BusinessDevelopmentManager
Chetan K Bakal

Chetan K Bakal

Sr. Project Engineer
Pune

Summary

Focused Senior Project Engineer with more than 6.5 years of Experience with Oil & Gas Refinery and Data Centre Projects with success in Planning, Execution, Project Coordination & Management throughout project Life Cycle. Detail-oriented in assessing project objectives to determine the correct direction for project planning and execution. Meticulous in remaining involved throughout the life of the project by analyzing project data and reporting in accordance with regulations.

Overview

7
7
years of professional experience
4
4

Hands on Technical Skill

5
5

Oil and Gas Projects

3
3

Data Centre & MEP Projects

Work History

Sr. Project Engineer

Prasa Infocom and Power Solutions Pvt. Ltd
Pune, Bangalore
07.2022 - Current
  • Project 7 : Mechanical, Electrical and Plumbing (MEP) works for Karnataka State Office Building, Residential/Transit complex, Guest House, Club House, Canteen, Substation and Business Continuity Centre (BCC) at IOCL, K R Puram, Bangalore.
    Period: 01.07.2022 to Till Date.
  • Experience in Data Centre Project Execution & Management including Engineering Philosophy, Layout Drawings, coordination on technical level, Installation, Work Quality Inspection, Testing & Commissioning complete from mobilization, monitoring & control to the charging of the same.
    Scope of Work Includes:
    • Data Centre Works, Server racks, Cold & Hot Assailed Containments, PAC, VRVs Systems, Track Bus Way & Fiber Guided Systems.
    • Novac Gas & Fire Pipping, STP, WTP & UGR Valves, Pipping & Instruments
    • Electrical Panels, UPS, Lighting, FA & PA, Door Access & CcTv, Lifts and BMS System.

Sr. Engineer – MEP

Shubham EPC Pvt. Ltd., Pune (MH)
Pune
12.2019 - 06.2022

• Top Performer of the 4th Quarter for FY 2020-2021

Project 6 : Construction of Center for Data Science, Quantum Technology and ECS by vertical Extension of Main Building at IISER, Pune. (CPWD Project)
Client : Indian Institute of Science, Education & Research, Pune (IISER, Pune)
Period: 17.01.2022 to 29.06.2022.
Scope of Work Includes:
• AHUs, PAC, Cassette AC & VAVs including Ducting Works with Chilled Water Pipping & Insulations.
• Fire Fighting, Hydrant Pumps & Skid’s Valves, Instruments Pipping Works.
• Electrical Panels, UPS, Lighting, Fire Fighting & Alarm, Lifts, Plumbing and BMS System.

Project 5 : Plant Building Works-II for the BS-VI Project of IOCL’s Gujarat Refinery, Vadodara.
Client : Indian Oil Corp. Ltd.’s Gujarat Refinery, Vadodara
PMC : Engineers India Limited, New Delhi
Period: 27.12.2019 to 15.01.2022.
Scope of Work Includes:
• AHUs (36000 CFM), Chillers & Vapor Absorption Machine (up to 200Tr VAM – Voltas Make),
Heater Banks, Pan Humidifier & PRDS System including Ducting & Piping Work.
• Medium Pressure Steam Line, Chilled Water & Pneumatic Line Valves, Pipping, Insulations &
Instruments works with PID and PLC & SCADA Automation.
• Experience in PID Controller & Heat exchanger’s Overhauling & Repair.
• Civil Finishing Work and Electrical Work (Panels, Lighting, Earthing, Plumbing and FA & PA).

Sr. Project Engineer – Electrical

Laxmi Engineering Pvt. Ltd
Ahmadabad
05.2016 - 12.2019
  • Project 4 : Electrical Works for CCRU & ISOM (Revamp/Shut Down) of Composite Works I for Indian Oil Corp. Ltd.’s Gujarat Refinery, Vadodara
    PMC : Engineers India Limited, New Delhi
    Period: 28.11.2018 to 23.12.2019.
    Scope of Work Includes:
    • Various Equipment’s Civil Foundations & Mechanical Structural & Piping Work.
    • Electrical Distribution Panels, UPS, Lighting, PA System, various LT & HT Motors (upto1200 KW),
    Cables (up to 33KV & Total 250 KM), Various Lighting Poles & High Mast Towers
  • Project 3 : Electrical Works for Offsite & HGU-ARU (New Process Units) of Composite Works I for Indian Oil Corp. Ltd.’s Gujarat Refinery, Vadodara
    PMC : Engineers India Limited, New Delhi
    Period: 28.11.2018 to 23.12.2019.
    Scope of Work Includes:
    • Fire Hydrant Pipping & Instruments Works including Civil & Structural Work for various Equipment.
    • 33 KV & 11 KV Substation’s Power (up to 12.5 MVA), Distribution & Lighting Transformers
    • HT & LT Switchgears viz. GIS, PCCs, MCCs, LDBs, ASBs, DCDBs, including SAS Panels, VFDs, PLCs,
    ECS & RTU Panels (Siemens IEC61850) & Telephone Exchange (Awaya CM 5.1.2 with 100 outgoings)
    • HT-LT Feeder Modification, Bus Duct, Capacitor - Battery Banks, Fire Fighting, Earthing & Lightning protection Systems etc.
  • Project 2 : Operation & Maintenance of BS-VI Project of IOCL’s Gujarat Refinery, Vadodara.
    PMC : Engineers India Limited, New Delhi
    Period: 09.11.2017 to 28.11.2018.
    Scope of Work Includes:
    • 11 KV Sub-Station, 6.6 KV Compact Substation, Distribution Panels & DG Sets, 11
    • Field Motors & Pumps High Mast Lighting, Cable Laying & Earthing System
  • Project 1 : Construction Power Works-II for BS-VI Project of IOCL’s Gujarat Refinery, Vadodara.
    PMC : Engineers India Limited, New Delhi
    Period: 26.09.2016 to 09.11.2017.
    Scope of Work Includes:
    • 6.6 KV Compact Substation, Distribution Panels & DG Sets
    • High Mast & Portable Lighting Towers, Cable Laying & Earthing System

Education

MBA - Project Management

D. Y. Patil College,
Pimpri, Pune, India
01.2022 - Current

BE - Electrical Engineering

Zeal Collage of Engineering & Research
Pune, India
08.2013 - 05.2016

Electrical Engineering

Cusrow Wadia Institute of Technology
Pune, India
08.2010 - 07.2013

SSC -

G.M.V, M. S. Board
Otur, Pune, India
06.2009 - 07.2010

Skills

Project Managementundefined