Electrical Engineer
WISDRI Engineering & Research Corporation Ltd
Wuhan
12.2018 - 01.2022
- Installation of HT Panel (33 KV, 11KV, 6.6 KV), LT Panel.
- Installation of HT Transformer (11KV,6.6 KV), LT Transformer.
- Installation And Testing of HT Furnace Transformer (35MVA).
- Testing of LT Motor, I/O Testing, MCC, PCC, Control Scheme Checking.
- Installation of VFD, PLC, UPS Panel.
- HT And LT Breaker maintenance.
- Installation, Testing of Lighting work.
- Distribution and Termination of HT, LT, Instrumentation Cable.
- Installation, Testing of FDA System.
- Installation And Testing of CGA System.
- Installation And Testing Air washer, AHU.
- Preparation and checking of Bill of Quantity, Quality audit record and Safety audit record.
- Feedback/reporting on job planning, progress, documentation & application with clients.
- Preparing as Built Drawing as per the necessity.
- SMS-III secondary refining unit (Ladle furnace 1,2,3, A.R.S-1,2,3 And R.H) Bhilai Steel Plant, SAIL,Bhilai (C.G)