved in cost estimation of project for construction part.

Project Manager

3- M/s. Onshore Construction Company Pvt Ltd.
05.2012 - 05.2016
  • Projects Handled (Offsite (HO) / Onsite)
  • 3.6 Project Ammonia & Urea Plant (Energy Saving System)
  • Client: IFFCO Ltd.
  • Site location Phulpur-Allahabad, U.P.
  • PMC PDIL Ltd.
  • Duration November 2015 to May 2016
  • Job Responsibility: Monitoring & controlling the project’s progress & cost.
  • Job Detail: 225 Nos. of Static & Rotary Equipment installation 3000MT (Pre-Shutdown and Shutdown) 14000DD of AG piping (Pre-Shutdown and Shutdown (CS, SS & Alloy) including Fabrication, Erection, testing Painting & Pre-Commissioning), project & resources planning, Prepare budget for project expenses.
  • 3.5 Project Agro Chemical Plant.
  • Client: PI Industries Ltd.
  • Site Location SEZ-4, Village Sarod, Jambusar, Bharuch Gujarat.
  • Process Technology Mott Macdonald Ltd.
  • Duration October 2014 to December 2015
  • Job Detail: 2500MT Structure steel, detailing engineering, Procurement, Fabrication, Erection, Erection of 3000MT (740 Nos. of Static & Rotary Equipment installation, 1855MT, 180000DD of AG piping (CS, SS & Alloy) including Fabrication, Erection, testing & Pre-Commissioning).
  • 3.4 Project: 1200TPA Air Separation Unit.
  • Client: Linde India Ltd. (former) BOC Ltd.)
  • Site Location NMD Nagarnar Jagdalpur, Dantwada, Chhattisgarh.
  • Process Technology Linde India Ltd.
  • Duration October 2014 to August 2015
  • Job Detail: 2100MT (200 Nos. of Static & Rotary Equipment installation, 910MT, 4 Nos. of Double Wall Tank Fabrication - Erection, testing & painting, 120000DD UG & AG piping including Aluminum, Fabrication, Erection, testing, Painting, Wrapping, Coating & Pre-Commissioning), 320MT Cold Box, Assembly, Erection & testing.
  • 3.3 Project: 5.3 Million Tonnes Crude Oil Storage Plant.
  • Client: Linde Eng. India Pvt. Ltd.
  • Owner: ISPRL-India Strategic Petroleum Reserve Ltd.
  • Process Technology: Linde Engineering India Pvt. Ltd.
  • Duration August 2013 to December 2014.
  • Job Detail: 1100MT (120 Nos. of Static & Rotary Equipment installation, 320MT (8 No’s) Tank Fabrication, Erection testing & painting, 205000DD-510000M of UG & AG piping, Fabrication, Erection, testing TSAC, Painting, Wrapping, Coating & Pre-Commissioning)
  • 3.2 Project DHDT Plant of Capacity 840KTPA
  • Client: Samsung Engineering Company Ltd.
  • Owner: ONGC Petro Addition Ltd.
  • Process Technology: Samsung Engineering Company Ltd.
  • Duration May 2012 to September 2013.
  • Job Detail: 262000DD AG piping (Fabrication / Erection / Testing & Pre-Commissioning), Preparation of overall as well as micro schedule of the project & resource planning, Coordination with client / contractors / vendors & suppliers, Monitoring & controlling the project’s progress & cost.
  • 3.1 Project: 50000TPD PTY DI Plant
  • Client: Gujarat Narmada Valley Fertilize Ltd
  • Process Technology: B Chematt Eng.
  • Duration May 2012 to August 2013.
  • Job Detail: 25000MT (755 Nos. of Static & Rotary Equipment installation & 271000DD AG piping, Fabrication, Erection, Testing & Pre-Commissioning) Preparation of overall as well as micro schedule of the project & resources planning, Coordination with client / contractor / vendors & suppliers, Monitoring & controlling the project’s progress & cost.

Sr. Project Engineer

2. M/s. Chemitho Engineers Pvt Ltd
02.2009 - 04.2012
  • Projects Handled
  • 2.4 Project Methy Este Estsulfonation Plant.
  • Client: Wilma Nabatti Indonesia
  • Process Technology: Chemitho Corporation Inc. USA
  • Duration August 2011 to April 2012.
  • Job Responsibility: Preparation of overall as well as micro schedule of the project & resource planning, Preparation of Budget for project expenses, Checking of drawings preparation of BOQ, Coordination with client, contractors, vendors & suppliers, Monitoring & controlling the project’s progress & cost. Compilation of documents.
  • 2.3 Project Dual Flue Gas Conditioning Plant (DFGC).
  • Client: Landcraft Tech Ltd.
  • Process Technology: Chemitho Corporation Inc. USA
  • Site location Korba, Chhattisgarh.
  • Duration August 2010 to July 2011.
  • Job Responsibility: Preparation of overall as well as micro schedule of the project & resource planning, Preparation of Budget for project expenses, Checking of drawings preparation of BOQ, Coordination with client, contractors, vendors & suppliers, Monitoring & controlling the project’s progress & cost. Compilation of documents & Commissioning of the plant.
  • 2.2 Project Dual Flue Gas Conditioning Plant (DFGC).
  • Client: Chhattisgarh Electric Board.
  • Process Technology: Chemitho Corporation Inc. USA
  • Duration February 2010 to July 2010.
  • Job Responsibility: Preparation of overall as well as micro schedule of the project & resource planning, Preparation of Budget for project expenses, Checking of drawings preparation of BOQ, Coordination with client, contractors, vendors & suppliers, Monitoring & controlling the project’s progress & cost. Compilation of documents.
  • 2.1 Project Sulfonation Plant (AOS and LABS)
  • Client: NIRMA Ltd.
  • Site Location NIRMA Ltd. Mandal Gujarat
  • Process Technology: Chemitho Corporation Inc. USA
  • Duration 2 February 2009 to January 2010.
  • Job Responsibility: Preparation of overall as well as micro schedule of the project & resource planning, Preparation of Budget for project expenses, Checking of drawings preparation of BOQ, Coordination with client, contractors, vendors & suppliers, Monitoring & controlling the project’s progress & cost. Compilation of documents & Commissioning of the plant.

