A competent and result oriented professional with 11+ years of experience in: -Structure Fabrication & Erection –Piping Fabrication & Erection – Fire Protection System Installation – Storage tank Fabrication & Erection – Equipment Installation Good Exposure to construction activities in different Industrial Sectors: –Power Plants–Oil & Gas –Cement Plants –Chemical Plants –Breweries–Food & Beverages(FMCG Industry). Possess a flair for working hard and contributing towards achievement of organizational goals Adept at handling day to day site activities for ensuring smooth production. Experience in updating data to maintain departmental records and databases. An effective communicator with exceptional interpersonal skills.
Work History
Discipline Lead
1 Year 11 Months
L&T Technology & Services Ltd. | 07.2024 - Current
Being the primary point of contact for project stakeholders, including clients & contractors.
Manage and oversee the day-to-day construction progress of the project in site.
Forecasting requirement of material, manpower and tools & tackles as per work front & project requirements.
Overseeing the technical aspects of a specific engineering discipline (like structural, equipment, or piping) on a project, ensuring quality standards are met, technical deliverables are completed on time.
To follow up with the stakeholders for materials delivery at site to complete the job within set timeline.
Keeping track record of increasing of quantity w.r.t BOQ and inform the same client for amendment.
Presenting technical solutions to clients and addressing their concerns related to the assigned discipline.
Collaborating with client stakeholders to ensure project requirements are clearly understood and met.
Ensure compliance with project standards and specifications and all changes to jobs scope and drawings are documented and updated.
Adherence to proper safety procedures during execution as per the defined HSE guidelines.
Raising of RFI (Request for information) to design team for any design issues, discrepancies, or missing information within project documents like drawings or specifications.
Review and approval of the Inspection & Test plan (ITP) and work procedures submitted by contractors.
Inspection of incoming materials at site for the contractors and preparation of IMIR reports for the same by contractor QC personnel.
Implementing quality control procedures within discipline to ensure design accuracy and compliance with project specifications.
Reporting of deficiencies in the form of observation quality aspects (OQA) regarding quality of the work.
Preparation of punch lists/snag lists after completion of any building and get it closed by vendors.
Preparation and correction of BOM (Bill of Material) according to its detail and design drawings.
Checking and certification of measurement sheet and RA bills of stakeholders.
PROJECT: Extension of food processing unit (L4 Line Expansion), Mehsana, Gujarat.
Client: McCain Foods India Ltd.
Owner: McCain Foods India Ltd.
Job Profile: Fire Protection System Piping and Utilities equipments(Boiler, Air compressor) installation and its connected piping.
Manage and oversee the day-to-day construction progress of the project in site.
Study of erection drawings for sequential erection and consult with the fabrication team to follow as per erection sequence.
Making monthly plan for Erection and sending to client.
Maintaining records of materials received from fabrication department and materials used at site.
To follow up materials so as to complete the job within stipulated time.
Monitor and report project details to the project management, including progress, risks, and opportunities in a timely manner.
Ensure all changes to specifications, jobs scope and drawings are documented and updated.
Coordinate with the project management team to formulate the most cost-effective plans and implement the execution of this plan afterwards.
Coordinate with planning and projects teams for availability of resources at required time such as crane, hydra and other manpower resources.
Preparing Protocols for different inspections which are required for billing.
Preparation and correction of BOM(Bill Of Material) according to its detail and design drawings.
Checking and certification of measurement sheet and RA bills of subcontractor.
PROJECT: Vacuum Gas Oil (VGO) Unit in Refinery Project
Client: Engineers India Ltd.
Owner: HPCL Rajasthan Refinery Limited
Profile: Erection Of Structure.
Project Co-ordinator
1 Year 4 Months
Lansh Engineering Pvt Ltd. | 02.2021 - 06.2022
Making monthly & weekly plan for Fabrication and Erection and send to client.
Coordinate with the project management team to formulate the most cost-effective plans and implement the execution of this plan afterward.
Monitor and report project details to the project management, including progress, risks, and opportunities in a timely manner.
Ensure all changes to specifications, jobs scope and drawings are documented and updated.
Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance.
Performing estimation of quantities(BOQ) along with the order of materials.
Follow up of procurement of indented materials with purchase Dept.
