Dattatray Joshi

Sr.manager in transmission line projects / resourses and ROW activitiies
Bhadrawati

Summary

Project manager with extensive experience at Reliance Power Transmission Ltd, specializing in turnkey EPC project execution and construction oversight. Proven ability to enhance operational success through effective stakeholder collaboration and quality assurance implementation. Consistently drives efficiency and innovation while leading teams to meet and exceed project milestones.

Collaborative leader partners with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings.

Overview

24
24
years of professional experience
1
1
Language

Work History

Manager (Projects, Resources and ROW Activities)

Transrail Lighting Limited
09.2023 - Current
  • Developed and implemented strategies to improve operational efficiency and customer satisfaction.
  • Organized and monitored the workflow of daily operations to ensure the smooth functioning of the organization.
  • Supervised team members, established performance goals, provided feedback, and conducted performance reviews.
  • Facilitated communication between different departments within the organization for effective coordination.
  • Ensured compliance with safety standards during all phases of the production process.
  • Analyzed financial data to identify potential opportunities for cost savings, or revenue generation.
  • Prepared reports on various aspects of organizational operations for senior management review.
  • Built and maintained loyal, long-term customer relationships through effective account management.
  • Tracked supplies and products to maintain multi-site inventory with accuracy.
  • Directed safety operations and maintained a clean work environment to adhere to FDA and OSHA requirements.
  • Trained employees on duties, policies, and procedures.
  • Used strong issue resolution and communication skills to cultivate and strengthen lasting client relationships.
  • Based on the provided details and guidelines, here are the eight resume experience statements for the role of Manager (Projects & Resources) at Transrail Lighting Limited:
  • Streamlined project workflows by implementing resource allocation strategies, resulting in improved project completion times and efficiency.
  • Led cross-functional teams to successfully deliver multiple high-stakes projects, enhancing collaboration and execution across departments.
  • Developed and managed comprehensive project plans that aligned with organizational goals, ensuring timely delivery and adherence to budgets.

Sr. Manager - Projects

HG Power Transmission Sdn Bhd
12.2021 - 09.2023
  • Facilitated resolution of conflicts between team members when necessary.
  • Participated in cross-functional teams responsible for developing innovative solutions for complex problems.
  • Hg Power Transmission Sdn. Bhd.
  • Is a foreign company incorporated on March 23, 2006.
  • And its country of incorporation is Malaysia.
  • Hg Power Transmission Sdn Bhd
  • Bhd.'s Foreign Company Registration Number (FCRN) is F02710.
  • Its email address is amitverma@steelpro.co.in, and its registered address is 3A33, 4th.
  • Floor Block A, Kelana Centre Point, Jalan SS17.
  • Key Result Areas
  • Monitoring the entire construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize output, budgeting, labour compliance's, strategic planning, cash flow, and so on
  • Inviting, analyzing & accepting tenders, setting up terms of performance agreement, preparing bidding documents and managing procurement for departmental work
  • Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
  • Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
  • Administering the preparation of monthly progress reports entailing progress & details for engineering, procurement, construction & commissioning activities
  • Networking with architects, consultants, clients & contractors to ascertain technical specifications and construction related essentials, based on the prevalent rules
  • Identifying limitations / hold ups for progress of site works and coordinating to resolve the same
  • Participating in discussions with Owner/ Engineer regarding related site work progress, drawings, sequence of works, quality aspects, etc
  • Generating & submitting Daily / Weekly / Monthly Reports
  • Maintaining Site QA /QC records & submissions and preparing Red Mark Drawings
  • Leading, supervising, motivating, coaching & mentoring a team of Engineers, Technicians & Drafters; managing the performance of team and delegating project work
  • Directing:
  • Development of new concepts and technology for transmission lines
  • Development and review of transmission lines specifications and standards and identifies and implements engineering methods and procedures to improve design and construction efficiency
  • Implementation of consistent design standards throughout Ever source
  • Management oversight of external engineering contracts supporting transmission lines efforts
  • Scheduling of resources and tracking of performance
  • Preparation of regulatory approval applications for transmission lines
  • Preparation & approval of project cost estimates, project authorization costs, and schedules for transmission overhead and underground projects
  • Selection of routing for transmission lines, working closely with Ever source Sitting staff
  • Hg Power Transmission Sdn. Bhd. is a foreign company incorporated on March 23, 2006.

