To grow with a team on present focus of Oil and Gas projects. To obtain a challenging position and implement the acquired skills & knowledge which add value to department goals & ultimately organizational growth & objectives. I am dedicated, committed & reliable with a natural determination and persistence to achieve goals.
Overview
18
18
years of professional experience
Work History
Production Manager
Gilbert & Maxwell Electricals Pvt Ltd
01.2023 - Current
Overall planning, scheduling and completion of work required to support all manufacturing activities in compliance with all regulatory requirements in a cost effective manner and in accord with planned budget
Interface with all plant management groups, including quality, design, sales, customer service, finance and human resources in order to meet production, quality and compliance requirements
To maintain compliance with OSHA regulations related to manufacturing.
Assistant Project Manager
LARSEN & TOUBRO ENERGY HYDROCARBON
08.2019 - 01.2023
Checking of Material Take off, Material requisitions
Preparing & Tracking engineering deliverable packages and material status, Planning etc
Co-ordination with the engineering & site for the problems faced during Engg
Fabrication/installation
Checking & commenting of the engineering DWGs i.e., P&ID, ISOs, structure etc
Give the clearance for the fabrication
Preparing of the Schedules of the offshore activities to count the barge days for offshore
Preparing & updating the master loop file packages for hydrotest
Co-ordination with the clients for their requirements coming during & before engineering & fabrication
Checking of the NAVISWORK model & give the comments if any
Preparing of Demolition/Construction scope of piping and structure of the revamping modules with the help of NAVISWORK model & bid data
Site survey with the help of laser scanner contractor and preparation of survey report for detailing of accurate scope of work
Working on the client’s comments and try to clear the comments in stipulated time
Preparation of the philosophies and procedures and get it cleared from client
Preparation of piping flushing volume pro-data.
Mechanical Engineer
Trans Power Tech Ltd
08.2018 - 08.2019
Erection & manufacturing of low voltage transformer
Allocation of work & supervise to carry out production process smoothly
Co-ordination with quality & design team
Material management regarding purchase, store & manufacturing
Blasting & powder coating.
Project Site Engineer
McConnell Dowell
09.2017 - 06.2018
Pre-site survey to ensure the available facility as per the latest revision drawings
Coordinate with Managers and Superintendents on engineering, scheduling and status of the project
To coordinate for the shutdown activities of plot & on plot tie in pipeline works includes shutdown plan preparation, manpower, machinery, Shutdown materials & equipment estimations, Coordination for the permit to work procedure with client, coordination for the site preparation
To coordinate for the installation, stringing, lowering, testing, and commissioning activities of 99KM lined pipeline
Control fabrication and field construction engineering and schedules for overall programs
Preparation & submission of DPR to client Management representative
Monitor and coordinate the preparation maintenance and change of construction schedules, methods and equipment requirements
Advise on actions to be taken to prevent or improve undesirable trends in progress
Regularly assess the effectiveness of the quality on the project and provide reports to management on quality performance and areas for improvement associated with inspection activities
Compile monthly reports from information received from managers and superintendents
Interact with other Engineers/Managers (Civil, Mechanical, Marine & electrical) to review, implement and manage the quality requirements for the project
To ensure effective and satisfactory progress and completion of all work areas for the project
Organize for the qualification of welders.
Project Engineer
SWIBER OFFSHORE (INDIA) PVT. LTD
11.2015 - 11.2016
Responsible of plan, organize, execution, fabrication, modification and erection works
(Piping & supports) Follow-up with vendors for timely delivery of materials
Responsible for installation, fabrication, erection of clamps and its modification at site
Responsible for maintaining Swiber/ONGC HSE policies during the PRP4 project onsite execution
To confirm & check that all project drawings are of latest revision before initiation it of fabrication process
To handle on site & offsite coordination & meetings with clients
Ensure work is carried out in accordance with relevant codes, standards and procedures progress monitoring, forecasting and reporting
Preservation of the mechanical equipment’s and piping material
Responsible for co-ordination with other engineering departments like HSE, QC, Planning etc.
