Summary
Overview
Work History
Education
Skills
Languages
Affiliations
Websites
Timeline
Generic
CHARLES PANNEERSELVAM

CHARLES PANNEERSELVAM

Tamilnadu

Summary

Electrical supervisor with 12 years of Experience with major EPC companies and construction companies like EIFFAGE GENIE CIVIL MARINE (EIFFAGE group France),HYUNDAI ENGINEERING& CONSTRUCTON ROTARY ENGINEERING FUJAHRAH FZE( ROTARY group of companies,Singapore),SINOPEC TENTH CONSTRUCTION CO LTD(SINOPEC group of companies, China),DELHI ELECTRICAL CONSTRUCTION, DM POWER SYSTEM and SURYA ELECTRICAL CONSTRUCTION. Experience with construction with MS office and DATA base software’s. Experience with Refinery and Petroleum product loading platform project, OIL and GAS tankage project, OIL and GAS Gathering center project, LOWER FARS HEAVY OIL project, Manufacturing Industrial project, Residential and commercial building project. Managed subcontractors and Team of technicians and Electricians. Effective communicator with Excellent negotiation skills, with strong leadership qualities and analytical power. Ability to work in fast – faced environment to set deadlines.

Overview

12
12
years of professional experience

Work History

E&I Foreman

HSS JV(EIFFAGE GENIE CIVIL MARINE) PACKAGE 5, UNIT 93, OFFSHORE PROJECT, KIPIC REFINERY PROJECT,
Al Zour
07.2020 - 12.2022

• Responsible for Electrical cable , Instrument IS AND non IS CABLE , CONTROL CABLE Laying for various cable trays, and trenches,

• Responsible for 50mm to 600 mm GI and stainless cable trays fabrication and installation for pipe rack structure and shelters,

• Supervising for cable glanding Termination for Required location, following as per Drawings,

• Up to 300 sq mm Earthing cable and up to 50X 20 mm size of Earthing strip laying for following Earthing Layout drawing,

• Responsible for the Electrical and Instrument installation of cable conduits, cable trays, Earthing protection lighting system installation,

• ICSS vendor supporting for Pre- Commissioning and commissioning ,

Installation for F&G Related Smoke Detector,flame detector, Heat Detector,

• Supervising for Electrical ,Instrumentation cables and control cable’s laying for following layout drawing and cable schedule

• Witness/conduct continuity insulation test on low voltage, medium voltage cables and High voltage cables, before and after pulling,

• Power DB's, Lighting DB's, Lighting and power JB's, Welding sockets, convenience sockets installation,

• Supervising for LEVEL TRANSMETER, PRESURE TRANSMETER, TEMPRATURE TRANSMETER Installation,

• HONEYWELL XNX model gas detector installation, calibration and, troubleshooting,

• Solenoid valve Maintenance and Trouble shooting for during Warranty period,

• MAMBEY Mooring System troubleshooting for during warranty period,

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, GC 32 PROJECT, PETROFAC ltd ,KUWAIT OIL COMPANY(KOC) KUWAIT
Kuwait
03.2019 - 07.2020
  • Provided technical supervision and support to Instrumentation and Electrical (I&E) supervisors, Instrument and electrical planners and contract personnel.
  • Obtained proper permits to carry out electrical work on facility and construction projects.
  • Enforced safety regulations and penalized workers for not following work safety agreements.
  • Reviewed and monitored cost and man-hour budget for installation process to develop staff facilities, equipment and tool requirement plan.
  • Delegated duties to employees based on skillset.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • Monitored project progress to enforce adherence to deadlines and quality standards.
  • • 11KV /440 v oil type transformer installation follow the Approved Layout Drawings and installation Drawings,
  • 11 kV/3.3 kV OIL TYPE TRANSFOREMER Installation follow approved layout Drawing and installation Related Drawing,
  • Transformer HV and LV single core and multi core cable glanding and Termination,
  • Responsible for 3.3 kV motor cable glanding, termination before complete IR test and motor rotation test
  • Capacitor bank installation for as per following drawing,Supervising for HV panel , MCC PANEL, LV panel , EMCC panel , LV ,HV BUSDUCT & Marshaling panel Installation for inside substation following Electrical Equipment layout Drawing and related drawing,
  • Supervising for Cathodic protection Transformer, Test box, sacrificial anode and magnesium anode installation for following as per side Requirement,
  • Supervising for Lighting and JB support fabrication and welding for following Drawing and modification as per site condition,
  • Supervising for STREET LIGHTING ,FENCE LIGHTING, FLOOD LIGHTING POLES, STRUCTURE MOUND LIGHTING,SHELTER LIGHTING installation,
  • Power DB's, Lighting DB's, Lighting and power JB's, Welding sockets, convenience sockets installation for following Approved Drawings,
  • Responsible for Up to 300 sq mm Electrical power cable and control cable Laying for cable trench , cable trays,
  • Responsible for Cable trays fabrication and installation following as per layout Drawing,
  • Supervising for Electrical and instrumentation Earthing cable up to 400 sq mm insulated and non insulated cable laying exothermic welding as per following Earthing Layout Drawing ,

