Persuasive & influential professional with 9+ years of comprehensive experience in Electrical Relay Testing & Commissioning, Substation testing, Solar power plant Testing & commissioning, Operation & Maintenance, Rectifier & switchyard ,Area Substation, Thermal power plant operations, Ro Plant maintenance, WTP, STP, ME, DM Plant maintenances, Management, Resources Planning, Liosioning and Billing.
Worked in continuous running Air Separation Unit of 850 TPD to provide
continuous supply of Gaseous oxygen and nitrogen to IOCL naphtha
cracker plant.
• Operation and maintenance of HT (11KV) & LT switchgears, equipment
like 35MVA Power transformer, 2MVA & 400KVA distribution
transformer, 12000KW HV motors, LV motors, battery charger & 35KVA
UPS, 800KW regeneration heater, Starters -DOL, Start Delta, Variable
speed drives.
• Maintaining safety, reliability and efficiency of plant through
implementation of maintenance plan in adherence with AL guidelines.
• Prepare annual maintenance plan for Electrical equipment based on
historical performance, vendor manuals, AL group guidelines.
• Perform RCA for the technical & safety incidents and take corrective
actions to prevent recurrence.
• Prepare list of spare parts for procurement (based on SPM selection
matrix, OEM recommendation and VS study), ensure timely availability
of spares to perform PM and TAR maintenance.
• Raise and track purchase request; raise an alert to Maintenance In-
charge for any delay in the procurement process.
• Participate in quarterly maintenance audit conducted by CRT and close
audit non-conformities in definite time.
Quality Management
Operations & Maintenance
Site Management
Troubleshooting/Root Cause Analysis Quality Assurance & Failure Analysis
Client Management
Resource Optimization
Equipment maintenance and repair
Preventive Maintenance
Root-cause analysis
Cost estimation
Technical troubleshooting
[Type] equipment installation