Raising of invoices to client and following up of for release of payment.
Checking and certification of bills and invoices from vendors and contractors.
Manage risks related to the site or any kind of defect that lead to delivery of the project.
Prepare and supervise all the needed documents properly throughout the project life cycle until the project closeout.
PROJECT: Capacity Enhancement Project of Balkrishna Industries Ltd.(BKT)
Client: Balkrishna Industries Ltd.
Owner: Balkrishna Industries Ltd.
Profile: Fabrication and Erection of Bag Collector.
Sr. Project Engineer
10 Months
Achintyo Engineering LLP | 03.2020 - 01.2021
To follow up materials to meet execution requirements.
Coordination with Client, TPI and other concern department to fulfill the execution QC activities and complete within schedule as per production planning.
Material inspection of materials& review MTC's as per applicable codes & specifications.
Control of all kind of resources and coordinate with construction manager on execution of work and ensure productivity.
To carry out erection of fabricated spools in appropriate positions using crane or other lifting devices as per piping Layout drawings and Isometric drawings.
Co-ordinate with the consultant personnel for the modification of Isometric drawings, plans and GAD matches with the P & IDs and the revision control.
Familiar in erection of hook up spools in utility station and pumps, vessels and heat exchangers.
Inspection of piping components like flanges, fittings, pipes and Piping valves and report any discrepancy noted at site to the client.
Quality jobs-Fit-up inspection, Weld visual inspection, different types of NDT methods just like DPT(Dye-penetrant Test) inspection, RT(Radiography Test) inspection of welding joints of Tanks as per design codes API 650,ASME SEC VIII- DIV I & II and ASME SEC IX.
Monitoring welding and prepare the RFI and Reports of welding and get approved by client.
Witness of Hydro test, Pneumatic test of storage tanks.
Documentation and making daily records of ongoing jobs and welding items.
Preparing nesting / cutting plans for plasma CNC cutting machine by using FASTCAM software.
Maintaining and making internal inspection reports for different inspections which are required for billing.
PROJECT: Wipro Personal And Homecare Pvt. Ltd. and Hindusthan UniLever Ltd
Client: Wipro Personal And Homecare Pvt. Ltd. and Hindusthan UniLever Ltd.
Owner: Wipro Personal And Homecare Pvt. Ltd. and Hindusthan UniLever Ltd.
Job Profile: Fabrication and Erection of Piping and equipments.
Project Engineer
2 Months
Randen Engineering Pvt. Ltd. | 01.2020 - 03.2020
Provide technical support to the operation of piping works and ensure that piping fabrication and erection, inspection and testing meet the project specification.
Control of all kind of resources and coordinate with construction manager on execution of work and ensure productivity.
To carry out erection of fabricated spools in appropriate positions using crane or other lifting devices as per piping Layout drawings and Isometric drawings.
Co-ordinate with the consultant personnel for the modification of Isometric drawings, plans and GAD matches with the P & IDs and the revision control.
Familiar in erection of hook up spools in utility station and pumps, vessels and heat exchangers.
Inspection of piping components like flanges, fittings, pipes and Piping valves and report any discrepancy noted at site to the client.
Prepare weekly, monthly schedule that needs to be submitted to the client for review and inputs to draw up the final execution of piping department.
Preparation of DPR and sending it to client.
Maintaining and making Protocols for different site inspections which are required for billing.
Checking of measurement sheet and RA bills of both subcontractor and client.
PROJECT: Capacity Enhancement Project of Dove plant
Client: Lakme Lever Private Ltd. (A Subsidiary Of Hindustan Unilever Limited.)
Owner: Lakme Lever Private Ltd.
Consultant: L & T Technology Services Pvt. Ltd.
Job Profile: Fabrication and Erection of Piping and equipments.
Making weekly plan for Fabrication and send one copy to our planning dept. and one to client.
To allocate manpower gang wise and assign them different jobs so as to achieve the scheduled plan.
Study of erection drawings for sequential erection and consult with the assembly team to follow as per erection sequence.
Control of all kind of resources and coordinate with construction manager on execution of work and ensure productivity.
To conduct hydrotest of jacket and tanks of UT(Unit Tanks) and BBT(Bright Beer Tanks).
