Sr.manager in transmission line projects / resourses and ROW activitiies
Bhadrawati
Summary
Project manager with extensive experience at Reliance Power Transmission Ltd, specializing in turnkey EPC project execution and construction oversight. Proven ability to enhance operational success through effective stakeholder collaboration and quality assurance implementation. Consistently drives efficiency and innovation while leading teams to meet and exceed project milestones.
Collaborative leader partners with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings.
Overview
24
24
years of professional experience
1
1
Language
Work History
Manager (Projects, Resources and ROW Activities)
Transrail Lighting Limited
09.2023 - Current
Developed and implemented strategies to improve operational efficiency and customer satisfaction.
Organized and monitored the workflow of daily operations to ensure the smooth functioning of the organization.
Supervised team members, established performance goals, provided feedback, and conducted performance reviews.
Facilitated communication between different departments within the organization for effective coordination.
Ensured compliance with safety standards during all phases of the production process.
Analyzed financial data to identify potential opportunities for cost savings, or revenue generation.
Prepared reports on various aspects of organizational operations for senior management review.
Built and maintained loyal, long-term customer relationships through effective account management.
Tracked supplies and products to maintain multi-site inventory with accuracy.
Directed safety operations and maintained a clean work environment to adhere to FDA and OSHA requirements.
Trained employees on duties, policies, and procedures.
Used strong issue resolution and communication skills to cultivate and strengthen lasting client relationships.
Based on the provided details and guidelines, here are the eight resume experience statements for the role of Manager (Projects & Resources) at Transrail Lighting Limited:
Streamlined project workflows by implementing resource allocation strategies, resulting in improved project completion times and efficiency.
Led cross-functional teams to successfully deliver multiple high-stakes projects, enhancing collaboration and execution across departments.
Developed and managed comprehensive project plans that aligned with organizational goals, ensuring timely delivery and adherence to budgets.
Sr. Manager - Projects
HG Power Transmission Sdn Bhd
12.2021 - 09.2023
Facilitated resolution of conflicts between team members when necessary.
Participated in cross-functional teams responsible for developing innovative solutions for complex problems.
Hg Power Transmission Sdn. Bhd.
Is a foreign company incorporated on March 23, 2006.
And its country of incorporation is Malaysia.
Hg Power Transmission Sdn Bhd
Bhd.'s Foreign Company Registration Number (FCRN) is F02710.
Its email address is amitverma@steelpro.co.in, and its registered address is 3A33, 4th.
Floor Block A, Kelana Centre Point, Jalan SS17.
Key Result Areas
Monitoring the entire construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize output, budgeting, labour compliance's, strategic planning, cash flow, and so on
Inviting, analyzing & accepting tenders, setting up terms of performance agreement, preparing bidding documents and managing procurement for departmental work
Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
Administering the preparation of monthly progress reports entailing progress & details for engineering, procurement, construction & commissioning activities
Networking with architects, consultants, clients & contractors to ascertain technical specifications and construction related essentials, based on the prevalent rules
Identifying limitations / hold ups for progress of site works and coordinating to resolve the same
Participating in discussions with Owner/ Engineer regarding related site work progress, drawings, sequence of works, quality aspects, etc
Maintaining Site QA /QC records & submissions and preparing Red Mark Drawings
Leading, supervising, motivating, coaching & mentoring a team of Engineers, Technicians & Drafters; managing the performance of team and delegating project work
Directing:
Development of new concepts and technology for transmission lines
Development and review of transmission lines specifications and standards and identifies and implements engineering methods and procedures to improve design and construction efficiency
Implementation of consistent design standards throughout Ever source
Management oversight of external engineering contracts supporting transmission lines efforts
Scheduling of resources and tracking of performance
Preparation of regulatory approval applications for transmission lines
Preparation & approval of project cost estimates, project authorization costs, and schedules for transmission overhead and underground projects
Selection of routing for transmission lines, working closely with Ever source Sitting staff
Hg Power Transmission Sdn. Bhd. is a foreign company incorporated on March 23, 2006.
