Electrical and Electronic Engineer with 14 years of experience specializing in HVDC Network domains. Skilled in operation, project management, and service delivery. Expertise in managing complex projects and ensuring seamless operations within the electrical engineering field. Committed to delivering high-quality results and exceeding expectations in all work aspects.
Managed product valve projects, including converter and chopper valves, cooling subsystems, and DOIT.
End-to-end product delivery includes technical design, budget control, resource and schedule management, risk and opportunity management, purchase order management, vendor management, factory testing, and assembly.
G5 technology and Saudi Arabia-ENOWA as the customer.
Name of the project: NEOM 1 and 2.
Designing valve layers and structures for semiconductor BIGT, heat sink, bypass switch, cell electronics, and capacitors.
Participated in the tender phase, creating a budget for the next two seasons.
Project activity includes budget-controlled milestones and purchase order clearance.
Assigning resources according to project requirements.
Worked with an internal team to design converter valves, cooling, chopper, and DOIT based on project approval.
Effective time management is crucial when collaborating with other stakeholders, including the main project team, for valve interface input and requirements from Control & Protection, System Engineering, Plant Electrical, Civil, and Mechanical departments.
Conducted weekly meetings with internal teams to receive updates on valve, thermal and loss calculations, air clearance, design specifications, and seismic report delivery to meet valve space requirements.
Track the team's progress towards completing the Design Review Meeting DRM for all tasks.
Preparing the Requirement Specification (RS) to send to the supplier for a quote before releasing the purchase order.
Attended weekly sessions with HVDC's main project team.
Assist the team in completing the Design Review and meeting all task items for preparing the Requirement Specification (RS) to send to the supplier for a timely quotation and PO release.
Conducted weekly meetings with the HVDC project team to update valve status, risks, and mitigation.
Ensure the team completes the Design review and meets all task items.
Customers may choose between using ethylene or de-ionized water for valve cooling, depending on their country and environmental conditions. It will be designed and technologically clarified.
Test preparation included Dielectric Type, Wet Test, and Short Circuit.
RS for Pump & Treatment Unit, Cooler (including DRM), and MCC. • RS for VCSCS, including DRM, commissioning procedures, instructions, and records for valve cooling system.
Monitored project performance to identify areas for improvement and make necessary adjustments.
Project Scheduling