Co-ordinate with the consultant personnel for the modification of Isometric drawings, plans and GAD matches with the P & IDs and the revision control.
Fabrication of Copper piping by Brazing technique and Performing Nitrogen test of the Copper pipelines.
Familiar in erection of hook up spools in utility station and pumps, vessels, Adjunct kettle along with agitator.
Inspection of piping component like flanges, fittings, pipes and Piping valves and report any discrepancy noted at site to the client.
Preparing inspection reports for different inspections which are required for billing.
PROJECT: Namagay Artisanal Brewery, Bhutan.
Client: Namagay Artisanal Brewery, Bhutan.
Owner: Namagay Artisanal Brewery, Bhutan.
Job Profile: Installation of Unit Tanks and its connected Piping.
Project Engineer
1 Year 2 Months
United Systems & Projects(I) Pvt. Ltd. | 10.2017 - 12.2018
Field engineering inspection and supervision in the area of piping works and ensuring implementation and adherence to project specifications and procedures.
Provide technical support to the operation of piping works and ensure that piping fabrication and erection, inspection and testing meet the project specification.
Continuously check and review the changes in status during the work.
Control of all kind of resources and coordinate with construction manager on execution of work and ensure productivity.
To carry out erection of fabricated spools in appropriate position using crane or other lifting devices as per piping Layout drawings and Isometric drawings.
Co-ordinate with the consultant personnel for the modification of Isometric drawings, plans and GAD matches with the P & IDs and the revision control.
Familiar in erection of hook up spools in utility station and pumps, vessels and heat exchangers.
Inspection of piping component like flanges, fittings, pipes and Piping valves and report any discrepancy noted at site to the client.
Prepare weekly, monthly schedule that needs to be submitted to the client for review and inputs to draw up the final execution of piping department.
Preparation of DPR and sending it to client.
Maintaining and making Protocols for different site inspections which are required for billing.
Checking of measurement sheet and RA bills of both subcontractor and client.
PROJECT: Revamp And Capacity Enhancement Project Of Delayed Coker Unit(DCU) Of Bharat Oman Refinery Ltd.(BORL)
Client: Anwesha Engineering and Projects Ltd.
Owner: Bharat Oman Refinery Ltd.
Consultant: Engineers India Ltd.
Job Profile: Fabrication and Erection of Piping and equipments.
Site(Quality) Engineer
11 Months
Samarth Erectors | 11.2016 - 10.2017
To follow up materials to meet execution requirements.
Coordination with Client, TPI and other concern department to fulfill the execution QC activities and complete within schedule as per production planning.
Preparation of QAP as per drawing and specification and inspection and monitoring of activities in compliance with approved QAP.
Material coordination inspection of materials & review MTC's as per applicable codes & specifications.
Quality jobs-Fit-up inspection, Weld visual inspection, different types of NDT methods just like DPT(Dye-penetrant Test) inspection, RT(Radiography Test)inspection of welding joints of Tanks as per design codes API 650,ASME SEC VIII- DIV I & II and ASME SEC IX.
Monitoring welding and prepare the RFI and Reports of welding and get approved by client.
Witness of Hydro test, Pneumatic test, Chalk-kerosine test of storage tanks.
Witness of WQT and review welder performance record so as to implement approved welders for job.
Preparation of WPS, PQR and WPQ and get it approved by TPI.
Documentation and making daily records of ongoing jobs and welding items.
Maintaining and making internal inspection reports for different inspections which are required for billing.
Regular checking of Electrodes Baking, Holding and Quiver Ovens.
Checking of measurement sheet and RA bills of both subcontractor and client.
PROJECT: BASF India Ltd. and Balaji Formalin Pvt. Ltd.
Client: BASF India Ltd. and Balaji Formalin Pvt. Ltd.
Owner: BASF India Ltd. and Balaji Formalin Pvt. Ltd.
Job Profile: Fabrication of Storage Tanks and Piping.
Quality Engineer
1 Year 1 Month
Dynamic S.S. Engineering Company Pvt. Ltd. | 10.2015 - 11.2016
Study of erection drawings for sequential erection and consult with the assembly team to follow as per erection sequence.
To conduct different types of inspections by client -Fit-up and Alignment inspection as per drawings specification.
