A Competent, Dedicated, resourceful and innovative Asst. Manager (MSV) Projects with an outstanding experience of almost 13 years in Projects of Oil & Gas Industries in the field of Unit & Piping System, Tanks and Pressure vessels & Operation. Experience includes: Project Planning, Project Executions, Design Engineering, Detail Engineering, Project commissioning, Project Estimation, Vendor negotiation & selection, Rate Settlement, Budgeting, Client Handling. In-Depth understanding of Project co-ordination, strategic planning, financial planning and monitoring of project execution with master schedule. Strong abilities in creating/ reading/ interpreting engineering drawings(PFD, P & ID, GA, Isometric) with proficiency in designing & developing equipments in conformance to pre-defined technical specification. Effective communicator & negotiator with strong analytical, problem solving and organizational abilities. Excellent marketing and team management skills with grooming and motivating abilities.

Overview

13
13
years of professional experience
2
2
Certifications
1
1
Language

Work History

Asst. Manager Projects

GAIL (INDIA) LIMITED
06.2024 - 02.2026
  • Establishing time span of project execution as per client specification and contract. Putting deadline of each activity for completion of project physically and financially.
  • Preparing Work Schedule, Billing Schedule and monitoring Construction Schedule.
  • Cost estimation for non-SOR job, Rate finalization with PMC and approval from PMC & Client.
  • Monthly Cash-Flow preparation and monitoring.
  • Material Reconciliation for structural and piping job.
  • DPR and Hindrance Register preparation for each day and Overall Progress Report Monitoring.
  • Attending Meeting with Consultant and client and Co-ordination with HO.
  • Project Name: Installation of 02 X 1600MT Mounded Bullets GAIL INDIA LIMITED, VIJAYPUR, M.P
  • Client: GAIL (INDIA) LIMITED
  • PMC: Engineers India Limited
  • Project Value: Rs. 68, 55, 26,000.00

Lead Engineer Project

Hindustan Petroleum Corporation Limited
11.2023 - 06.2024
  • Establishing time span of project execution as per client specification and contract. Putting deadline of each activity for completion of project physically and financially.
  • Preparing Work Schedule, Billing Schedule and monitoring Construction Schedule.
  • Cost estimation for non-SOR job, Rate finalization with PMC and approval from PMC & Client.
  • Monthly Cash-Flow preparation and monitoring.
  • Material Reconciliation for structural and piping job.
  • DPR and Hindrance Register preparation for each day and Overall Progress Report Monitoring.
  • Attending Meeting with Consultant and client and Co-ordination with HO.
  • Project Name: Installation of 03 X 350MT Mounded Bullets HPCL LPG BOTTLING PLANT, VARANASI
  • Client: Hindustan Petroleum Corporation Limited
  • Consultant: Baxcounsel
  • Project Value: Rs. 18, 01, 60,000.00

R.C.M

Hindustan Petroleum Corporation Limited
01.2023 - 11.2023
  • Establishing time span of project execution as per client specification and contract. Putting deadline of each activity for completion of project physically and financially.
  • Preparing Work Schedule, Billing Schedule and monitoring Construction Schedule.
  • Cost estimation for non-SOR job, Rate finalization with PMC and approval from PMC & Client.
  • Monthly Cash-Flow preparation and monitoring.
  • Material Reconciliation for structural and piping job.
  • DPR and Hindrance Register preparation for each day and Overall Progress Report Monitoring.
  • Attending Meeting with Consultant and client and Co-ordination with HO.
  • Project Name: Installation of 03 X 350MT Mounded Bullets HPCL LPG BOTTLING PLANT, PINDWARA
  • Client: Hindustan Petroleum Corporation Limited
  • Consultant: Baxcounsel
  • Project Value: Rs. 15, 01, 69,000.00

