Serving the power Industry that challenges my expertise and provides an opportunity for Professional growth.
Overview
1
1
Certification
21
21
years of professional experience
Work History
Operation Manager
Rungta Mines LTD, KAMANDA STEEL PLANT
10.2025 - Current
Working as a operation manager in its 2x65MW CAPACITY OF 6x75.5tph (WHRB boiler),make ISGEC ,LIMITED. Working pr.- 120 KG/CM2 Temp.= 540±5C and with same pressure and temp. For T.G set capacity of 2X65 M.W make BHEL limited
STEAG O & M company pvt. Ltd. (JV OF Hinduja Energy Ltd.)
06.2014 - 09.2025
Worked with STEAG O & m company pvt. Ltd ( joint venture of STEAG energy service(India)pvt. And HINDUJA energyLtd.),Palavalasa,Visakhapatnam as manager in its 2x5250MW ,Thermal power plant consists of : Having P.F.B.C boiler make BHEL, make,controlled circulation,Balanced Draft, Dry Bottom,Tangential Fired.With working pr.-178 kg/cm2, Temp.-540c and 2x1700 tph, TURBINE :BHEL make, Three Cylinder Reheat Condensing Turbine. GENERATOR: BHEL make, 21 KV,STATOR water & ROTOR hydrogen cooled.
Senior Engineer
Indian metals and ferro alloys limited(2x60M.W)
08.2011 - 06.2014
Worked with Indian metals and ferro alloys limited,choudwar,cuttack,Orissa as senior engineer in its 2x60M.W power plant consists of: Having C.F.B.C boiler make (Thermax industries limited) 2x240 tph, Working pr.- 120 bar, Temp.= 535±5C and with same pressure and temp. For T.G set capacity of 60 M.W make Hanju steam turbine limited.
Senior Engineer
M/S Bhushan Steels Limited(1x20 M.W,3X9 M W)
12.2009 - 08.2011
Worked with M/S Bhushan Steels Limited, Meramundali, Dhenkanal, Orissa as Senior engineer Power Plant in its 1x20 MW, 3X9MW. Having A.F.B.C. boiler make (2 nos.in BHEL ,1no.in Thermax ) 3x75 T.P.H., 64kg/cm2, 485±50C and with same pressure and temperature.
Worked with M/S Bhushan Steels Limited, Meramundali, Dhenkanal, Orissa as Senior engineer Power Plant in its 2x150 MW. Having C.F.B.C. boiler make (IJT) 4x250 T.P.H., 106 bar 540±5 0C and with same pressure and temperature for T.G. set capacity of 150 M.W. make siemens works ltd.
I have successfully completed pre-commissioning and commissioning and operation of 2x250 T.P.H., C.F.B.Cboiler(pr.-106 bar temp.-540c)make-(IJT) for T.G. set capacity of 150 M.W. make siemens works ltd.
Senior Engineer
M/S Aarti steels & Power Ltd(40MW)
11.2005 - 12.2009
Worked with M/S Aarti steels & Power Ltd(40MW) Athagarh (cuttack) Orissa as senior engineer 40 M.W power plant consists of: Having A.F.B.C boiler make (Cethar Vessels Ltd) 115 tph, Working pr.- 87ata,Temp.= 515±5C and also waste heat recovery boiler (w.H.R.B), 52tph with same pressure and temperature for T.G set capacity of 40mw make Siemens works ltd.
I have successfully complete pre-commissioning and commissioning of 1x200tph C.F.B.C boiler (Pr.-9.7mpa.temp.-540c)make wuxi(china)erection erection work for T.G set capacity of 50M.W make DONFANG WORKS LTD
Roles and Responsibilities
1. To ensure reliable operation of the plant by managing the control desk parameters as per operation systems and SOP
2. Analyzing the Powerplant KPIs ike Sp.Steam,Sp.fuel,BoilerEfficiency,StationHeatRate etc and preparing reports on any deviation.
3. Being the OperationManager,ensuring uninterrupted powersupply to all captive consumers.
4. Preparing the day ahead Power generation schedule by coordinating with electrical department.
5. Monitoring and control the proper operational parameters and coordinating the Shift In-charges to maintain a smooth and error free operation.
6. Collecting and analyzing the Performance reports ondaily basis and preparing the Root Cause Analysis Report if any incidents happen.
7. Scheduling the manpower for every shift and ensuring proper man power availability in both control room and field.
8. Ensuring the safety human along with the safety of equipments by preparing proper SOP of each and every jobs carried out.
9. Preparing and presenting ISO related documents in annual ISO audit.
10 .Being an internal auditor of IATF carrying out IATF internal audits in all other dep