Head (Projects - Transmission)
Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission
11.2019 - 10.2021
Coordination of transmission engineering and design developmental activities with other
Transmission Engineering & Operations functions
Analysis & reporting of transmission system performance and bulk power system disturbances to Transmission Operations
Initiation, evaluation, and administration of engineering contracts related to transmission lines
Development, approval process & maintenance of engineering, design, construction, equipment, and material specifications and standards
Qualification of prospective supplier's equipment, materials, technical competence & production capabilities
Forecast of equipment and material needs, the initiation of bid solicitation by the
Purchasing & Materials Management group, and the technical evaluation of bids for equipment and materials
Interpretation and application of various regulations, codes, and standards pertaining to transmission lines
Representing ever source on various business-related committees, engineering societies, joint study groups and industry standards groups
Formulating & executing the Asset strategy for aging overhead and underground infrastructure
Working on a variety of transmission & distribution projects, with the liberty to take on a project management role as desired, MSETCL – Conversion of 132KV DC Transmission Line of 132kv UG Cable Work, Projects
UndertakenY Cable Project –MSETCL PUNE (For Sec.No.11, 1.1AA)
Joint Bay Construction -7nos–Joint Bay Construction Work for MSETCL Project Other
Employment and Labor Supply Work
OFC Cable laying including all excavation work, Laying of HDPE ducts splicing, OTDR testing
Commissioning of OFC for 48F OFC cable for of 132KV MSETCL Project of Civil & Erection
Work for underground cable laying
Senior Construction Manager
Reliance Power Transmission Ltd
12.2016 - 09.2019
V D/C Solapur – Karad LILO (143 km) (Successfully commissioning)KV D/C Solapur – Kolhapur TL (328 km)KV D/C Pune – Parli TL, Successfully commissioning on rated voltage)
Role:
Creating Monthly Reporting on various project activities at various sites
Interfacing with client on a daily basis and maintaining cordial relationship with them
Preparing cost effective design basis with respect to project specification & related codes
Developing master document list for civil activities
Performing: a
Civil design analysis and calculations as per the project requirements /DBR Ibd
Fie survey & investigate to prepare engineering drawings Review of Design Drawings c
Study of Construction Drawings and preparation for works
Carrying out analysis of design issues and recommending corrective actions Determining, the construction cost and material estimates based on civil designs
Planning & coordinating drawing availability for the required sequences with the Work
Sequences Reviewing & finalizing list of Material Submitting and coordinating & obtaining approvals Planning of Manpower, Work Sequences and Activities
Evaluating the Quantity of materials utilized and confirming with Drawings
Developing & reviewing design documentation & drawings in line with required sequence of civil site works and the over project time schedule
Evaluating& approving Shop Drawings and other site engineering documentation
Project Manager
Varsana Ispat Ltd
07.2013 - 11.2016
APPROVAL OF NHAI0) Detailed Survey (Modern Technique) and Plotting of profile
The line route worked out during the preliminary survey, with changes if any, is used as the reference
The measurements of the angle points are again done
These angles are indicated as Right (R) or Left (L) as per the direction of deviation with reference to the starting point
The levels of the ground profile along the route of the line are taken
The reduced level (R.L.) of the ground at the starting point of the line is taken as 100.00 meters.0) Plotting Of Profiles:
Tower Spotting, Span and Tower Schedule
Key Result Areas:
Contributed in assessment of quantities, rate analysis, etc
Dealt with techno–commercial aspect of the project, which involve preparation of billing to Client certification
Prepared BOQ, Reconciliation, Auto CAD Drawings, etc
Coordinated with Sub-contractor and Client
Report detailing about day-to-day work activities through daily work report from working site to head office
Supervised all day-to-day activities executed at site with quality & safety
Interacted with Vendors, Contractors and Electricity Boards
Managed overall responsibility from workplace until work completes
Created technical drafts & advice and coordinated in technical issues with Site Management Team
Administered the entire Material Management which involves material planning, scheduling & storing required for execution of work
Identified the problem areas & contractors' requirements of resources
Understood technical specifications, contractual terms & conditions and statutory requirement of bids, VIL) is a public Ltd
Company incorporated in the year
VIL started as an Internet Service Provider and a Rice Processor
Subsequently, VIL embarked on a project to set up an integrated steel plant at Varsana in Gandhidham (Kutch) in (Gujarat)
Projects Undertaken:
400, D/C Phagi – HeerapuraTL (Successfully commissioning on rated voltage)
Managed and coordinated the construction activities of multiple projects in the region.
Developed and implemented safety protocols for all construction sites.
Reviewed plans and specifications to ensure compliance with applicable codes, regulations, and standards.
