Owner: Hospet Steels Ltd., Hospet, Karnataka
Client: Praxair India (P) Ltd I Period: Jun '05 - Apr '06
The project dealt with fabrication & erection of cryogenic double walled Liquid Oxygen / Nitrogen (LOX/LIN) Storage Tanks; Erection of 400TPD Cold Box which is of 3 modules weighing 87MT, 105MT & 84MT, respectively.
Owner: Essar Steel Ltd., Hazira, Gujarat
Client: Essar Steel Ltd. I Period: Nov '04 - May '05
The project aimed at managing revamp jobs at Hot Briquetted Iron Plant – Module I, II & III at Essar Steel Ltd., Surat (Gujarat); It entailed dismantling and erection of charge hopper, octobus in furnace, dismantling & erection of reformer tubes - 100 Nos., bundles in recuperator, oxygen mixing chamber and various miscellaneous jobs.
Owner: Suzlon Energy Ltd., Sachin, Gujarat
Client: Suzlon Energy Ltd I Period: Jun '04 - Oct '04
The project was based on fabrication and assembly of 74.5 Mtr High / 105MT tubular tower for 1.25 MW Wind Mill Tubular Tower at Neo Structo, Sachin Manufacturing Unit.
Owner: ISPAT Industries Ltd., Dolvi, Maharastra
Client: Goyal MG Gases I Period: Sep '03 - May '04
The objective was to fabricate and erect 300 TPD Oxygen Plant for Goyal MG Gases; it involved erection of Cold Box, Reversible Heat Exchanger, Piping-Al., SS, CS-AG/UG; erection & alignment of Static and Rotary Equipment. Served as a Resident Construction Manager during project phase
Owner: Essar Steel Ltd., Hazira, Gujarat
Client: Essar Steel Ltd I Period: Sep '03 - May '04
The project work included fabricating Plant Structures for Galvanized and Cold Rolling Mill (CRM). It encompassed fabrication of columns, crane girder, rafters, monitor truss and purlins of approximately 10000MT
Owner: National Aluminium Company., Angul, Odisha
Client: Webb India Ltd. I Period: Feb '02 - Dec '02
The project was based on installation, testing and commissioning of 4” Overhead Power and Free Conveyor System under Webb India Ltd. The role was to anchor installation and alignment of 4” Overhead Power and Free Conveyor System for Green Anode Plant; installation and Alignment of equipment viz. load stations, unload stations, weigh station and carriers; alignment of power and free conveyor system for Anode Rodding Shop. Loop 1: Transferred good anode from GAP to Pot lines for making liquid alumina. Loop 2: Cleaned used anode in Pot Lines by passing through Bath Breaking Machine, Butt Shot Blast Machine and Butt Stripping Machine.
Owner: Essar Steel Ltd., Hazira, Gujarat
Client: Essar Steel Ltd I Period: Apr '01 - Jan '02
The project aimed at handling various Structural Fabrications for Downstream Complex, Cold Rolling Mill and Maintenance Work in Hot Strip Mill. Fabrication of structures for downstream complex, cold rolling mill and cooling panel for furnace was also part of duty. It involved managing maintenance tasks for Hot Strip Mill including replacement of down coiler, back up roll and pinch roll .
Owner: Suratgarh Thermal Power Station., Suratgarh, Rajasthan
Client: BHEL I Period: Jan '99 - Mar '01
The project work included erection and commissioning of 250MW Boiler, Supporting Structures, Pressure Parts, HP/LP Piping, Soot Blowers and Fuel Oil Piping under BHEL. Erected and aligned boiler supporting structures; erected pressure parts including water walls, economizer, reheater and steam super heater coils, HP/LP piping and fuel oil system of more than 9000MT.
Owner: Ford India Ltd., Chennai, Tamil Nadu
Client: Webb India Ltd. I Period: Jun '98 - Dec '98
Installed, tested and commissioned 6” Overhead Three Rail Conveyor System. The work included erection and alignment of equipment such as Conveyor Track and Track Components. Installed & aligned Synchronizer, Drive and Take-up System; installed carriers and tested entire system.
Owner: Essar Oil Refinery., Jamnagar, Gujarat
Client: Essar Projects Ltd I Period: Mar '98 - May '98
The project aimed at working on various Structural Fabrication and Erection Work of 30 to 40 mtr high lighting towers and flare stack structures
Owner: British Oxygen Company., Jamshedpur, Jharkhand
Client: Tata Construction & Projects Ltd I Period: May '97 - Feb '98
The project dealt with installation & commissioning of 1290 MTPD Cold Box, Heat Exchanger and Compressor Unit for Air Separation Unit of British Oxygen Company, Jamshedpur (Jharkhand). It included fabrication and erection of structural steel and casings for cold box of size 8m*9m*55m and Heat Exchanger Box
Oil & Gas: Reliance Industries Ltd. • IOCL • Worley • CPCL • Petrofac • ITT • BPCL • HPCL • MRPL • Zeeco • Tecnicas Reunidas • CINDA • Toyo Engineering India Ltd. • Technip Energies
Power: Doosan Power • Thyssenkrupp • Adani Group • Tata Constructions & Projects Ltd. • Suzlon Energy Ltd • BHEL
Fertilizer: GNFC • KRIBHCO • Tecnimont
Metallurgical: Essar Group • Ispat Industries Ltd. • NALCO • ANRAK
Cryogenic: Goyal Gases • Linde Process Tech. Ltd. • Praxair India Ltd. • British Oxygen Company
Automobile: Ford India Ltd I Webb India Ltd
Heavy Fabrication: L&T