R.C.M

Hindustan Petroleum Corporation Limited
01.2022 - 01.2023
  • Establishing time span of project execution as per client specification and contract. Putting deadline of each activity for completion of project physically and financially.
  • Preparing Work Schedule, Billing Schedule and monitoring Construction Schedule.
  • Cost estimation for non-SOR job, Rate finalization with PMC and approval from PMC & Client.
  • Monthly Cash-Flow preparation and monitoring.
  • Material Reconciliation for structural and piping job.
  • DPR and Hindrance Register preparation for each day and Overall Progress Report Monitoring.
  • Attending Meeting with Consultant and client and Co-ordination with HO.
  • Project Name: Installation of 03 X 350MT Mounded Bullets HPCL LPG BOTTLING PLANT, SITERGANJ
  • Client: Hindustan Petroleum Corporation Limited
  • Consultant: Baxcounsel
  • Project Value: Rs. 18, 11, 49,000.00

R.C.M

Hindustan Petroleum Corporation Limited
12.2020 - 01.2022
  • Establishing time span of project execution as per client specification and contract. Putting deadline of each activity for completion of project physically and financially.
  • Preparing Work Schedule, Billing Schedule and monitoring Construction Schedule.
  • Cost estimation for non-SOR job, Rate finalization with PMC and approval from PMC & Client.
  • Monthly Cash-Flow preparation and monitoring.
  • Material Reconciliation for structural and piping job.
  • DPR and Hindrance Register preparation for each day and Overall Progress Report Monitoring.
  • Attending Meeting with Consultant and client and Co-ordination with HO.
  • Project Name: Installation of 03 Nos. Mounded Bullets HPCL LPG BOTTLING PLANT, HAZIRA
  • Client: Hindustan Petroleum Corporation Limited
  • Consultant: IRS
  • Project Value: Rs. 14, 12, 44,000.00

Lead Mechanical Engineer

Ishan Equipments Pvt. Ltd.
04.2019 - 12.2020
  • Establishing time span of project execution as per client specification and contract. Putting deadline of each activity for completion of project physically and financially.
  • To take all the responsibility of Pre-Commissioning & Commissioning of Hydro-carbon Product and Handing over to the operation.
  • From p&id can make procedure & planning for commissioning with all document work like Rule-33, Rule-18, PESO and OISD guide line and certification work.
  • Entire systems (PLC) as a DCS operate the plant as per PFD & P&ID
  • Any type of valve & site instrument maintenance like ROV, MOV, Ball/Gate VALVE.
  • Having good experience for vertical & horizontal pumps maintenance & commissioning & plan52.
  • Execution of Piping Fabrication and Erection for Process, Fire Water and Utility Services which includes CS, SS, CRYO, GI and LTCS piping. Activity includes Documentation for Mechanical Clearance, Testing (Hydro/ Pneumatic) etc.
  • Execution of Structural Fabrication & Erection Job, Handrail and Grating work ensuring safety at site for Pipe Rack & Operating Platform. Dismantling of Structural Barricading frame of around 300 MT.
  • Responsibility Includes Structural Detail Drawing Preparation from GA drawing as per the Specification and Standards of EIL.
  • Preparing Work Schedule, Billing Schedule and monitoring Construction Schedule.
  • Cost estimation for non-SOR job, Rate finalization with PMC and approval from PMC & Client.
  • Monthly Cash-Flow preparation and monitoring.
  • Material Reconciliation for structural and piping job.
  • DPR and Hindrance Register preparation for each day and Overall Progress Report Monitoring.
  • Attending Meeting with Consultant and client and Co-ordination with HO.
  • Project Name: Installation of 04 Nos. Mounded Bullets BPCL LPG Terminal, Haldia
  • Client: BPCL (E & P Division)
  • Consultant: Engineers India Limited
  • Project Value: Rs. 42, 19, 90,000.00/-

