Summary
Overview
Work History
Education
Skills
Software
Timeline
Generic
Bijin  P Thomas

Bijin P Thomas

Quantity Surveyor
Pathanamthitta

Summary

Over 8 years of experience in pre and post construction projects in Oil & Gas E&I projects, MEP and Civil Projects including UG and Earth works. Good experience in preparation of project cost and quantity estimates, monthly invoices and project reports. Ambitious student seeks opportunity to build on quantity-surveying understanding in commercial, industrial and residential construction. Methodical and meticulous for accurate, reliable support across project planning and delivery.

Overview

9
9
years of professional experience
3
3
Languages

Work History

Quantity Surveyor

The Company, IMCO Engineering and Construction Company
Ahmadi
08.2018 - 09.2023
  • Prepare estimates of probable costs of materials, labor and equipment for construction projects based on contract bids, quotations, schematic drawings and specifications
  • Advise on tendering procedures, examine and analyze tenders, recommend tender awards and conduct negotiations
  • Establish and maintain tendering process and set up cost monitoring and reporting systems and procedures
  • Prepare cost and expenditure statements and forecasts at regular intervals for the duration of a project
  • Prepare and maintain a directory of suppliers, contractors and subcontractors
  • Liaise, consult and communicate with engineers, architects, owners, contractors and subcontractors, and prepare economic feasibility studies on changes and adjustments to cost estimates
  • Manage and co-ordinate construction projects and prepares construction progress schedules.
  • Complied to all main contract and subcontract processes.
  • Assessed applications, valuations and cost reconciliations and drafted reports with findings.
  • Collaborated with internal teams to verify project viability and improve cost-effectiveness.
  • Attended development, pre-start and subcontract meetings.
  • Managed client relationships and requirements at contractual level.
  • Produced and presented final cost plans and procurement reports.
  • Measured, certified and approved sub-contractor interim valuations.
  • Coordinated with subcontractors to obtain quotes for specialised services.
  • Prepared detailed quantity surveys and cost breakdowns for client presentations.
  • Tracked and monitored project milestones and budgets to prepare progress reports.
  • Liaised with clients and key stakeholders to negotiate mutually beneficial projects with optimal outcomes.
  • Determined project feasibility by estimating quantities and costs of materials.

Instrument Charge Hand

IMCO Engineering and Construction Company
Ahmadi
12.2014 - 07.2018
    • Consult manufacturer's manuals, circuit diagrams and blueprints to determine tests and maintenance procedures for instruments used for measuring and controlling flow, level, pressure, temperature, chemical composition and other variables in manufacturing and processing
    • Inspect and test operation of instruments and systems to diagnose faults using pneumatic, electrical and electronic testing devices and precision measuring instruments
    • Repair and adjust system components, such as sensors, transmitters and programmable logic controllers, or remove and replace defective parts
    • Calibrate components and instruments according to manufacturers' specifications
    • Install control and measurement instruments on existing and new plant equipment and processes
    • To supervise a team of technically skilled workers in daily site construction activities
    • To chart the daily construction activities and record the daily progress
    • To preplan and arrange materials required for site construction activities
    • Check and Prepare Instrument and Power cables required to install in site
    • Installation of Instrument and Power Distribution Panels and JB's, Underground and above ground cable installations.
    • Tracked employee performance, assessed daily output and implemented corrective actions to close gaps.
    • Observed worker activities to assess safety compliance and identify enforcement gaps.
    • Logged daily activities and notable incidents during production shifts.
    • Supervised activities of workers and enforced safety regulations.
    • Directed work of laborer's and specialist team members to produce quality results.
    • Oversaw Panel assembly work, directing activities from initial set up to final product packaging.
    • Worked closely with management to manage staff levels and allocate resources for production plans.
    • Established and maintained organized working environment for team of 20 to 50.

Education

Bachelor of Science - Electronics Technology

Sree Raghavendra Research Foundation & Professional Skill Development
Bangalore
05.2008 - 06.2011

GED -

Institute of Specialized Engineering And Technology
Kerala
07.2012 - 01.2013

High School Diploma -

United Indian School ( Affiliated To CBSE India)
Kuwait
05.2024 - 03.2024

Skills

    Computer skills include: - MS Office, internet and email

Outstanding communication

Customer focused

Construction management

Cost management

Software

Microsoft Office

Microsoft Power BI

MS Planner

Timeline

High School Diploma -

United Indian School ( Affiliated To CBSE India)
05.2024 - 03.2024

Quantity Surveyor

The Company, IMCO Engineering and Construction Company
08.2018 - 09.2023

Instrument Charge Hand

IMCO Engineering and Construction Company
12.2014 - 07.2018

GED -

Institute of Specialized Engineering And Technology
07.2012 - 01.2013

Bachelor of Science - Electronics Technology

Sree Raghavendra Research Foundation & Professional Skill Development
05.2008 - 06.2011
Bijin P ThomasQuantity Surveyor