Mechanical Design Engineer with project management background. Efficient collaborator moves projects forward productively. Skilled at inspiring stakeholders to share ideas and information for project success.
Overview
9
9
years of professional experience
18
18
years of post-secondary education
5
5
Languages
Work History
Customer Associate
Instakart Services
Bangalore, Karnataka
07.2015 - 04.2017
Involved in maintaining customer relationship.
Making sure customer gets his delivery in right time
Planning the delivery of shipments according area
Tracking the vehicles
BIM Engineer
Desapex Engineering Consultants
Bangalore, karnataka
04.2017 - 04.2018
Completed one Live project.
Involved in Revit Modeling and Generating clash Detection report.
Fire-Fitting System -modeling
Pressure loss report Generating
Revit Family Creation
Architectural Model Creation
Plant room design
Heat Load Calculation
ISHARE ans ASHRAE standards
Operational Executive
Future Groups
Bangalore, Karnataka
04.2018 - 12.2018
Developed and maintained relationships with customers and suppliers.
Vehicle Tracking
Goods and Stock Management at Ware House
Design Engineer-Revit
Utility Projects & Services (P) Limited
Bangalore, Karnataka
12.2018 - Current
PROJECTS HANDLED.
Zonasha -India.
Tata Odisha-India.
Prestige central Plant room-India.
Bagmane gold stone-India.
Oracle-India.
Saleh Ahmed-India.
High Street Phoenix mall-India.
RBD-Olympus-India.
Rattha Somerset-India.
Three Star-India.
Dell crystal-India.
ITC One Colombo- Srilanka
Above mentioned projects are handled by me, working in Revit software and Naviswork manage, Revit modeling, Creation of Revit families, clash detection report, BOQ, ducting, piping, isometric Drawings, plant room modeling and shop drawings,etc...By using Navisworks Manage clash detection Report is generated and Real time simulate is done.
In this project we have done 1000 running meter of Piping,With the LOD 400,Challenging was it was located in the forest remote Area,With Site inputs, we have provided the Pre fabricated Pipes supply,with minimum wastage.
HIGH STREET PHIONIX MALL This projected Located In Mumbai,This is one of the commercial Place with 24 Hrs Working,We have to do the Shutdown job ,without Making the centralized AC OFF.
Replacement of the Three Exiting chillers and Four Pump's, This Work we have used Advanced Software Naviswork Manage ,For planning and Revit for Modeling, We have done by making temporarily Connections and Initial stage,Later One By one we have Changed three chillers,without effecting the commercial bussines.
4D Modeling and Simulation of future Work Planning helped us a lot.
In this project we have done shaft piping and plant room Piping,with LOD-450.