Head (Projects - Transmission)

Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission
11.2019 - 10.2021
  • Coordination of transmission engineering and design developmental activities with other
  • Transmission Engineering & Operations functions
  • Analysis & reporting of transmission system performance and bulk power system disturbances to Transmission Operations
  • Initiation, evaluation, and administration of engineering contracts related to transmission lines
  • Development, approval process & maintenance of engineering, design, construction, equipment, and material specifications and standards
  • Qualification of prospective supplier's equipment, materials, technical competence & production capabilities
  • Forecast of equipment and material needs, the initiation of bid solicitation by the
  • Purchasing & Materials Management group, and the technical evaluation of bids for equipment and materials
  • Interpretation and application of various regulations, codes, and standards pertaining to transmission lines
  • Representing ever source on various business-related committees, engineering societies, joint study groups and industry standards groups
  • Formulating & executing the Asset strategy for aging overhead and underground infrastructure
  • Working on a variety of transmission & distribution projects, with the liberty to take on a project management role as desired, MSETCL – Conversion of 132KV DC Transmission Line of 132kv UG Cable Work, Projects
  • UndertakenY Cable Project –MSETCL PUNE (For Sec.No.11, 1.1AA)
  • Joint Bay Construction -7nos–Joint Bay Construction Work for MSETCL Project Other
  • Employment and Labor Supply Work
  • OFC Cable laying including all excavation work, Laying of HDPE ducts splicing, OTDR testing
  • Commissioning of OFC for 48F OFC cable for of 132KV MSETCL Project of Civil & Erection
  • Work for underground cable laying

Senior Construction Manager

Reliance Power Transmission Ltd
12.2016 - 09.2019
  • V D/C Solapur – Karad LILO (143 km) (Successfully commissioning)KV D/C Solapur – Kolhapur TL (328 km)KV D/C Pune – Parli TL, Successfully commissioning on rated voltage)
  • Role:
  • Creating Monthly Reporting on various project activities at various sites
  • Interfacing with client on a daily basis and maintaining cordial relationship with them
  • Preparing cost effective design basis with respect to project specification & related codes
  • Developing master document list for civil activities
  • Performing: a
  • Civil design analysis and calculations as per the project requirements /DBR Ibd
  • Fie survey & investigate to prepare engineering drawings Review of Design Drawings c
  • Study of Construction Drawings and preparation for works
  • Carrying out analysis of design issues and recommending corrective actions Determining, the construction cost and material estimates based on civil designs
  • Planning & coordinating drawing availability for the required sequences with the Work
  • Sequences Reviewing & finalizing list of Material Submitting and coordinating & obtaining approvals Planning of Manpower, Work Sequences and Activities
  • Evaluating the Quantity of materials utilized and confirming with Drawings
  • Developing & reviewing design documentation & drawings in line with required sequence of civil site works and the over project time schedule
  • Evaluating& approving Shop Drawings and other site engineering documentation

Project Manager

Varsana Ispat Ltd
07.2013 - 11.2016
  • APPROVAL OF NHAI0) Detailed Survey (Modern Technique) and Plotting of profile
  • The line route worked out during the preliminary survey, with changes if any, is used as the reference
  • The measurements of the angle points are again done
  • These angles are indicated as Right (R) or Left (L) as per the direction of deviation with reference to the starting point
  • The levels of the ground profile along the route of the line are taken
  • The reduced level (R.L.) of the ground at the starting point of the line is taken as 100.00 meters.0) Plotting Of Profiles:
  • Tower Spotting, Span and Tower Schedule
  • Key Result Areas:
  • Contributed in assessment of quantities, rate analysis, etc
  • Dealt with techno–commercial aspect of the project, which involve preparation of billing to Client certification
  • Prepared BOQ, Reconciliation, Auto CAD Drawings, etc
  • Coordinated with Sub-contractor and Client
  • Report detailing about day-to-day work activities through daily work report from working site to head office
  • Supervised all day-to-day activities executed at site with quality & safety
  • Interacted with Vendors, Contractors and Electricity Boards
  • Managed overall responsibility from workplace until work completes
  • Created technical drafts & advice and coordinated in technical issues with Site Management Team
  • Administered the entire Material Management which involves material planning, scheduling & storing required for execution of work
  • Identified the problem areas & contractors' requirements of resources
  • Understood technical specifications, contractual terms & conditions and statutory requirement of bids, VIL) is a public Ltd
  • Company incorporated in the year
  • VIL started as an Internet Service Provider and a Rice Processor
  • Subsequently, VIL embarked on a project to set up an integrated steel plant at Varsana in Gandhidham (Kutch) in (Gujarat)
  • Projects Undertaken:
  • 400, D/C Phagi – HeerapuraTL (Successfully commissioning on rated voltage)
  • 400KV S/C Bikaner – Merta TL (Successfully commissioning on rated voltage)