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, LFHOD PROJECT PHASE-1,PETROFAC ltd, KUWAIT OILCOMPANY(KOC)
Abdaly
01.2017 - 03.2019

• Incharge for complete substation Electrical and Instrument construction activities,

• 11KV /440 v and 11kv/ 3.3 kV oil type transformer installation follow the Approved Layout Drawings and installation Drawings

• Transformer HV and LV single core and multi core cable glanding and Termination,

• 0.44/0.433 kV try type transformer installation for inside of substation,

• Installation of HT setup oil type transformers, LT LIGHTING TRY TYPE TRANSFORMER,VSD, HV ,MV panels control MCC& EMCC ,VSD , panels, LV HV BUSDUCT,DIESEL GENARATOR LOAD BANK,EGCP Panels ,ESCADA Panel,

• Supervising for GLANDING TERMINATION for HV, LVCONTROLCABLES for as per following documents,

• Installation of Earth Pit rod and Earthing bus bar,

• Supervising for Electrical and instrumentation Earthing cable up to 400 sq mm insulated and non insulated cable laying exothermic welding as per following Earthing Layout Drawing ,

• Supervising for Cable laying for HV, LV cables in Underground and Cable trays as per following cable schedule, layout diagram, section drawing,

Electrical Engineer

DM POWERSYSTEM, CHENNAI,TAMILNADU, INDIA
Chennai
12.2014 - 01.2016
  • Provided troubleshooting and analysis for discovered electrical faults, offering potential solutions.
  • Performed electrical design analyses and tests for proposed systems and devices.
  • Conducted tests on electrical systems and equipment and reported results.
  • Performed equipment and product maintenance and inspected systems to locate potential malfunctions.
  • Install circuit breakers, switches, and outlets, light fixtures, electronic equipment and Communication Systems.
  • Assemble, install, and wire the electrical systems in new homes, residential and commercial buildings.
  • Cut, thread, Bend, assemble and install conduit, electrical conductor enclosures, and fittings. Follow blueprints and wiring diagrams,
  • Installation of HV and LV panel’s, DB’s,
  • LV, HV cables continuity and IR test,
  • Install circuit breakers, switches, and outlets, light fixtures,
  • Managed the repair and replacement of damaged electrical components/assemblies.
  • Respond to customer service and complaints and working with homeowner solving problems at their residences. Working with other trades/builders to solve homeowner issues.

Electrical Technician

ROTARY ENGINEERING FUJAHRAH FZE LTD, FUJAHRAH OIL TERMINAL, (TANKAGE PROJECT),UAE
Fujahrah
06.2014 - 11.2014
  • Assembled electrical systems or prototypes using hand tools or measuring instruments.
  • Tested circuitry and electronic components according to engineering instructions, technical manuals or knowledge of electronics.
  • Performed diagnostics and testing to locate root causes and resolve issues for optimal performance.
  • Frequently worked overtime, weekends and holidays.
  • Installed electrical wiring during remodeling projects.•
  • Electrical and Instrument Cable Laying,
  • Installation of lighting dB’s, Power DB’s ,industrial socket outlets and lighting fixtures,
  • Installation of LV and HV panel installation,
  • Installation testing and commissioning of electrical power, Internal lighting and External lighting,
  • LV, HV and control cables continuity and IR test,
  • Participate in Pre-commissioning and commissioning activities,
  • All lighting JB Installation , Glanding and Termination,
  • Instrument JBs cable dressing, glanding and Termination,
  • Cable Ladder Tray making of 45 and 90 degree and horizontal and vertical laying.
  • Street light pole installation,
  • Motor and MOV termination

Electrical Supervisor

DELHI ELECTRICAL CONSTRUCTION, (EA GRADE CONTRACTOR) (CONSTRUCTION PROJECT CHENNAI,TAMILNADU,
Chennai
11.2012 - 04.2014

• Installation of HT setup transformers, control MCC panels load take off panels, VCB panels, cables laying cable GLANDING and TERMINATION,

• During troubleshooting quickly fault trace out by the electrical drawing,

• Execution of HV,LV system installation , testing and commissioning of LV panels MDBs & SMDBs LDBs consultant requirements complying with local authority standards and project specification,

• Installation testing and commissioning of electrical power, Internal lighting and External lighting ,lighting control and dimming control system,

• Maintenance of all electrical equipment like motor star delta starter,

• Motor installation including switchgear design, assembling, and installation.

