To exploit skills and knowledge in establishing a career as an Innovative Civil Engineer and contribute to the company, I work for in all the necessary measures possible.
Project:- Construction of Aero Space Museum at Air Force Station in Palam, New Delhi,
Client:-Military Engineer Services
Cost :- INR 240 Crore
Project:- Construction of Rail Over Bridges (ROBs) at 6 locations (i.e. Manmad-Mudkhed Section at LC-34 Km 80/0-1,LC-122 Km291/9-292/0,LC-99 Km247/1-2,Akola-Purna Section at LC-115 Km 821/6-7,LC-144B Km 872/2-3 and Akola-Purna & Manmad-Mudkhed Section LC-134&176A Km 948/5-6) in Lieu of LC Gates in Maharashtra Area of South Central Railway,Maharashtra.
Client : South Central Railway & PWD Maharashtra.
Contractor: M/S DCS-PV Rao JV.
Cost : INR 243 Crores.
Project :- Setting up Metro Car Depot in Connection with Joka-Esplanade Metro Rail Project at Kolkata Metro, West Bengal.
Client : Rail Vikas Nigam Limited.
Contractor: ISGEC Heavy Engineering Limited.
Cost : INR 363.40 Crores.
Project:- WDFCC Phase II-Design & Construction of Civil,Buildings & Track works for Double line Railway Project for Sachin-Vadodara section (Package CTP-13),Gujarat.
Client:- Dedicated Freight Corridor Corporation of India Ltd.
Cost- INR 2158 Crores.
Project:-
Metro Extension of North-South Corridor Noapara(Ex)-Baranagar-Dakshineswar & Joka-Esplaned Metro Rail Project of Kolkata Metro,West Bengal.
Client : Kolkata Metro Railway.
Contractor: Simplex Infrastructure Ltd
Cost:- INR 319 Crores & 1380 Crores.
Project : Panskura-Kharagpur 3rd line Railway Project, West Bengal,India
Client : Rail Vikas Nigam Limited.
Cost : INR 240 Crores.