Lead Commissioning Engineer

IOCL
12.2017 - 03.2019
  • Executing Fabrication and Erection of unit piping job including installation of connecting equipment’s.
  • To take all the responsibility of Pre-Commissioning & Commissioning of Hydro-carbon Product and Handing over to the operation.
  • From p&id can make procedure & planning for commissioning with all document work like Rule-33, Rule-18, PESO and OISD guide line and certification work.
  • Entire systems (PLC) as a DCS operate the plant as per PFD & P&ID
  • Any type of valve & site instrument maintenance like ROV, MOV, Ball/Gate VALVE.
  • Having good experience for vertical & horizontal pumps maintenance & commissioning & plan52.
  • Executing Fabrication, Erection, Loop Wise Mechanical Clearance, and Hydro-testing for Process and Utility Piping System.
  • Involvement in Pre-commissioning (Testing, Flushing, Box Up, attending Checklist and Punch List, Loop File Preparation etc.) and Commissioning activity of Distillation unit, Producer Gas unit, Power Plant integrated with Carbon Black Unit.
  • Responsibilities include Cost Estimation, BOM Preparation, Project Scheduling, Contractor Selection, Making Material Requisition (Through ERP), Resource Allocation and Progress Report Monitoring.
  • Piping layout design for Air, Steam, Nitrogen, Water system and Process Line.
  • Tank layout design, fabrication and erection for Distillation Unit.
  • Drawing (PFB, P&ID, GA, Isometric etc.) preparation, study and checking as per requirement in Project.
  • Final documentation preparation.
  • Project Name: Installation of 03 Nos. X 1000 MT Mounded Bullets Cochin Kerala
  • Client: IOCL
  • Consultant: IRS

Lead Commissioning Engineer

IOCL
12.2015 - 12.2017
  • Establishing time span of project execution as per client specification and contract. Putting deadline of each activity for completion of project physically and financially.
  • To take all the responsibility of Pre-Commissioning & Commissioning of Hydro-carbon Product and Handing over to the operation.
  • From p&id can make procedure & planning for commissioning with all document work like Rule-33, Rule-18, PESO and OISD guide line and certification work.
  • Entire systems (PLC) as a DCS operate the plant as per PFD & P&ID
  • Any type of valve & site instrument maintenance like ROV, MOV, Ball/Gate VALVE.
  • Having good experience for vertical & horizontal pumps maintenance & commissioning & plan52.
  • Execution of Piping Fabrication and Erection for Process, Fire Water and Utility Services which includes CS, SS, CRYO, GI and LTCS piping. Activity includes Documentation for Mechanical Clearance, Testing (Hydro/ Pneumatic) etc.
  • Execution of Structural Fabrication & Erection Job, Handrail and Grating work ensuring safety at site for Pipe Rack & Operating Platform. Dismantling of Structural Barricading frame of around 300 MT.
  • Responsibility Includes Structural Detail Drawing Preparation from GA drawing as per the Specification and Standards of EIL.
  • Preparing Work Schedule, Billing Schedule and monitoring Construction Schedule.
  • Cost estimation for non-SOR job, Rate finalization with PMC and approval from PMC & Client.
  • Monthly Cash-Flow preparation and monitoring.
  • Material Reconciliation for structural and piping job.
  • DPR and Hindrance Register preparation for each day and Overall Progress Report Monitoring.
  • Attending Meeting with Consultant and client and Co-ordination with HO.
  • Project Name: Installation of 02 Nos. X 1000 MT Mounded Bullets Haldia
  • Client: IOCL (Pipe Line Division)
  • Consultant: Mott Macdonald
  • Project Value: Rs. 47, 49, 98,000.00/-

Sr. Engineer-(Mechanical)

CPCL
12.2013 - 12.2015
  • Providing Residual and Detailed Engineering, Procurement, Supply, Manufacture, Fabrication, carrying out Route Survey, wherever required for Over-Dimensional Consignments, Transportation of all Equipments & Material to Site, including Loading, Unloading, Storage, Maintenance, Construction, Installation, obtaining all necessary statutory approvals from concerned Government Authorities, as applicable, Pre-commissioning, Commissioning, Performance Guarantee Test Runs, Including Total Project Management and Handling over of 12 nos. of Mounded Bullets at Manali Refinery of CPCL, Chennai.
  • Planning & Execution of Tankage Work (EPC/LSTK Project) of MOC: SA 516, SA 516 HIC & SS-304 as per API 650 & drawing specification of owner.
  • Preparation of Construction Schedule (time span for each activity such as engineering, procurement, execution etc) as per contract and client specification.
  • Resource (Manpower, Material and Machineries) planning considering the budgetary parameters and monitoring the usage for resource optimization.
  • Execution of plate fabrication work (Cutting, Bending, and Edge preparation) as per drawing specification.
  • Execution of tank erection job at site by jack lifting method. Inspection of vertical and horizontal alignment for shell.
  • Checking fit-up with EIL/BPCL, Mechanical Clearance, PWHT and Hydro-testing.
  • Overall Construction monitoring by means of Progress Report (DPR, WPR & MPR), Hindrance Register, Resource shortfall list, Back-up programme etc. Preparation of Monthly Construction Programme and Monthly Review Meeting With Client.
  • Material Management, material status monitoring. Preparation of Monthly Purchase Requisition and Give priority of materials to our Purchase Dept. for procurement according to the Site activity.
  • Organizing internal meeting, attending meeting with client and Co-ordination with HO.
  • Invoicing of executed job in a scheduled manner to maintain the proper cash-flow at site.
  • Preparation of liability statement and forecasting for every month.
  • Maintaining safety at site as per HSE plan and safety rules and regulations.
  • Project Name: Installation of 12 Nos. Mounded Bullets
  • Client: CPCL
  • PMC: PDIL
  • Work Duration: DEC-2013 TO DEC-2015
  • Project Value: Rs. 1, 75, 39, 75,000.00/-

