Summary
Overview
Work History
Education
Skills
Timeline
Generic

Debakanta Mishra

E-4/102 , Aditya Aluminium Township,Lapanga , Sambalpur

Summary

A Competent Professional with 13 Years of experience in operation of thermal power plant. Experience in Running of 900 MW (6*150 MW) of BHEL Make units & 2400 MW (4*600MW) of Sepco Make Unit.

Knowledge of the operation of high-pressure boilers and turbine related mechanical equipment. An out-of-box thinker with proven record of handling emergencies operation & involvement in Focused Area.

Overview

13
13
years of professional experience
8
8
years of post-secondary education
3
3
Languages

Work History

Deputy Manager

Aditya Aluminum, Hindalco Industries Limited
6 2014 - Current
  • Firsthand experience in Boiler & Turbine DCS Operation of 6X150 MW unit.
  • Attending emergencies in shifts during Island operation, house load operation, HT equipment failures.
  • Calculation and Participation in reduction of APC (Auxiliary Power Consumption)
  • Optimizing consumption of assets during unit light-up and normal running conditions.
  • Preparing Start-up reports, Trip reports, analyzing SOE's and preparing RCA & FIR of trips.
  • Coordinating annual overhauling of units.
  • Properly isolating Equipment for maintenance activities, providing necessary tags for mechanical parts& necessary locks for HT equipment breakers, Full knowledge in maintaining PTW System, Shift Logs & Work Orders.
  • Developing operational solution by defining, studying, estimating, and screening alternative solution, determining impact on total system.
  • Preparing monthly Progress report for the operation department.
  • Preparing daily Plant Heat Rate deviations reports.
  • Taking part various safety and BCE audit in BOP and BTG area ..

Engineer

Steag Energy Services, Sterlite energy Limited
06.2011 - 06.2014
  • Responsible for operation of 4x600 MW IPP.
  • Ensure safe operations of the plant during start- up and shut-down.
  • Responsible for troubleshooting of operational related issues in boiler and auxiliaries.
  • Attending emergencies in grid problems, house load operations, HT equipment failures maintaining ABT (Availability base tariff) according to load schedule by grid.
  • Monitor safe plant operation during load through off to control generation as per requirement.
  • Safely handle the permit to work system, visit site and understand the nature of work before giving permit.
  • Take part in annual overhauling of unit.
  • Analyzing the trends comparing with PADO model for economic and efficient optimization.

Education

Post graduate diploma - thermal power plant engineering

NPTI
NANGAL
08.2010 - 08.2011

B.TECH - Electronics And Telecommunication Engineering

Silicon Institute of Technology Under Biju Patnaik University of Technology
BHUBANESWAR
07.2004 - 08.2008

+2 Science - Council of Higher Secondary Education Board

Ispat Vidyamandir
Rourkela
06.2001 - 04.2003

10TH - Board Secondary Education

Chinmaya Vidyalaya
Rourkela
06.2000 - 03.2001

Skills

Power Plant Operation

undefined

Timeline

Engineer

Steag Energy Services, Sterlite energy Limited
06.2011 - 06.2014

Post graduate diploma - thermal power plant engineering

NPTI
08.2010 - 08.2011

B.TECH - Electronics And Telecommunication Engineering

Silicon Institute of Technology Under Biju Patnaik University of Technology
07.2004 - 08.2008

+2 Science - Council of Higher Secondary Education Board

Ispat Vidyamandir
06.2001 - 04.2003

10TH - Board Secondary Education

Chinmaya Vidyalaya
06.2000 - 03.2001

Deputy Manager

Aditya Aluminum, Hindalco Industries Limited
6 2014 - Current
Debakanta Mishra