Overview
Work History
Timeline
Hi, I’m

Debabrata Das

Jamshedpur,Jharkhand

Overview

12
years of professional experience

Work History

Nuvoco Vistas Corp LTD
Jamshedpur

Asst. Manager Mech. Maint.
03.2021 - Current

Job overview

  • Carrying out all sort of running plant maintenance, including job allocation and manpower Handling
  • Scheduling of pre-planned shutdown & Major shutdown activities and execution and hand over of circuit after work completion on time
  • Looking after MHS circuit including stacker, reclaimer, Wagon Tippler, conveyors and other related equipments
  • Also looking after coal and raw material handling transportation group, which included belt Conveyor Maintenance
  • Reducing MTBF and MTTR of circuit by implementing proper planning and following proper maintenance practices.

Nuvoco Vistas Corp LTD
Jamshedpur

Asst. Manager Projects
09.2019 - 02.2021

Job overview

  • Responsible for fabrication & erection activities for structural & Equipment part of MHS Section related Equipments
  • Planning and scheduling of project and close monitoring of project as per the schedule for on time completion of project
  • Co-ordination between supplier and site team to ensure timely availability of resources and materials as per our planning of assembly & erection
  • To ensure fabrication & erection and commissioning of equipment's carried out as per the Industry standards
  • Co-ordination within Plant operations and TATA Power Material handling section to ensure no demurrage charges are laid on both organizations due to project erection activities on incoming & outgoing railway lines
  • Erection of Material Conveying system with all its auxiliaries from Wagon Tippler till Material yard and From Material Yard to Hopper Building Feeding.(Structural Fabrication & Equipment Erection- 2565 ton of Structural & 1215 ton of Equipment) supplied by M/s Methods
  • Erection & commissioning of 1500TPH Slag & Clinker Handling Wagon Tippler with Traverser & Ejector supplied by M/s L&T.

JSW CEMENT LTD
Salboni

Sr. Engineer Project
11.2016 - 09.2019

Job overview

  • Responsible for fabrication, erection, plant maintenance services, Repair & replacement activities, and annual shutdown services
  • Project Planning and discussion with Consultant and Equipment Supplier for Fly ash handling System with 1000 Ton PPC Silo and 5000 Ton Concreel Silo Erection and Equipment Finalization
  • Feasibility checking for plant up gradation from 2.4MTPA to 3.0MTPA
  • Execution and commissioning of MHS section for Roller Press Grinding Unit (2.4MTPA Plant) with all its auxiliaries including Stacker & Reclaimer, chain bucket elevators, De-dusting systems and other conveying systems
  • Planning and scheduling of project and close monitoring of project as per the schedule for on time completion of project
  • Maintenance and stabilizing of MHS section with all its auxiliaries
  • To ensure fabrication, erection and commissioning of equipment's carried out as per the Industry standards.

GCIPL, Dang- Nepal

Engineer Mechanical
03.2013 - 11.2016

Job overview

  • Looking after MHS circuit including stacker, reclaimer, horizontal ball mill (KHD Supplied-185TPH), conveyors and other related equipments
  • This included belt Conveyor Maintenance
  • Also looking after coal and raw material handling transportation group, over all condition monitoring of whole plant mechanical equipment's to find out any abnormalities
  • Monitor and control the inventory of spare parts of all section to keep the inventory at optimum levels and reduce inventory cost
  • Replacement of LNVT Supplied Cement mill trunion bearing & White metal bearing scrapping
  • Fabrication, Erection & Commissioning of Roller Press RPZ supplied by M/s KHD and other cement plant machineries including steel structure for galleries and to upgrade Existing Cement Grinding Capacity.

AZAD FABRICATORS PVT LTD BEAWAR
Ghorahi, Dang District, Nepal

Supervisor
06.2012 - 03.2013

Job overview

  • Handling machine and man power
  • Scheduling and planning of machines and material handling
  • Finding out breakdowns and rectifying timely
  • Maintaining machine availability
  • Maintaining good housekeeping.

Timeline

Asst. Manager Mech. Maint.

Nuvoco Vistas Corp LTD
03.2021 - Current

Asst. Manager Projects

Nuvoco Vistas Corp LTD
09.2019 - 02.2021

Sr. Engineer Project

JSW CEMENT LTD
11.2016 - 09.2019

Engineer Mechanical

GCIPL, Dang- Nepal
03.2013 - 11.2016

Supervisor

AZAD FABRICATORS PVT LTD BEAWAR
06.2012 - 03.2013
Debabrata Das