Mechanical Engineer

IOT Anwesha & Engineering Construction Limited
08.2013 - 12.2013
  • Procurement, Construction, Pre-Commissioning & Commissioning of 4 Nos. Storage Tanks including the Civil, Tanks, Piping Works at BORL, Bina (M.P., India)
  • Site Co-ordination of Tankage Work.
  • Planning of the overall project with effective Construction Schedule and Liquidation Plan.
  • Project Detail Scheduling, Micro Scheduling, Monthly & Weekly Scheduling and Progress Monitoring of the same.
  • Material BOM preparation, BBU finalization and approval of the same for billing of both supply & Service.
  • Coordinating of weekly review meeting, monthly review meeting etc. with client/consultant, MOM preparation.
  • Invoicing monthly RA with all necessary documentation.
  • Site Mobilization and Demobilization handling.
  • Flow Control of Drawing, Materials, Equipment, Machineries, Tools & Tackles at site.
  • Project Name: Construction of 4 Nos. Storage Tanks
  • Client: M/s Bharat Oman Refineries Ltd.
  • PMC: M/s Mott MacDonald
  • Work Duration: Aug-2013 to Dec-2013
  • Project Value: Rs. 24, 00, 00,000.00/-

Education

Diploma in Mechanical Engineering -

Board of Technical Education U.P LUCKNOW
01.2013

12'Th Standard - undefined

Meral s.c.p.Institution
01.2009

10'th Standard - undefined

01.2007

Skills

Internet: - Surfing, Mailing

Certification

Appreciation Certificate from M/s. Chennai Petroleum Corporation Limited (Group Company of Indian Oil Corporation Limited)

Disclaimer

I declare here that the above-mentioned information is true to my knowledge and belief. Passport No.: - Z3010473

Section name

  • Religion: Hindu
  • Address: Vill-Mugura, P.O-Meral, Dist-Barddhaman, State-W.B, Pin-713424, India

Timeline

Asst. Manager Projects

GAIL (INDIA) LIMITED
06.2024 - 02.2026

Lead Engineer Project

Hindustan Petroleum Corporation Limited
11.2023 - 06.2024

R.C.M

Hindustan Petroleum Corporation Limited
01.2023 - 11.2023

R.C.M

Hindustan Petroleum Corporation Limited
01.2022 - 01.2023

R.C.M

Hindustan Petroleum Corporation Limited
12.2020 - 01.2022

Lead Mechanical Engineer

Ishan Equipments Pvt. Ltd.
04.2019 - 12.2020

Lead Commissioning Engineer

IOCL
12.2017 - 03.2019

Lead Commissioning Engineer

IOCL
12.2015 - 12.2017

Sr. Engineer-(Mechanical)

CPCL
12.2013 - 12.2015

Mechanical Engineer

IOT Anwesha & Engineering Construction Limited
08.2013 - 12.2013

12'Th Standard - undefined

Meral s.c.p.Institution

10'th Standard - undefined

Diploma in Mechanical Engineering -

Board of Technical Education U.P LUCKNOW
Biplab Samanta