Quality jobs-Weld visual inspection, different types of NDT methods just like DPT(Dye-penetrant Test) inspection, UT(Ultrasonic Test) inspection of welding joints.
Documentation and making daily records of ongoing jobs and welding items.
Performing Welder’s Test so as to approve and implement qualified welders in jobs.
Maintaining and making Protocols for different inspections which are required for billing.
Checking of measurement sheet and RA bills of subcontractor.
Preparation of client bill that is to be submitted at the end of each month.
PROJECT: 2x660 MW SuperThermal Power Plant
Client: Thyssen-krupp Industries India Pvt. Ltd.
Owner: Thermal Powertech Corporation India Ltd.
Job Profile: CHP Structure Erection and Coal Bunker Assembly & Erection in Boiler.
Making monthly plan for Fabrication and send one copy to our planning dept. and one to client.
To allocate manpower gangwise and assign them different jobs so as to achieve the scheduled plan.
Maintaining records of materials received from client and materials used at site.
To follow up materials so as to complete the job within stipulated time.
Coordination with Client, TPI and other concern department to fulfill the execution QC activities and complete within schedule as per production planning.
To conduct different types of inspections by client -Fit-up and Alignment inspection as per drawings specification.
Preparing Protocols for different inspections which are required for billing.
Preparation and correction of BOM(Bill Of Material) according to its detail and design drawings.
Checking of measurement sheet and RA bills of subcontractor.
PROJECT: 3x 800 MW NTPC SuperThermal Power Plant
Client: Doosan Heavy Industries and Construction Pvt. Ltd.
Owner: NTPC
Position: Engineer
Job Profile: Erection Of Structure and Ducting in Boiler.
Graduate Engineer Trainee
11 Months
L & T POWER | 12.2013 - 11.2014
Making monthly plan for Fabrication and send one copy to our planning dept. and one to client.
To allocate manpower gangwise and assign them different jobs so as to achieve the scheduled plan.
Maintaining records of materials received from client and materials used at site.
To follow up materials so as to complete the job within stipulated time.
Coordination with Client, TPI and other concern department to fulfill the execution QC activities and complete within schedule as per production planning.
To conduct different types of inspections by client -Fit-up and Alignment inspection as per drawings specification.
Jagannath Institute of Engineering &Technology | Jagatpur, Cuttack, Odisha | 01-2010
from B.P.U.T, Odisha
GPA: 7.16
12th - Science Stream
Indravati Project College | Khatiguda, Odisha | 01-2006
from C.H.S.E, Odisha
GPA: 76.4%
10th
Indravati High School | Khatiguda, Odisha | 01-2004
from B.S.E, Odisha
GPA: 82.3%
Skills
ASNT NDT Level- II in UT
RT
LPT & MPT.
AutoCAD.
SolidWorks.
MS Project.
Primavera-P6.
Six Sigma-Green Belt
Well versed in computer & Internet Applications and MS Office (Excel
Word
Outlook
Powerpoint).
Sound Knowledge of Navisworks software for 3D Model review.
EXTRACURRICULAR ACHIEVEMENTS
Won FIRST prize in District Level in Odisha State Talent Scholarship(OSTS) Examination and rewarded as “Zilla Chhatra Gourab” in 2001. Successfully completed the Training on “Working at Height and Lifting Operations” and received Certification from “British Safety Council” in 2024 while working with Tata Projects Limited. Won FIRST prize in District Level in Odisha State Talent Scholarship(OSTS) Examination and rewarded as “Zilla Chhatra Gourab” in 2001. Successfully completed the Training on “Working at Height and Lifting Operations” and received Certification from “British Safety Council” in 2024 while working with Tata Projects Limited.
DECLARATION
In view of the above, I request you to give me an opportunity to work in your esteemed organization. All the informations furnished above are true, complete and correct to the best of my knowledge and belief. Place: Bharuch, Gujarat Date: 2026-02-22 Signature
PERSONAL STRENGTH
Hard working: For me, there is no substitute of hard work.
Adaptability: I make myself the way environment around me.
Patience: Patience is the essential key to hardship.
Punctuality: I want all my work to be done in time.
Discipline: Because a disciplined person can do everything in his life.