Project Engineer
TECHNOMAK ENERGY LLC, ABUDHABI
06.2013 - 08.2015
Major and minor clarifications with the EPC and subcontractor companies regarding scope of work, new work extensions, revamping / up gradation works
Pre-Site survey for offshore & onshore related projects for (piping & structural.) Performed as a site In-charge for leading offshore projects
Responsible for maintaining TechnoMak HSE policies during the on-going project
Design & Routing of Civil trench & support Block by using Auto-Cad software
Updating of the isometrics according to the site conditions & preparing the final isometrics for the final billing & documentation
Arrangement & preparation of Tools & equipment’s in co-ordination with main store & purchase department
Fabrication & Erection of piping spools as per the drawings
Submittal of project drawings & engineering documents
Preparation of Project Schedule in Co-ordination with Planning Engineer
Responsible for issuing the drawings from client with transmittal
Check the material availability at site stock & material replacement when required
Compilation of piping scope activity work packs Including MTO’S drawing, method statement, sequences, manpower & equipment requirements & project activity durations
Monitored Sub-contractors to ensure timely and economic performance in accordance with company requirements.
Project Engineer
WELD-TECH ENGG. PVT. LTD.
12.2011 - 03.2013
Supervision of offshore & onshore fabrication & erection
Supervision for the visual welding Inspection & coordinate with the QC Engineer with respect to inspection for each joint( Butt weld/ Fillet weld)
Preparation for the Hydro testing of pipelines for given hydro testing Pressure
Review project specification, design instruction, flow diagrams, line list and client’s information
Conversant with international codes such as ASME B31.1, ASME B31.3, ASTM, API standards
Release for Pre-fabrication of A/G spools (CS/SS) based on the priority and material availability
Erection of piping & structural work @ site as per drawings
Inspection Plans for pipe spools as per the Inspection documents
Preparing as built drawing, weld mapping for field joints & final review of tests packs
Preparation of high pressure IBR steam lines & does the approval for the same
Maintain the quality of weld & its personnel as per WPS & PQR documents
Review of piping material specification and valve data sheet
To coordinate with the venders, clients & consultant.
Project Engineer
DAS OFFSHORE ENGG. PVT. LTD
03.2008 - 12.2011
To handle Off shore/On shore fabrication facilities (Gas/Oil/Water)
Review of project drawings as per platforms & with latest revision
To do the site survey before starting the work
To study & prepare all the fabrication drawings as per project
Coordination with QA/QC team for clearing NDT activity as per piping class & project requirements
Rerouting the line according to the sight query notes & field change note
Preparing as built drawing, weld mapping for field joints & final review of tests packs
Performing line walk down of test packs & preparing of internal punch list to clear the punch points as per category A, B, & C
Coordinate with hydro test team for preparation of hydro test, pneumatic test & flushing & blowing activities
Coordinate during Re-installment activities to closing the punch points
Coordination with material department regarding with identification of materials with custom clearance & inspection clearance
Co-ordination with project Head regarding all project work
Installation of material on site as per drawing
Preparation of materials as per drawings.
Production Engineer
BLUE STAR INDIA LTD
02.2007 - 02.2008
Sheet Metal Fabrication
Service Engineer
NADKARNI BEARINGS
03.2006 - 02.2007
Maintenance of Bearings & Vibro Monitoring Services
Education
Skills
Project Management
OSHA Compliance
Training Coordination
Engineering packages
Mechanical Software
AutoCAD 2006
PRO PIPE DATA
NAVIESWORK (READ)
Personnel Training Completed
Tropical Basic Offshore Safety Induction Emergency Training. (ETSDC institute -ABUDHABI)
Basic H2S Training. (ETSDC Institute -ABUDHABI)
H2S Awareness & Escape Level 2, CMC, Abu Dhabi
Basic First Aid Training CMC, Abu Dhabi
Contractor Permit to Work Training for ADCO Permit.
Sr Accounts & Finance at WORLDWIND ELECTRICALS PVT LTD AND WORLDWIND HEAVY ELECTRICALS LLPSr Accounts & Finance at WORLDWIND ELECTRICALS PVT LTD AND WORLDWIND HEAVY ELECTRICALS LLP