• Maintenance of low, medium and high voltage processes involving single and multiphase wiring.

• Monitor manpower at a site of electrical sub-contractor makes it sure that all possible activity area,

• Schedule the work activities of manpower, with due consideration of stock materials on hand, current and projected materials equipment and manpower availability.

• Conduct installation of cable Trunking, containment, cable tray, small power and lighting systems

• Conduct installation of cable raceway such as; ladder/perforated trays, conduits fittings for lv and mv cables,

• Rewire, problem diagnosis and troubleshooting of existing electrical systems.

• Monitoring and checking all materials delivery at site, outstanding materials

• Accounts (Sub contractor bill Budget Detail )

• Preparation Of Rate Analysis,

• Repair or replace wiring, equipment, and fixtures, using hand tools and power tools

• Motor installation including switch gear design, assembling, and installation,

Electrical Supervisor

SURYA ELECTRICAL CONSTRUCTION, ( EA GRADE CONTRACTOR) ARYA NET INSTITUDE OF TECHNOLOGY ,KERALA,
Chennai
06.2011 - 09.2012

• Assemble, install, and wire the electrical systems in new homes, residential and commercial buildings.

• Cut, thread, Bend, assemble and install conduit, electrical conductor enclosures, and fittings. Follow blueprints and wiring diagrams

• Installation of HV and LV panels, DB’s,

• 11kV/440 v ,500 kVA oil type transformer installation with double pole structure Erection,

• 50kVA Diesel generator installation and commissioning,

• Install circuit breakers, switches, and outlets, light fixtures, electronic equipment, and Communication Systems.

Education

J.D. - Diploma in Electrical And Electronics Engineering

Sembodai RV Polytechnic College,
Sembodai, Vedaranyam
04.2011

Skills

Electrical Construction,

Electrical Maintenance,

Project Management,

Troubleshooting,

Ordering Materials,

MSOFFICE(WORD,EXCEL)

Languages

Tamil
First Language
English
Upper Intermediate
B2
Hindi
Intermediate
B1
Arabic
Beginner
A1

Affiliations

• Good knowledge about Permit to work system,

• Following offshore safety and regulation,

• Study of Drawing and Implement,

• Required manpower arrangements.

• Avoid construction delay by efficiently following through with all site inspection,

• Ensure all installation meet quality and Electrical codes standards,

• Study job specification to determine appropriate construction methods

• Conduct routine quality audits to ensure work progressing per specification,

• Generated regular progress report,

• Telling Electrical workers exactly what is expected of them,

• Plan and schedule projects ,estimate and materials, supervise subordinates, maintain records and files and prepare reports,

• Maintain knowledge of electrical materials in warehouse,

• Facilitated processing of RFI ‘s submit and samples among the general contractor the owner and the owner consultants

• Check the electrical layout and installation of all equipment, devices must be in the standard asper

• Check all materials delivery at the site the quality, brand, as per specification and approved materials

• Monitoring of work progress quality check for timely completion of work

• Responsible for supervising and coordinating the work activities according to productivity and quality standards

• Ensure all materials/equipment have done an inspection-before installation especially on transformer and switchgear equipment

• Witness/conduct continuity insulation test on low voltage and medium voltage cables, before and after pulling

• Manage construction costs to ensure project profitability

Timeline

E&I Foreman

HSS JV(EIFFAGE GENIE CIVIL MARINE) PACKAGE 5, UNIT 93, OFFSHORE PROJECT, KIPIC REFINERY PROJECT,
07.2020 - 12.2022

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, GC 32 PROJECT, PETROFAC ltd ,KUWAIT OIL COMPANY(KOC) KUWAIT
03.2019 - 07.2020

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, LFHOD PROJECT PHASE-1,PETROFAC ltd, KUWAIT OILCOMPANY(KOC)
01.2017 - 03.2019

Electrical Engineer

DM POWERSYSTEM, CHENNAI,TAMILNADU, INDIA
12.2014 - 01.2016

Electrical Technician

ROTARY ENGINEERING FUJAHRAH FZE LTD, FUJAHRAH OIL TERMINAL, (TANKAGE PROJECT),UAE
06.2014 - 11.2014

Electrical Supervisor

DELHI ELECTRICAL CONSTRUCTION, (EA GRADE CONTRACTOR) (CONSTRUCTION PROJECT CHENNAI,TAMILNADU,
11.2012 - 04.2014

Electrical Supervisor

SURYA ELECTRICAL CONSTRUCTION, ( EA GRADE CONTRACTOR) ARYA NET INSTITUDE OF TECHNOLOGY ,KERALA,
06.2011 - 09.2012

J.D. - Diploma in Electrical And Electronics Engineering

Sembodai RV Polytechnic College,
CHARLES PANNEERSELVAM