Sr. Project Engineer

1 M/s. Furnace Fabrica (India) Ltd.
08.2002 - 01.2009
  • Projects Handled
  • 1.5 Project DCU Heate Package.
  • Client: Bhara Dmar Refinery Ltd.
  • Site Location Bhara Dmar Refinery Ltd. Bina M.P.
  • PMC: Engineers India Ltd.
  • Duration March 2008 to January 2009.
  • Job Responsibility: Overall as well as micro planning of resources for fabrication & erection of heater panels & coils. Monitoring & controlling the progress of fabrication and erection of panels & coils. Coordination with client and contractors Participation in progress review meeting with client and PMC.
  • 1.4 Project 1850TPD Sulphuric Acid Plant.
  • Client: Conkola Copper Mines PLC Zambia.
  • Location Offsite (HO)
  • Duration April 2007 to February 2008.
  • Job Responsibility: Coordination with vendors, internal (Engineering, Purchase, finance & works), Preparation of BOQ, monitoring project progress & Compilation of documentation.
  • 1.3 Project 1350TPD Alumina Refinery Plant (Evaporation & Calcination)
  • Client: Hindalco Industries Ltd. Muri, Ranchi, Jharkhand.
  • Site Location Hindalco Industries Ltd Muri, Ranchi, Jharkhand.
  • Process Licensor GEAMessdor Evaporation & Outokumpu Technology, Germany.
  • PMC Engineers India Ltd.
  • Duration April 2006 to March 2007
  • Job Responsibility: Worked as an in-charge for Evaporation Plant responsible for micro planning and execution of the fabrication & erection of piping and structural hydro testing of equipment & piping. Taking part in progress review meetings with client process licensor and PMC and reporting to RCM. Coordination for Calcination plant.
  • 1.2 Project 1200TPD Sulphuric Acid Plant.
  • Client: Hindustan Zinc Ltd. Chanderiya, Chittorgarh, Rajasthan.
  • Site Location Hindustan Zinc Ltd. Chanderiya, Chittorgarh, Rajasthan.
  • Process Licensor Outokumpu Technology, Germany.
  • PMC: UHDE India Ltd.
  • Duration August 2004 to March 2005.
  • Job Responsibility: Working as part of execution team, responsible for the fabrication, Erection of equipment’s and structural, worked as well as micro planning of activities Taking part in progress review meetings.
  • 1.1 Production Division from August 2002 to July 2004, Worked as a Production Engineer in the works of Furnace Fabrica (I) Ltd. Mumbai in heavy equipment manufacturing related the third party inspection of TUV, IBR & WIS.

Education

B.E. - Mechanical Eng.

Dr. Bhim Rao Ambedkar University
Agra
01.2002

Skills

Conversant in MS Office & AutoCAD 2006

Disclaimer

Information furnished above is true as best of my knowledge & I will be solely responsible for above. With Thanks Applicant - Bhuwachandra Patel

Personal Profile

  • Name: Bhuwachandra Patel
  • Date of Birth: 01 May 1977
  • Gender / Marital Status: Male / Married have two Kids.
  • Father’s Name: Late Shri Dukhara Patel
  • Nationality & Language Known: Indian / Hindi and English
  • Permanent Address:
  • Village: Kadamter, Post Office: Gopalapur
  • District: Jaunpur, State: Uttar Pradesh, PIN- 222137
  • Present Address:
  • Bhuwachandra Patel, Flat No- B-402, Next to Tami Church, Goan Devi Road, Bhandup west, Mumbai-400078
  • Contact No.- 09324303200
  • E-Mail bharat75us@yahoo.com
  • Current CTC: 12.5 Cr+
  • Expected CTC: Can be discussed.

Accomplishments

In the begining of my career I have worked for Hindalco Muri plant for Evaporation & Calcination Plant.

The geopolitical situtions were very critical. Project was already lagging in terms of progress by huge percentage. I had taken the lead and worked constantly between 14-18 hrs per day with team for 6 months+ and finished the project within time frame and our company was awarded as best contractor.

Affiliations

GLA University

Additional Information

I use to give technical advice to five company's in which two belongs to pharmaceutical equipment manufacturing, one small scale construction company and one medium scale EPC company and one control panels (Electrical & Instrumentation) manufacturer.

I am also in the board member of my previous company's and in its joint venture.

Software

MS-Office, Auto Cad 2D, MS Project

Interests

Social Services

Career Counceslling

Timeline

Country Head & Director

5. M/s. Eurochem India Pvt Ltd.
01.2017 - Current

Assistant General Manager - Construction (HOD)

4. M/s. Nuber Engineering Ltd.
06.2016 - 05.2017

Project Manager

3- M/s. Onshore Construction Company Pvt Ltd.
05.2012 - 05.2016

Sr. Project Engineer

2. M/s. Chemitho Engineers Pvt Ltd
02.2009 - 04.2012

Sr. Project Engineer

1 M/s. Furnace Fabrica (India) Ltd.
08.2002 - 01.2009

B.E. - Mechanical Eng.

Dr. Bhim Rao Ambedkar University
Bhuwal Chandra PatelMechanical Engineer