Summary
Overview
Work History
Education
Skills
Languages
Projects Executed
Professional Enhancement
Personal Information
Work Availability
Timeline
Generic
ARUP KUMAR HALOI

ARUP KUMAR HALOI

Hyderabad

Summary

A dynamic professional with over 15 years of experience in Project & Maintenance, Operations & Maintenance and Commissioning. Demonstrated excellence in supervising Engineers & Designers in carrying out detailed engineering work for projects with entire responsibility for conceptual and detailed design. Excels in providing necessary technical information for procurement in compliance with tender specifications & within budgeted man-hour and project schedules. Proficiency in managing maintenance of various equipments for reducing downtime and enhancing operational effectiveness of equipment. Honed skills in working on initiatives for cost reduction and improving productivity by technology management.

Seeking senior level assignments in the domain of Plant maintenance or Project management with an organization of repute in any Location in India.

Overview

15
15
years of professional experience

Work History

Senior Maintenance Manager

Hindustan Coca Cola Beverage
Hyderabad
01.2023 - Current
  • Working as a Senior maintenance manager in HCCB Biggest Plant in South India located in Hyderabad , leading a team of 13 Team leaders .
  • Preparation and Execution of Preventive maintenance program in Plant 5 KHS OEM CSD lines( 3 PET and 2 ASSP), TetraPak juice and Sidel CSD Glass line delivering volume of 40 Lakh cases Per month @ 85% SLE .
  • Taking initiative on Plant Energy reduction opportunities - Installation Sub curb in PET lines ( Beverage filling @18 degree instead of 8 degree), Optimization of Plant 40 bar and 7 bar air resulting power yield improvement from 26 WLOB/Kwh to 32 WLOB/Kwh, Inhouse Solid fuel manufacturing for Solid Fuel fired 6 Ton Boiler,Blowing pressure in Blow max optimization in progress .
  • Implementation of Kaizen in refrigeration plant and successful prevention of frequent damage of Screw compressors.
  • Heading the Site led capexes from planning to Execution .

Deputy General Manager

Varun Beverages Ltd
Bangalore
08.2021 - 01.2023
  • Planned ,managed and controlled maintenance budget.
  • Managed Preventive maintenance programs, restoration of all utility Equipments (back to basic fulfilled condition).
  • Commissioning and erection of 5 nos KC6 compressors, New PET compressor (40 Bar) .
  • Improved preventive maintenance proficiency from 0% to 85%.
  • Instituted maintenance program –Complete with all associated documentation and training.
  • Introduced Autonomous maintenance and lead the production process improvements.
  • Applied creative reasoning and logic to resolve complex and specialized managerial issues and develop sound solutions
  • Collaborated with department heads to establish goals and work plans
  • Participated in planning process to achieve corporate objectives

Maintenance Head

Godrej Tyson Foods Limited
Bangalore
08.2017 - 08.2021
  • Created preventive maintenance and inspection lists and schedules to minimize breakdowns or disruptions in production processes.
  • Resolved day-to-day operational issues to reach short- and long-term performance goals.
  • Determined and controlled maintenance budget to reduce or eliminate repetitive purchases.
  • Used failure analysis techniques to identify and eliminate chronic problems.

· Productivity improvement in slaughtering line and Further processing line by implementation of FMEA and Lean six sigma tools.

· Improved Preventive maintenance proficiency from 20% to 95%.

· Implemented maintenance processes (TPM based) to achieve the lowest life cycle cost of Equipment.

· Developed and implemented training programs for all maintenance Employees and developed training manuals and SOPS for FSSC 22000 certification.

· Introduced Lean Manufacturing and lead the first Kaizen Event and other Production process improvements.

· Team member-AM pillar responsible for defect handling and Elimination.

· Safety audit of both Bangalore and Mumbai Plant and rectification of major issues which helped to increase the Safety Score from 60% to 85%.

Assistant Manager (Project and maintenance)

PepsiCo India Holding Pvt Ltd Technology Services Ltd
Kerala and Karnataka
07.2012 - 08.2017
  • · Execution of Complete Electrical, instrumentation and mechanical activities in all projects.
  • Preparation of Preventive maintenance annual planner, PM schedule, checklists and implementation.
  • Maintenance of DG efficiency and all utilities KPI as per AOP of plant
  • Execution of Energy savings projects in plant and utilities.
  • Execution of TPM in machines to ensure near to zero breakdown and implementation of kaizens.
  • Drafted quality assurance plan for the project and undertook commissioning of the plant
  • Commissioning of all new projects in Plant.
  • Execution of Safety projects in plant, machine safety review and 360 degree guarding in all rotating machines,
  • Taking care of complete production line in Aquafina Water Line during Plant Strike by union for 3 months
  • Preventive maintenance of both line and utility mechanical, Electrical ,Instrumentation and Automation .
  • Execution of all Capex in site

Electrical and Instrumentation engineer

Kraft foods India
Bangalore
03.2010 - 10.2012
  • Revised instrumentation guidelines to address exceptions and provide clarification, where needed.
  • Designed automation concepts and protocols for diagnostic testing and simulation purposes, applying Good Automated Manufacturing Practice (GAMP) protocols.
  • Drafted full piping and instrumentation diagram (P&ID) documents for Plant .
  • Troubleshooting and made operational Kraft foods Co packer Plant issue of Oven line in hyderabad plant, commissioning of Halls Glitter machine in Co packer in Gujrat plant .
  • Self design and commissioning of Plant Hot water system for utility and process area , Washing machine for Bubble Gum line , Green Belt six sigma project on Plant Energy saving of INR 40 L .
  • Developed Plant Preventive maintenance schedule , checklists ,implementation resulting breakdown reduction by 30% over YAGO

