Carrying out all sort of running plant maintenance, including job allocation and manpower Handling
Scheduling of pre-planned shutdown & Major shutdown activities and execution and hand over of circuit after work completion on time
Looking after MHS circuit including stacker, reclaimer, Wagon Tippler, conveyors and other related equipments
Also looking after coal and raw material handling transportation group, which included belt Conveyor Maintenance
Reducing MTBF and MTTR of circuit by implementing proper planning and following proper maintenance practices.
Nuvoco Vistas Corp LTD
Jamshedpur
Asst. Manager Projects
09.2019 - 02.2021
Job overview
Responsible for fabrication & erection activities for structural & Equipment part of MHS Section related Equipments
Planning and scheduling of project and close monitoring of project as per the schedule for on time completion of project
Co-ordination between supplier and site team to ensure timely availability of resources and materials as per our planning of assembly & erection
To ensure fabrication & erection and commissioning of equipment's carried out as per the Industry standards
Co-ordination within Plant operations and TATA Power Material handling section to ensure no demurrage charges are laid on both organizations due to project erection activities on incoming & outgoing railway lines
Erection of Material Conveying system with all its auxiliaries from Wagon Tippler till Material yard and From Material Yard to Hopper Building Feeding.(Structural Fabrication & Equipment Erection- 2565 ton of Structural & 1215 ton of Equipment) supplied by M/s Methods
Erection & commissioning of 1500TPH Slag & Clinker Handling Wagon Tippler with Traverser & Ejector supplied by M/s L&T.
JSW CEMENT LTD
Salboni
Sr. Engineer Project
11.2016 - 09.2019
Job overview
Responsible for fabrication, erection, plant maintenance services, Repair & replacement activities, and annual shutdown services
Project Planning and discussion with Consultant and Equipment Supplier for Fly ash handling System with 1000 Ton PPC Silo and 5000 Ton Concreel Silo Erection and Equipment Finalization
Feasibility checking for plant up gradation from 2.4MTPA to 3.0MTPA
Execution and commissioning of MHS section for Roller Press Grinding Unit (2.4MTPA Plant) with all its auxiliaries including Stacker & Reclaimer, chain bucket elevators, De-dusting systems and other conveying systems
Planning and scheduling of project and close monitoring of project as per the schedule for on time completion of project
Maintenance and stabilizing of MHS section with all its auxiliaries
To ensure fabrication, erection and commissioning of equipment's carried out as per the Industry standards.
GCIPL, Dang- Nepal
Engineer Mechanical
03.2013 - 11.2016
Job overview
Looking after MHS circuit including stacker, reclaimer, horizontal ball mill (KHD Supplied-185TPH), conveyors and other related equipments
This included belt Conveyor Maintenance
Also looking after coal and raw material handling transportation group, over all condition monitoring of whole plant mechanical equipment's to find out any abnormalities
Monitor and control the inventory of spare parts of all section to keep the inventory at optimum levels and reduce inventory cost
Replacement of LNVT Supplied Cement mill trunion bearing & White metal bearing scrapping
Fabrication, Erection & Commissioning of Roller Press RPZ supplied by M/s KHD and other cement plant machineries including steel structure for galleries and to upgrade Existing Cement Grinding Capacity.
AZAD FABRICATORS PVT LTD BEAWAR
Ghorahi, Dang District, Nepal
Supervisor
06.2012 - 03.2013
Job overview
Handling machine and man power
Scheduling and planning of machines and material handling