Summary
Overview
Work History
Education
Skills
Certification
Interests
Timeline
Significant Highlights
Organizational Projects
Generic

C.R MUNI SAI KIRAN

Knowledge Associate
AVADI

Summary

A focused and result-oriented professional with 8.5 years of experience in Automotive Industry. Proven capabilities in Product Development and procurement,Sourcing,Design to Value,Project management. An effective communicator with strong analytical / logical skills to relate to people at any level of business and management. A quick learner with the expertise to work under pressure and meet deadlines. Having strong knowledge and experience in Multi-Commodity parts development,Sourcing,Pricing strategy for Passenger car and Tractor Assembly.

Overview

9
9
years of professional experience
6
6
Certifications
4
4
Languages

Work History

Knowledge Associate

McKinsey & Company
09.2025 - Current
  • Delivered valuable insights into competitor strategies through extensive market research activities.
  • Enhanced team collaboration by fostering open communication channels among peers and management.
  • Identified opportunities for cost savings by analyzing resources usage patterns and recommending adjustments as needed.
  • Excelled at maintaining strict confidentiality while handling sensitive information related to clients'' businesses.
  • Assisted senior leaders in the formulation of strategic plans based on thorough industry analysis.
  • Collaborated with cross-functional teams to provide comprehensive solutions aligned with client needs.
  • Demonstrated exceptional problem-solving skills in addressing complex issues arising during project execution.
  • Spearheaded data analysis projects, identifying key trends and insights to inform strategic decisions.

Manager

Hyundai Motor India Limited
08.2022 - 09.2025
  • Powertrain Development (Engine & Transmission)
  • Commodity : Engine and Transmission sub assembly, Fe Casting,Al casting,Forging & Machining
  • Conducting Global bidding pool and vendor selection for Part Development
  • RFQ Release and Quotation review for multiple vendors (LP & KD) and finalizing the vendor based on QCD Requirements.
  • Initiating Development based on Master Timing plan and sample submission for Build requirements
  • Supplier ISIR Review and submission to plant QC.
  • Tooling cost settlement for Heavy components (Casting Block & Die)
  • Part cost settlement based on ZBC & Target cost given by Marketing costing team for Local & KD Vendors.
  • Supplier YoY Cost saving proposal initiation based on project volume
  • Supplier Development tracking and work effectiveness monitoring based on project timeline.
  • Monthly/Quarterly/Half yearly RM price monitoring and tracking based on MMR/SIAM Trend & working for available parts for handling vendors (Fe, Al, Special steel, Flat steel)
  • Alternate source Devt and De-risking initiation for Long term critical parts.
  • Production schedule release as per Project/variant wise based on demand.
  • Ensuring part receipt and supporting to Production Mgmt Team for critical parts supplies/Shortages
  • EO Change management Team representative for Critical and CR EO and driving the team for Devt, Sample submission till EPI Cut-off
  • Program Manager and TFT Member for New Projects [Powertrain and Vehicle]
  • Price working [ZBC] Initiated for Longtime Strategic price [Import price] to actual RM and Process norms

Senior Engineer

Tractors & Farm Equipment Limited
01.2021 - 08.2022
  • Zero Based cost working for Initial Business Case & Final Business case as per marketing requirements.
  • Project Handling,Drawing release and BOM supply for commodity team for project kick-off
  • Machining, Forging, Sheet metal parts development and price settlement as per organization norms.
  • Supplier RFQ Release and Receipt of Quotation.
  • Supplier RM & Process costing norms fixing and agreement sign off approval
  • Parts & Tool PO Release for assembly and child parts.
  • SPMs development for critical parts approval and supplies.
  • Supplier Development tracking and work effectiveness monitoring based on project timeline.
  • Parts ISIR & PPAP approval on coordination with SQA
  • Drawing ECN request for dimensional and performance change requirements with R&D.
  • Proto development of parts and tool to meet demand of timeline.
  • Production schedule release as per Project/variant wise based on demand.