Created detailed reports on project status, timelines, budgets, and any potential issues or risks.
Negotiated contracts with vendors for materials, equipment, and services needed for projects.
Coordinated with suppliers to obtain the necessary materials for ongoing projects.
Oversaw the hiring process of new employees, as well as provided training when needed.
Conducted regular inspections of job sites to identify potential hazards or safety violations.
Developed strategies for dealing with unexpected delays or cost overruns during the course of a project.
Prepared monthly summaries outlining the status of all active projects within the region.
Analyzed data from previous projects in order to improve efficiency on future builds.
Conducted walk-through inspections and other scheduled inspections with homeowners.
Developed and coordinated construction schedules to meet or exceed company goals.
Coordinated extensive planning, development of project milestones and budget for complex contracts.
Managed subcontractor selection, negotiation, and performance to ensure quality and efficiency.
Prepared detailed project reports, documenting phases, milestones, and final outcomes.
Oversaw daily on-site construction operations, ensuring projects met design specifications and safety standards.
Ensured compliance with local, state, and federal building codes and regulations.
Developed and maintained comprehensive project budgets, tracking expenditures against financial forecasts.
Completed investigations into complaints, incidents and accidents at work sites.
Coordinated phases of construction projects from inception to completion.
Asst Manager
Bajaj Electrical Ltd
04.2008 - 08.2009
A 75-years old trusted company with a turnover of Rs
2763 crore, is a part of the US $7 billion (over INR 38,000 crore ) "Bajaj Group"
Project Undertaken:
MSETCL 220 KV D/C Ghatanji – Yavatmal TL; :
Supervising the entire Site Works and performing stage & final Inspections of Site Works
Executing site work as per approved shop drawing; ensuring effective implementation of all tests & inspection schedule and coordinating with various teams to perform quality audits on processes & controlling Sub Contractors Work Progress monitoring & controlling materials & stores
Conducted regular performance reviews for employees to identify areas of improvement.
Sr. Engineer
Instalaciones Inabensa SA, Power Grid Corporation Of India Ltd
06.2001 - 03.2008
C Baripada–Bhadrak TL, 179 Km)KV S, C Seoni– Riva TL (148Km) (Successfully Commissioning on rated-voltage) 765 KV Sub-Station Seoni (MP)
Role:
Engaged in site supervision, execution, material planning and erection of TL Line
Administered contractors and sustained site safety and quality of work as per standards
Governed a wide range of activities including site execution, planning
Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
Fulfilled site statutory compliance's, maintained good relationship with client and contractors
Ensured accurate documentation and records for Client Inspection and Approvals
Contractor bill certification for work done with material reconciliation of material issue from site store Coordination and liaising with client, govt
Authority, Electrical Inspector and Locals
Acquired certification of contractor invoice for supply and execution and recommendation for payment Reported top management on likely delay and recommended methods to overcome delays
Managed overall responsibility from workplace until work completes
Initiation ,evaluation, and administration of engineering contracts related to transmission lines.
Education
AMIE - Civil Engineering
Kolkata University
Kolkata
01.2002
Diploma - Civil Engineering
Board Of Technical Education
01.2000
Secondary Examination - undefined
Board Of Sr. Sec. Education
Chandrapur
01.1995
Skills
Project management and construction oversight
Accomplishments
220 kV Ongle - Kavali TL - 42KM for STERLITE in 2017 within 10 months.
Successfully completed special type foundation for 400 KV D/C Baripada - Bhadrak TL in 2006.
Completed 29 nos of foundation for 400 kV D/C Phagi - Hirapura TL in 2015 at Rajasthan.
Timeline
Manager (Projects, Resources and ROW Activities)
Transrail Lighting Limited
09.2023 - Current
Sr. Manager - Projects
HG Power Transmission Sdn Bhd
12.2021 - 09.2023
Head (Projects - Transmission)
Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission
11.2019 - 10.2021
Senior Construction Manager
Reliance Power Transmission Ltd
12.2016 - 09.2019
Project Manager
Varsana Ispat Ltd
07.2013 - 11.2016
Construction Manager
Reliance Power Transmission Ltd
11.2009 - 06.2013
Asst Manager
Bajaj Electrical Ltd
04.2008 - 08.2009
Sr. Engineer
Instalaciones Inabensa SA, Power Grid Corporation Of India Ltd