Construction Manager

Reliance Power Transmission Ltd
11.2009 - 06.2013
  • Managed and coordinated the construction activities of multiple projects in the region.
  • Developed and implemented safety protocols for all construction sites.
  • Reviewed plans and specifications to ensure compliance with applicable codes, regulations, and standards.
  • Created detailed reports on project status, timelines, budgets, and any potential issues or risks.
  • Negotiated contracts with vendors for materials, equipment, and services needed for projects.
  • Coordinated with suppliers to obtain the necessary materials for ongoing projects.
  • Oversaw the hiring process of new employees, as well as provided training when needed.
  • Conducted regular inspections of job sites to identify potential hazards or safety violations.
  • Developed strategies for dealing with unexpected delays or cost overruns during the course of a project.
  • Prepared monthly summaries outlining the status of all active projects within the region.
  • Analyzed data from previous projects in order to improve efficiency on future builds.
  • Conducted walk-through inspections and other scheduled inspections with homeowners.
  • Developed and coordinated construction schedules to meet or exceed company goals.
  • Coordinated extensive planning, development of project milestones and budget for complex contracts.
  • Managed subcontractor selection, negotiation, and performance to ensure quality and efficiency.
  • Prepared detailed project reports, documenting phases, milestones, and final outcomes.
  • Oversaw daily on-site construction operations, ensuring projects met design specifications and safety standards.
  • Ensured compliance with local, state, and federal building codes and regulations.
  • Developed and maintained comprehensive project budgets, tracking expenditures against financial forecasts.
  • Completed investigations into complaints, incidents and accidents at work sites.
  • Coordinated phases of construction projects from inception to completion.

Asst Manager

Bajaj Electrical Ltd
04.2008 - 08.2009
  • A 75-years old trusted company with a turnover of Rs
  • 2763 crore, is a part of the US $7 billion (over INR 38,000 crore ) "Bajaj Group"
  • Project Undertaken:
  • MSETCL 220 KV D/C Ghatanji – Yavatmal TL; :
  • Supervising the entire Site Works and performing stage & final Inspections of Site Works
  • Executing site work as per approved shop drawing; ensuring effective implementation of all tests & inspection schedule and coordinating with various teams to perform quality audits on processes & controlling Sub Contractors Work Progress monitoring & controlling materials & stores
  • Conducted regular performance reviews for employees to identify areas of improvement.

Sr. Engineer

Instalaciones Inabensa SA, Power Grid Corporation Of India Ltd
06.2001 - 03.2008
  • C Baripada–Bhadrak TL, 179 Km)KV S, C Seoni– Riva TL (148Km) (Successfully Commissioning on rated-voltage) 765 KV Sub-Station Seoni (MP)
  • Role:
  • Engaged in site supervision, execution, material planning and erection of TL Line
  • Administered contractors and sustained site safety and quality of work as per standards
  • Governed a wide range of activities including site execution, planning
  • Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
  • Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
  • Fulfilled site statutory compliance's, maintained good relationship with client and contractors
  • Ensured accurate documentation and records for Client Inspection and Approvals
  • Contractor bill certification for work done with material reconciliation of material issue from site store Coordination and liaising with client, govt
  • Authority, Electrical Inspector and Locals
  • Acquired certification of contractor invoice for supply and execution and recommendation for payment Reported top management on likely delay and recommended methods to overcome delays
  • Managed overall responsibility from workplace until work completes
  • Initiation ,evaluation, and administration of engineering contracts related to transmission lines.

Education

AMIE - Civil Engineering

Kolkata University
Kolkata
01.2002

Diploma - Civil Engineering

Board Of Technical Education
01.2000

Secondary Examination - undefined

Board Of Sr. Sec. Education
Chandrapur
01.1995

Skills

Project management and construction oversight

Accomplishments

  • 220 kV Ongle - Kavali TL - 42KM for STERLITE in 2017 within 10 months.
  • Successfully completed special type foundation for 400 KV D/C Baripada - Bhadrak TL in 2006.
  • Completed 29 nos of foundation for 400 kV D/C Phagi - Hirapura TL in 2015 at Rajasthan.

Timeline

Manager (Projects, Resources and ROW Activities)

Transrail Lighting Limited
09.2023 - Current

Sr. Manager - Projects

HG Power Transmission Sdn Bhd
12.2021 - 09.2023

Head (Projects - Transmission)

Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission
11.2019 - 10.2021

Senior Construction Manager

Reliance Power Transmission Ltd
12.2016 - 09.2019

Project Manager

Varsana Ispat Ltd
07.2013 - 11.2016

Construction Manager

Reliance Power Transmission Ltd
11.2009 - 06.2013

Asst Manager

Bajaj Electrical Ltd
04.2008 - 08.2009

Sr. Engineer

Instalaciones Inabensa SA, Power Grid Corporation Of India Ltd
06.2001 - 03.2008

Diploma - Civil Engineering

Board Of Technical Education

Secondary Examination - undefined

Board Of Sr. Sec. Education

AMIE - Civil Engineering

Kolkata University