Engineer

Mando Automotive India Pvt. Ltd.
09.2017 - 01.2021
  • Experience in New Product Development of Automotive Parts for Brake system and Suspension system
  • Preparing the Statement of Requirements (SOR); new parts drawing review and bench marking with similar models
  • Manufacturing feasibility review with suppliers
  • Ensured Supplier risk assessment, Supplier APQP, Process sign off, corrective action verification at supplier premises
  • Responsible for developing suppliers using the appropriate quality tools (APQP, FMEA, Error Proofing & 8D) and child parts Costing and Negotiations for Sheetmetal,Machining, Plastics and Rubber parts
  • Product follow-up (SOP+100 days), PPM tracking, corrective actions initiation and closure for inline & Customer complaints
  • Conducting manufacturing feasibility & design review jointly with relevant functional team & supplier to achieve the first time right- Sample approval
  • Eliminating Operator mistakes/ errors by implementing Fool-proofing / POKA YOKE in the fixtures & Dies at supplier ends. Monitor the Parts Quality with Continuous trials and controlling of rejections at the specified limits
  • Keeping a track of engineering records for various child parts and design changes
  • Development of Plastics, Rubber, Friction, Machining, Electronics, Sheet metal Welding parts for Brakes,Suspension strut and shock absorbers

Education

B.E. - Mechanical Engineering

Gojan School of Business and Technology, Anna University
Chennai
01-2017

12th - undefined

Jaya Matriculation Higher Secondary School
Chennai
01-2013

10th - undefined

Vijayanta Senior Secondary School
Chennai
01-2011

Skills

Cross-functional collaborator

New product development

Project Management

Stakeholder liaison

Product Costing

Quality improvement strategies

Certification

“GD & T” in 2018

Interests

Frequent information gatherer on Space/Aircraft engineering and rocketry, Cooking, Playing Chess and Badminton, Debating, Skimming News feed and social network

Timeline

Knowledge Associate

McKinsey & Company
09.2025 - Current

Manager

Hyundai Motor India Limited
08.2022 - 09.2025

Senior Engineer

Tractors & Farm Equipment Limited
01.2021 - 08.2022

Engineer

Mando Automotive India Pvt. Ltd.
09.2017 - 01.2021

12th - undefined

Jaya Matriculation Higher Secondary School

10th - undefined

Vijayanta Senior Secondary School

B.E. - Mechanical Engineering

Gojan School of Business and Technology, Anna University

Significant Highlights

  • Reduced the part cost (VAVE) by changing the Raw material with equalized properties and behavior and RM grade change (TPEE to TPV) , (SBR to EPDM), (PA66 to PP)
  • Reduced machine operation cycle time by fixture modification for Wheel cylinder Body machining
  • Implementation of Engineering change within a month in Brake Booster assembly to meet customer timeline and demand
  • Dual source component Development and Approval with shortest lead time [Crisis Management]
  • Localization of Bumper rubber, Body, Stopper rubber, Rod guide assy
  • Process capability (Ppk) Value improvement from 1.23 to 1.86 for welding dimension and Automatic SPC implementation
  • Sub Part elimination CR proposed for Transmission Fork shifter. Annual Savings : 2.7 Cr
  • RM change proposal for Aluminum grade (K14 ADC12) for Transmission application, Savings : Rs.25/Kg Annual : 3.5 Cr
  • Savings generated based on Ideation and VAVE | DtV Approach : 12 Cr

Organizational Projects

  • Hydraulic Brake Systems and Suspension Systems for Hyundai Santro New Gen
  • Hydraulic Brake Systems for Hyundai Venue
  • Hydraulic Brake Booster assembly for Maruti Suzuki Vitara Brezza Face lift
  • Hydraulic Brake systems and Suspension system for KIA Seltos
  • Suspension Strut with Modular Assembly for TATA Gravitas (7 Seater)
  • Engine : K1.5 TGDI,K1.2, U2 1.5 RDE, U2 1.5 BS6,K1.2T
  • Transmission: 5 Speed , 6 Speed, IMT, AMT
C.R MUNI SAI KIRANKnowledge Associate