Automation & Instrumentation engineer

Saint Gobain-Gyproc India
Bangalore
05.2008 - 03.2010
  • Worked as Instrumentation and Automation engineer in Brown filed in saint Gobain Gyproc India Limited ,Bangalore Plant .
  • Worked as Shift Instrumentation engineer carrying out preventive maintenance and supporting production team .
  • Part of World Class manufacturing team and executed Focused Improvement project on Kukla Weigh feeder, achieved Zero Breakdown in Plant Process by driving and implementing 5S .

Education

BTECH - Electronics & Instrumentation Engineering

DR MGR Educational & Research Institute
Chennai
01.2008

Skills

  • Creating Maintenance Programs
  • Vendor Management
  • Equipment Maintenance
  • Team Leadership and Management
  • Safety Enforcement
  • Project Management and Execution
  • PLC automation
  • Maintenance policy
  • Utility Equipment Installation & Maintenance
  • Programme Innovation
  • TPM and Six Sigma
  • MS Office Suite (Word, Excel, PowerPoint & Outlook)
  • MS Project
  • AutoCAD

Languages

English
Hindi
Kannada
Bengali
Assamese

Projects Executed

  • Installation and commission of Plant Automation and Instrumentation system in Saint Gobain-Gyproc India., Project support engineer, Commissioning and execution of field instruments and PLC system Complete mechanical and automation work., Saint Gobain-Gyproc India Limited., Responsible for scheduling, execution, contractor job follow-up/monitoring, Quality supervision & commissioning of field Instruments & Siemens PLC I/O System. Verifying the PI&Ds, JB/Cable schedules, Hookup drawings, tech. documents, data sheets, logic diagrams, IO assignments, calibration /Test certificates & Layout drawings. Review meeting with vendor & contractors. Preparing the Startup procedure, Critical safety control interlocks, Maintenance procedure, Spares inventory & executing the pre-commissioning checks & trial run checks. Highlights: Checked & reviewed tender document and drawings Effectively coordinated with Vendor and Design team. Involved in techno-commercial negotiation with vendor and finalized vendor Executed work at site, verifying the PI&Ds, JB/Cable schedules, Hookup drawings, tech. documents. Executed the pre-commissioning checks & trial run checks.
  • Six Sigma Green Belt Project on Electrical Energy reduction in plant, Project Engineer, To reduce Electrical Energy in plant in terms of kwh/ton., Cadbury India Ltd (Bangalore) - Kraft Foods Ltd, To use six sigma tools and without investment of capital budget execution of project through kaizens, Highlights: Monitored and executed overall project with group of cross functional team. Prepared project schedule and reviewed the same on a weekly basis Drafted schedule for the project Kaizens and modification in machine. Handing over and project sign off to Plant Manufacturing excellence Head and Plant manager.
  • Makson Plant, Gujarat, Project engineer, Commission and installation of Glitter machine (Loss in weigh feeder) for Halls Line., 5 Days, Makson Plant, Gujarat (On payroll of Kraft Foods)
  • Commissioning of mega veg Plant of Godrej Tyson in Ludhiana (1.2 MT/Hr. capacity), Project manager, Godrej Tyson foods LTD, Highlights: Installed and commissioned Complete Plant starting of brown field Installed and commissioned HT,LT,Plant AHU,Utility Equipments ,All Equipments , dry commissioning and trial .
  • Recommissioning of Krones 400 BPM line for 400 ml/500 ml and 600 ml PET., Project Engineer in Plant and Utility, PepsiCo India holding Pvt Ltd, Bangalore, Highlights: Installed and commissioned MCC Panel,DG sets , Synchronisation with Existing DG sets Recommissioning of Combi Block 400 BPM Krones PET line, Conveyor installation and synchronization. Complete field termination and all necessary program modifications and Signal exchange between Filler, Paramix,CIP system. Installation of SBO 06 Blow molder ,CO2 bullet, Transformer and HT system, Labeller, Shrink wrapper and Palletizer installation in Both Bangalore and Palakkad plant.

Professional Enhancement

  • Certified machinery and safety Expert from TUV-NORD
  • Hands on training on All Drives commissioning and programming.
  • Undergone trainings on six sigma Green Belt and executed six sigma project in Kraft foods Bangalore on Electrical energy conservation.
  • Undergone training on ISO 14001 and OSHAS 18001 IMS system.

Personal Information

Date of Birth: 12/02/84

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Senior Maintenance Manager

Hindustan Coca Cola Beverage
01.2023 - Current

Deputy General Manager

Varun Beverages Ltd
08.2021 - 01.2023

Maintenance Head

Godrej Tyson Foods Limited
08.2017 - 08.2021

Assistant Manager (Project and maintenance)

PepsiCo India Holding Pvt Ltd Technology Services Ltd
07.2012 - 08.2017

Electrical and Instrumentation engineer

Kraft foods India
03.2010 - 10.2012

Automation & Instrumentation engineer

Saint Gobain-Gyproc India
05.2008 - 03.2010

BTECH - Electronics & Instrumentation Engineering

DR MGR Educational & Research Institute
ARUP KUMAR HALOI